
Go to spec numbering scheme page
3GPP Specification Change Request records for: 36.523-1
| CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
| 0001 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - New test case for E-UTRA radio bearer testing | RP-43 | RP-090298 | approved | R5 | R5-41b | R5-086137 | agreed | 2008-10-20 | LTE-UEConTest_SIG | - | 2008-12-02 |
| 0002 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Update to RLC test case 7.2.3.10 | RP-43 | RP-090298 | approved | R5 | R5-41b | R5-086240 | agreed | 2008-12-02 | LTE-UEConTest_SIG | - | 2008-12-02 |
| 0003 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to MAC test case 7.1.4.3 | RP-43 | RP-090298 | approved | R5 | R5-41b | R5-086241 | agreed | 2008-12-02 | LTE-UEConTest_SIG | - | 2008-12-02 |
| 0004 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Addition of new LTE test case UM RLC / Segmentation and Reassembly / 5-bit SN / 11-bit 'Length Indicators' / 'Framing Info Field' | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086242 | agreed | 2008-12-02 | LTE-UEConTest_SIG | - | 2008-12-02 |
| 0005 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Addition of new LTE test case UM RLC / Segmentation and Reassembly / 10-bit SN / 11-bit 'Length Indicators' / 'Framing Info Field' | RP-43 | RP-090298 | approved | R5 | R5-41b | R5-086243 | agreed | 2008-12-02 | LTE-UEConTest_SIG | - | 2008-12-02 |
| 0006 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Addition of new LTE test case UM RLC / 5-bit SN / Correct use of Sequence Numbering | RP-43 | RP-090298 | approved | R5 | R5-41b | R5-086245 | agreed | 2008-09-13 | LTE-UEConTest_SIG | - | 2008-12-02 |
| 0007 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Addition of new LTE test case UM RLC / 10 bit- SN / Correct use of Sequence Numbering | RP-43 | RP-090298 | approved | R5 | R5-41b | R5-086246 | agreed | 2009-03-04 | LTE-UEConTest_SIG | - | 2009-03-04 |
| 0008 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Addition of new LTE test case UM RLC / Concatenation, Segmentation and Reassembly | RP-43 | RP-090298 | approved | R5 | R5-41b | R5-086247 | agreed | 2009-03-04 | LTE-UEConTest_SIG | - | 2009-03-04 |
| 0009 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2: Addition of new LTE test case UM RLC / Duplicated detection of RLC PDUs | RP-43 | RP-090298 | approved | R5 | R5-41b | R5-086249 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0010 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Introduction of a new EMM test case for NW initiated detach procedure with Detach type IE = IMSI detach | RP-43 | RP-090298 | approved | R5 | R5-41b | R5-086253 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0011 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A: Introduction of a new EMM test case for Service Request procedure with mobile originating CS fallback | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086254 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0012 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Correction to Idle Mode test method | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086260 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0013 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2: Addition of E-UTRAN test case 6.1.2.8 for Cell reselection using cell status and cell reservations (access control class 0-9) | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086264 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0014 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2: Addition of E-UTRAN test case 6.1.2.9 for Cell reselection using cell status and cell reservations (access control class 11-15) | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086265 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0015 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Modification for 7.1.3.5 Correct HARQ process handling [CCCH] | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086266 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0016 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to RLC (AM) test case 7.2.3.13 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086269 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0017 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.1.2.5 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086273 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0018 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Update to test case 8.1.2.7 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086274 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0019 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Update to test case 8.1.3.5 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086275 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0020 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.2.4.2 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086284 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0021 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B - Update to test case 8.2.4.5 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086285 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0022 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2- Update to test case 8.2.4.6 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086286 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0023 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.2.4.9 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086287 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0024 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2- Update to test case 8.2.4.7 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086288 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0025 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.2.4.3 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086289 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0026 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A Update test case 8.2.1.1 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086290 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0027 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 Update test case 8.2.1.3 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086291 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0028 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A Update test case 8.2.3.1 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086293 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0029 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.3.1.8 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086295 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0030 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.3.1.9 | RP-43 | RP-090223 | approved | R5 | R5-41b | R5-086296 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0031 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Removal of E-UTRA RLC test case: 7.2.3.12 | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086297 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0032 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Removal of E-UTRA RLC test case - 7.2.3.11 AM RLC / Operation of the RLC reestablishment procedure / UE Originated | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086298 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0033 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.3.2.3 | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086299 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0034 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Update to test case 8.3.1.1 Measurement configuration control and reporting/ intra E-UTRAN measurements: event A1 | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086300 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0035 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Update to test case 8.3.1.2 Measurement configuration control and reporting/ intra E-UTRAN measurements: event A2 | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086301 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0036 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Addition of new test case 8.4.1.8 | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086305 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0037 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Addition of EMM TC 9.2.1.1.17 for Attach / rejected / no suitable cells in this tracking area | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086311 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0038 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B - New TC 9.1.2.2 Authentication not accepted by the network, GUTI used, identification procedure and authentication restart | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086318 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0039 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 3 - Removal of TC 9.1.4.1 Identification procedure, IMSI requested | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086320 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0040 | - | F | Rel-8 | 8.0.1 | 8.1.0 | New Batch 2 test case: 9.2.2.1.6 UE initiated detach / Abnormal case / local detach after 5 attempts due to no network response | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086321 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0041 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Introduction of a new EMM test case for Paging procedure with mobile terminating CS fallback. | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086322 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0042 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Correction to 9.2.3.1.1 Normal tracking area update / accepted | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086327 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0043 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Correction to 9.2.3.1.5 Periodic tracking area update / accepted | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086328 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0044 | - | F | Rel-8 | 8.0.1 | 8.1.0 | New Batch 1A test case: 9.2.1.1.7 Attach Procedure / Success / list of equivalent PLMNs in the ATTACH ACCEPT message | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086329 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0045 | - | F | Rel-8 | 8.0.1 | 8.1.0 | New Batch 2 test case: 9.2.1.1.25 Attach / Abnormal case / Mobile originated detach required | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086330 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0046 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: new EMM TC 9.2.1.1.15 for Attach / rejected / roaming not allowed in this tracking area | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086331 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0047 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Addition of EMM TC 9.2.1.2.2 Combined attach procedure / Success / EPS services only / IMSI unknown in HLR | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086332 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0048 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Addition of EMM TC 10.2.1for Dedicated EPS bearer context activation / Success | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086333 | agreed | 2009-02-13 | LTE-UEConTest_SIG | - | 2009-02-13 |
| 0049 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Addition of EMM TC 10.3.1 for EPS bearer context modification / Success | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086334 | agreed | 2009-02-13 | LTE-UEConTest_SIG | - | 2009-02-13 |
| 0050 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - New E-UTRA test case - 7.2.3.21 AM RLC / RLC re-establishment at inter eNB HO | RP-43 | RP-090224 | approved | R5 | R5-41b | R5-086341 | agreed | 2009-02-23 | LTE-UEConTest_SIG | - | 2009-02-23 |
| 0060 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Correction to E-UTRA RLC test case 7.2.3.1 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090102 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0061 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Correction to E-UTRA RLC test case 7.2.3.2 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090103 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0062 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 -Update to test case 7.2.2.8 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090124 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0063 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B -Update to test case 7.2.2.9 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090125 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0064 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A -Update to test case 8.1.1.1 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090128 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0065 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Update to test case 8.2.4.1 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090132 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0066 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.2.4.2 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090133 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0067 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.2.4.6 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090136 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0068 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.2.4.7 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090137 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0069 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.2.4.9 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090138 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0070 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Addition of new test case 8.4.1.8 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090144 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0071 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Correction to Idle mode test method | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090145 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0072 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Update to test case 8.5.4.1 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090146 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0073 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Addition of new test case 9.2.3.2.10 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090151 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0074 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Addition of new test case 9.2.3.2.15 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090153 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0075 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Removal of EMM test cases 9.2.2.2.4, 9.2.2.2.6, 9.2.2.2.7 and 9.2.2.2.8. | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090199 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0076 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.2.1 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090201 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0077 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.2.4 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090203 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0078 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.2.5 | RP-43 | RP-090278 | approved | R5 | R5-42 | R5-090230 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0079 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.3.6 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090235 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0080 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.4.11 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090236 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0081 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to MAC test case 7.1.4.3 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090347 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0082 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.5 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090453 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0083 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update of E-UTRA RLC (AM) test case 7.2.3.16 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090455 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0084 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Correction to E-UTRA RLC test case 7.2.2.7 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090498 | agreed | 2009-02-03 | LTE-UEConTest_SIG | - | 2009-02-03 |
| 0085 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Addition of a new LTE test case” 7.3.3.2 Correct functionality of EPS UP encription algorithms (SNOW 3G)” | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090511 | agreed | 2009-02-05 | LTE-UEConTest_SIG | - | 2009-02-05 |
| 0086 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Addition of a new LTE test case “7.3.3.1 Correct functionality of EPS AS encription algorithms (SNOW 3G)” | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090512 | agreed | 2009-02-05 | LTE-UEConTest_SIG | - | 2009-02-05 |
| 0087 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Addition of a new LTE test case “7.3.3.3 Correct functionality of EPS AS encription algorithms (AES)” | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090513 | agreed | 2009-02-05 | LTE-UEConTest_SIG | - | 2009-02-05 |
| 0088 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Addition of a new LTE test case “7.3.3.4 Correct functionality of EPS UP encription algorithms (AES)” | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090514 | agreed | 2009-02-05 | LTE-UEConTest_SIG | - | 2009-02-05 |
| 0089 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.2.7 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090552 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0090 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.2.8 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090553 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0091 | - | F | Rel-8 | 8.0.1 | 8.1.0 | .Bacth 1:Corrections to MAC test case 7.1.3.4 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090554 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0092 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.3.5 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090555 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0093 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.4.15 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090556 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0094 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.4.16 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090557 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0095 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Update of 36.523-1 Reference list | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090570 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0096 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2: Update of LTE TC 8.1.2.3 RRC - RRC Connection Establishment in RRC Idle state: return to idle state after T300 timeout | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090605 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0097 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2: Addition of EMM TC 9.2.1.2.4 for Successful combined attach procedure, EPS service only / CS domain not available. | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090607 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0098 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to EMM test case 9.1.3.1 | RP-43 | RP-090279 | approved | R5 | R5-42 | R5-090611 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0099 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Correction to E-UTRA RLC test case 7.2.2.3 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090631 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0100 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Update of E-UTRAN test case 6.1.1.1 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090645 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0101 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch-1B: Introduction of a new EMM test case, 9.2.3.1.4 Normal tracking area update / list of equivalent PLMNs in the TRACKING AREA UPDATE ACCEPT message | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090649 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0102 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.2.2 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090651 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0103 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1: Addition of new MAC test case 7.1.3.9 : MAC reset | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090653 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0104 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1: Addition of new MAC test case 7.1.4.12 : MAC reset | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090654 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0105 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Update of E-UTRA MAC test case: 7.1.3.3 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090655 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0106 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update of E-UTRA MAC test case: 7.1.2.9 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090656 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0107 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B - New E-UTRA PDCP test case - 7.3.1.2 Maintenance of PDCP sequence numbers (user plane, RLC UM) | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090665 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0108 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B - Correction to E-UTRA PDCP test case 7.3.1.1 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090666 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0109 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B - New E-UTRA PDCP test case - 7.3.1.3 Maintenance of PDCP sequence numbers (user plane, RLC UM, long PDCP SN (12 bits)) | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090667 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0110 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B -Update to test case 7.2.2.4 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090669 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0111 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A -Update to test case 7.2.3.3 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090670 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0112 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A -Update to test case 7.2.3.4 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090671 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0113 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Removal of TC 7.3.5.1 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090672 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0114 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.17 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090674 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0115 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.15 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090675 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0116 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B - Update of test case 8.2.2.1 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090676 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0117 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Update of RRC batch 1B test case 8.2.2.2 RRC Connection Reconfiguration / SRB/DRB Reconfiguration: Success | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090677 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0118 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch-1: Update to RRC part 3 test case 8.3.3.1 | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090678 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0119 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - TC 9.1.2.1 Authentication accepted - Update of conformance requirements | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090679 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0120 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - TC 9.3.2.1 Paging procedure revisited | RP-43 | RP-090280 | approved | R5 | R5-42 | R5-090680 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0121 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A -Update to test case 6.1.2.5 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090685 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0122 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Update of TC 7.3.6.1 PDCP Discard | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090688 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0123 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Addition of new TC 7.3.5.4 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090689 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0124 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update of LTE TC 8.5.1.3 RRC - RRC Connection Re-establishment: Failure: T311 Expiry | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090690 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0125 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 -Update to test case 8.1.2.5 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090691 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0126 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A -Update to test case 8.1.2.7 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090692 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0127 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A -Update to test case 8.1.3.5 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090693 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0128 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.2.4.3 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090694 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0129 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B - Update to test case 8.2.4.5 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090695 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0130 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Update of test case 8.2.4.1 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090707 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0131 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2: Update of RRC part1 TC 8.1.3.6 RRC Connection Release: redirection from E-UTRAN to UTRAN | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090709 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0132 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2: Update of RRC part3 TC 8.3.1.7 Measurement configuration control and reporting / intra E-UTRAN measurements: blacklisting | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090710 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0133 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Corrections to LTE idle mode test cases | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090711 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0134 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: Update of test case 6.1.2.6 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090712 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0135 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2: Update of LTE TC 8.1.2.2 RRC, Reject with wait time | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090713 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0136 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Update to test case 8.1.3.1 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090714 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0137 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: update of E-UTRA PDCP test case 7.3.6.1 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090715 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0138 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1B: update of E-UTRA PDCP test case 7.3.6.1 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090716 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0139 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Update to test case 8.3.1.8 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090717 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0140 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch-2: Update to RRC part 3 test case 8.3.1.3 | RP-43 | RP-090281 | approved | R5 | R5-42 | R5-090720 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0141 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch-2: Update to RRC part 3 test case 8.3.1.5 | RP-43 | RP-090282 | approved | R5 | R5-42 | R5-090721 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0142 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2: Addition of new EMM TC 9.2.1.2.3: Successful combined attach procedure, EPS service only / MSC temporarily not reachable | RP-43 | RP-090282 | approved | R5 | R5-42 | R5-090722 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0143 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Bacth 1:Corrections to MAC test case 7.1.2.3 | RP-43 | RP-090282 | approved | R5 | R5-42 | R5-090730 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0144 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Addition of new test case 9.2.1.2.6 | RP-43 | RP-090282 | approved | R5 | R5-42 | R5-090732 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0145 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2 - Addition of new test case 9.2.3.2.6 | RP-43 | RP-090282 | approved | R5 | R5-42 | R5-090733 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0146 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.4.2 | RP-43 | RP-090282 | approved | R5 | R5-42 | R5-090734 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0147 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1:Corrections to MAC test case 7.1.3.2 | RP-43 | RP-090282 | approved | R5 | R5-42 | R5-090735 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0148 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 2: Update of RRC part1 TC 8.1.3.4 RRC Connection Release: redirection to another E-UTRAN frequency | RP-43 | RP-090282 | approved | R5 | R5-42 | R5-090736 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0149 | - | F | Rel-8 | 8.0.1 | 8.1.0 | Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.18 | RP-43 | RP-090282 | approved | R5 | R5-42 | R5-090740 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0150 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of 9.1.2.1 test procedure sequence and editorials | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092052 | agreed | 2009-02-05 | LTE-UEConTest_SIG | - | 2009-02-05 |
| 0151 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update of TC 9.1.2.3 Authentication not accepted by the network, GUTI used, authentication reject and re-authentication | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092053 | agreed | 2009-02-05 | LTE-UEConTest_SIG | - | 2009-02-05 |
| 0152 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update TC 9.1.2.4 Authentication not accepted by the UE MAC code failure | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092054 | agreed | 2009-02-05 | LTE-UEConTest_SIG | - | 2009-02-05 |
| 0153 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - New TC 9.1.2.5 Authentication not accepted by the UE, SQN failure | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092055 | agreed | 2009-02-05 | LTE-UEConTest_SIG | - | 2009-02-05 |
| 0154 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of RRC test case 9.3.1.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092061 | agreed | 2009-02-05 | LTE-UEConTest_SIG | - | 2009-02-05 |
| 0155 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: First Iu mode to S1 mode intersystem change after attach: go to E-UTRAN RRC idle: RAU to UTRAN (9.2.3.3.1) | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092076 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0156 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Batch 2: Addition of 8.1.3.9 RRC Redirection from E-UTRAN to HRPD | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092077 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0157 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Batch 2: Addition of 8.1.3.10 RRC Redirection from E-UTRAN to CDMA2000-1XRTT | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092078 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0158 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.3.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092107 | agreed | 2009-02-13 | LTE-UEConTest_SIG | - | 2009-02-13 |
| 0159 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092108 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0160 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.4 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092109 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0161 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.5 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092110 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0162 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.8 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092112 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0163 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.10 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092113 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0164 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.13 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092114 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0165 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Proposal to remove E-UTRA RLC test case 7.2.3.19 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092115 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0166 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update of test case 8.5.1.5 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092181 | agreed | 2009-02-23 | LTE-UEConTest_SIG | - | 2009-02-23 |
| 0167 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of test case 8.2.3.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092185 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0168 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA RLC (AM) test case 7.2.3.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092190 | agreed | 2009-02-23 | LTE-UEConTest_SIG | - | 2009-02-23 |
| 0169 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA RLC (AM) test case 7.2.3.2 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092191 | agreed | 2009-02-23 | LTE-UEConTest_SIG | - | 2009-02-23 |
| 0170 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA RLC (AM) test case 7.2.3.18 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092192 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0171 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA RLC (AM) test case 7.2.3.18 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092200 | agreed | 2009-02-23 | LTE-UEConTest_SIG | - | 2009-02-23 |
| 0172 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Addition of new RRC test case 8.3.2.9 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092213 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0173 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 6.1.2.15 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092228 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0174 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update to test case 6.1.2.4 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092229 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0175 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 6.1.2.5 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092230 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0176 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update to test case 8.1.1.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092234 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0177 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.1.3.5 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092242 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0178 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority-2: A new EMM test case, 9.2.3.1.8 UE receives an indication that the RRC connection was released with cause 'load balancing TAU required'' | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092245 | agreed | 2009-02-03 | LTE-UEConTest_SIG | - | 2009-02-03 |
| 0179 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Introduction of new EMM test cases, 9.2.3.1.10 and 9.2.3.1.11 Normal tracking area update / Rejected | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092247 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0180 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Introduction of 9.2.3.1.12 ' Normal tracking area update / rejected / EPS service not allowed' | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092248 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0181 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Introduction of 9.2.3.1.13 'Normal tracking area update / rejected / UE identity cannot be derived by the network' | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092249 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0182 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Addition of a new test case 6.1.2.11 Inter-frequency cell reselection | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092250 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0183 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Introduction of 9.2.3.1.14 ' Normal tracking area update / rejected / UE implicitly detached' | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092251 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0184 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Introduction of 9.2.3.1.15 ' Normal tracking area update / rejected / PLMN not allowed' | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092252 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0185 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Introduction of 9.2.3.1.16 ' Normal tracking area update / rejected / Tracking area not allowed' | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092253 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0186 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update of RRC part1 TC 8.1.3.4 RRC Connection Release: redirection to another E-UTRAN frequency | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092258 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0187 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update of RRC part1 TC 8.1.3.6 RRC Connection Release: redirection from E-UTRAN to UTRAN | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092260 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0188 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Correction to idle mode test cases 6.1.2.3 and 6.1.2.6 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092262 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0189 | - | F | Rel-8 | 8.1.0 | 8.2.0 | LTE-SIG:TDD related updates in RRC sections | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092272 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0190 | - | F | Rel-8 | 8.1.0 | 8.2.0 | ""GCF priority 1 - Update of the LTE test caseö 7.3.3.1^^Correct functionality of EPS AS encription algorithms (SNOW 3G)ö"" | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092276 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0191 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 1 - Update of test caseö 7.3.3.2 Correct functionality of EPS UP encription algorithms (SNOW 3G)ö | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092278 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0192 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.2.4.2 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092280 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0193 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.2.4.3 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092281 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0194 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.2.4.5 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092283 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0195 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.2.4.6 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092284 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0196 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.2.4.7 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092285 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0197 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.3.1.8 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092288 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0198 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Addition of new test case 9.2.1.2.8 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092295 | agreed | 2009-02-06 | LTE-UEConTest_SIG | - | 2009-02-06 |
| 0199 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Addition of new test case 9.2.1.2.9 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092296 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0200 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Addition of new test case 9.2.1.2.10 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092297 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0201 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Addition of new test case 9.2.3.2.12 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092299 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0202 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Addition of new test case 9.3.1.4 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092300 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0203 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Addition of new test case to test case 10.X.X | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092301 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0204 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1: Update E-UTRA PDCP TC 7.3.4.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092327 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0205 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1: Update E-UTRA PDCP TC 7.3.4.2 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092328 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0206 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: Update E-UTRA PDCP TC 7.3.5.2 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092329 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0207 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: Update E-UTRA PDCP TC 7.3.5.3 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092330 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0208 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: Update E-UTRA PDCP TC 7.3.5.5 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092331 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0209 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.6 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092367 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0210 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Addition of new test case 6.2.2.3 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092396 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0211 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Addition of new test case 6.2.3.7 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092397 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0212 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Addition of new test case 6.2.3.8 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092398 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0213 | - | F | Rel-8 | 8.1.0 | 8.2.0 | ""GCF Priority 2 - Addition of new LTE test case 7.2.2.11 UM RLC / RLC re-establishment procedure"" | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092406 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0214 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2:Corrections to EMM test case 9.1.3.2 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092417 | agreed | 2009-02-04 | LTE-UEConTest_SIG | - | 2009-02-04 |
| 0215 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.3.4 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092418 | agreed | 2009-02-13 | LTE-UEConTest_SIG | - | 2009-02-13 |
| 0216 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.3.5 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092419 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0217 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.4.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092420 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0218 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: Attach / Abnormal case / Access barred because of access class barring or NAS signalling connection establishment rejected by the network | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092421 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0219 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: Corrections to EMM test case 9.4.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092422 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0220 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2:Corrections to EMM test case 9.4.3 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092423 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0221 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.1.2 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092430 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0222 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Update of RSRP / RSRQ measurement result checking to the RRC part 3 test cases | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092451 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0223 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2-Correction of the EMM test case 9.2.3.1.4 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092471 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0224 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.2.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092480 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0225 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.2.2 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092481 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0226 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.2.5 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092484 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0227 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.2.7 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092485 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0228 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.2.8 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092486 | agreed | 2009-02-23 | LTE-UEConTest_SIG | - | 2009-02-23 |
| 0229 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2: Update of 10.2.1 for Dedicated EPS bearer context activation / Success | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092500 | agreed | 2009-02-23 | LTE-UEConTest_SIG | - | 2009-02-23 |
| 0230 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2: Addition of TC 10.4.1 for EPS bearer context deactivation / Success | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092501 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0231 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2: Addition of TC 10.5.1 for UE requested PDN connectivity accepted by the network | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092502 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0232 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority TBC: Addition of TC 10.5.2 for UE requested PDN connectivity accepted by the network / no PDN address allocated | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092504 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0233 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 3: Addition of TC 10.5.3 for UE requested PDN connectivity not accepted | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092505 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0234 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2: Addition of ESM TC 10.6.1 for UE requested PDN disconnect procedure accepted by the network | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092506 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0235 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 3: Addition of ESM TC 10.6.2 for UE requested PDN disconnect procedure not accepted by the network | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092507 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0236 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2 - Update of 9.2.1.1.17 Attach / rejected / no suitable cells in tracking area | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092510 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0237 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 1: Update of EMM TC 9.3.1.2 Service Request initiated by UE for uplink signalling | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092512 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0238 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2: Update of 9.2.1.1.17 Attach / rejected / no suitable cells in tracking area | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092513 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0239 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 1: Update of 9.2.1.1.1 Attach Procedure / Success (valid GUTI) | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092514 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0240 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2: Update of 9.2.1.1.5 Attach Procedure/ Success / ATTACH ACCEPT includes the PDN address assigned to the UE | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092515 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0241 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2: Update of 9.2.1.1.9 Attach / rejected / IMSI invalid | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092516 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0242 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2: Update of 9.2.1.1.10 Attach / rejected / illegal ME | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092517 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0243 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority TBC: Update of 9.2.1.1.12 Attach / rejected / GPRS services not allowed | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092518 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0244 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of RLC section | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092539 | agreed | 2009-02-23 | LTE-UEConTest_SIG | - | 2009-02-23 |
| 0245 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Addition of a new test case 6.2.3.5 Inter-RAT Cell Reselection / from E-UTRA RRC_IDLE to UTRA_Idle | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092567 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0246 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: Inter-RAT cell Selection / from E-UTRA RRC_IDLE to UTRA_Idle, serving cell becomes non-suitable (SServingCell<0,barred) | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092569 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0247 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: Inter-RAT cell Selection / from E-UTRA RRC_IDLE to GSM_Idle/GPRS Packet_idle, serving cell becomes non-suitable (SServingCell<0,barred) | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092570 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0248 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - New E-UTRA MAC test case - 7.1.7.1.1 DL-SCH Transport Block Size support / DCI format 1 / RA type 0 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092571 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0249 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - New E-UTRA MAC test case 7.1.7.1.2 - DL-SCH Transport Block Size selection / DCI format 1 / RA type 1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092575 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0250 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - New E-UTRA MAC test case 7.1.7.2.1 - UL-SCH Transport Block Size selection / DCI format 0 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092577 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0251 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2: New MAC test case: 7.1.6.1 DRX Operation / (short cycle not configured) /Parameters configured by RRC (radio resource configuration) | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092578 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0252 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - New RRC part1 TC 8.1.3.8 RRC Connection Release: redirection from E-UTRAN to GERAN | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092579 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0253 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update of test case 8.2.1.3 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092580 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0254 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: Attach Procedure / Success (last visited TAI, TAI list and equivalent PLMN list handling) 9.2.1.1.1a | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092583 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0255 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of test case 8.2.1.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092584 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0256 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Addition of new EMM test case 9.3.1.7a | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092589 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0257 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2 - Update of 9.2.1.1.15 Attach / rejected / roaming not allowed in this tracking area | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092593 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0258 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.1.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092595 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0259 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.4.12 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092596 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0260 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update to test case 8.2.4.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092597 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0261 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Addition of new test case 8.3.2.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092700 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0262 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority-1: Correction to 9.2.3.1.1 'Normal tracking area update / accepted' | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092701 | agreed | 2009-02-11 | LTE-UEConTest_SIG | - | 2009-02-11 |
| 0263 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority-1: Correction to 9.2.3.1.5'Periodic tracking area update / accepted' | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092702 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0264 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Addition of E-UTRAN test case 6.1.2.7 for Cell reselection: Equivalent PLMN | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092703 | agreed | 2009-02-12 | LTE-UEConTest_SIG | - | 2009-02-12 |
| 0265 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update to RRC test cases | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092706 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0266 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: New MAC test case 7.1.4.14 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092712 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0267 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.1.2.5 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092713 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0268 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.1.2.7 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092714 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0269 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Addition of RRC test case 8.3.2.6 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092715 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0270 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.4.7 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092716 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0271 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - New E-UTRA MAC test case 7.1.7.1.4 - DL-SCH Transport Block Size selection / DCI format 1A / RA type 2 / Distributed VRB | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092717 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0272 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - New E-UTRA MAC test case 7.1.7.1.3 - DL-SCH Transport Block Size selection / DCI format 1A / RA type 2 / Localised VRB | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092718 | agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0273 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2: New MAC test case: 7.1.6.2 DRX Operation / Parameters (short cycle not configured) / DRX command MAC control element reception | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092730 | agreed | 2009-02-03 | LTE-UEConTest_SIG | - | 2009-02-03 |
| 0274 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Updates to E-UTRAN Idle Mode test case 6.1.2.9 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092731 | agreed | 2009-02-03 | LTE-UEConTest_SIG | - | 2009-02-03 |
| 0275 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Updates to E-UTRAN Idle Mode test case 6.1.2.8 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092732 | agreed | 2009-02-03 | LTE-UEConTest_SIG | - | 2009-02-03 |
| 0276 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update to idle mode test cases | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092741 | agreed | 2009-02-09 | LTE-UEConTest_SIG | - | 2009-02-09 |
| 0277 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Addition of new idle mode test case for ignoring CSG cells in cell selection when Allowed CSG list is empty or not supported | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092751 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0278 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: New idle mode test case 6.2.3.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092752 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0279 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.3.1.10 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092755 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0280 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.3.2.3 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092756 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0281 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Updates to E-UTRAN test case 6.1.1.1 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092758 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0282 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2: New idle mode test case 6.2.3.2 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092760 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0283 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Move common test procedure from sections 6.0.1, 6.0.2, 6.0.3 to TS 36.508 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092761 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0284 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Batch 2 - Addition of new RRC test case 8.3.2.7 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092762 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0285 | - | F | Rel-8 | 8.1.0 | 8.2.0 | Batch 2 - Addition of new RRC test case 8.3.2.8 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092763 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0286 | - | F | Rel-8 | 8.1.0 | 8.2.0 | LTE-SIG:TDD related updates in MAC sections | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092764 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0287 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority-1: Correction to 9.2.2.2.1 'NW initiated detach / re-attach required' | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092768 | agreed | 2009-02-10 | LTE-UEConTest_SIG | - | 2009-02-10 |
| 0288 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update to test case 8.3.1.9 | RP-44 | RP-090447 | approved | R5 | R5-43 | R5-092784 | agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0289 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1:Corrections to MAC test case 7.1.2.4 | RP-44 | RP-090448 | approved | R5 | R5-43 | R5-092483 | email agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0290 | 4 | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.2.3 | RP-44 | RP-090448 | approved | R5 | R5-43 | R5-092528 | email agreed | 2009-02-02 | LTE-UEConTest_SIG | - | 2009-02-02 |
| 0291 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF priority 2: A/Gb mode READY state to S1 mode cell reselection and E-UTRAN - GERAN RAU (9.2.3.4.1, 9.2.3.4.2) | RP-44 | RP-090448 | approved | R5 | R5-43 | R5-092785 | email agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0292 | - | F | Rel-8 | 8.1.0 | 8.2.0 | GCF Priority 2 - Update of TC 9.2.1.1.14 Attach / rejected / tracking area not allowed | RP-44 | RP-090448 | approved | R5 | R5-43 | R5-092786 | email agreed | 2009-02-01 | LTE-UEConTest_SIG | - | 2009-02-01 |
| 0293 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.2.6 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094075 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0294 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.3.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094076 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0295 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.3.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094078 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0296 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.3.4 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094079 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0297 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.3.5 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094080 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0298 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.3.6 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094081 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0299 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.3.7 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094082 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0300 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.4.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094083 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0301 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.4.6 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094085 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0302 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.4.7 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094086 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0303 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.4.8 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094087 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0304 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.4.11 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094088 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0305 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.4.13 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094089 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0306 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.4.15 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094090 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0307 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of PDCP test case 7.3.1.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094091 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0308 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of RRC test case 8.2.1.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094092 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0309 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of MAC test case 7.1.4.16 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094093 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0310 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of Idle Mode test case 6.1.2.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094094 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0311 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 8.1.3.4 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094095 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0312 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 8.1.3.6 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094096 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0313 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Addition of new test case 10.7.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094101 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0314 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Addition of new test case 10.7.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094102 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0315 | - | F | Rel-8 | 8.2.1 | 8.3.0 | Addition of new test case 6.2.2.5 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094114 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0316 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update to test case 8.3.1.9 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094121 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0317 | - | F | Rel-8 | 8.2.1 | 8.3.0 | Remove TC 8.4.1.8 from TS 36.523-1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094122 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0318 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Addition of new test case 8.4.2.4 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094124 | agreed | 2009-07-27 | LTE-UEConTest_SIG | - | 2009-07-27 |
| 0319 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - New EMM TC 9.1.4.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094187 | agreed | 2009-08-04 | LTE-UEConTest_SIG | - | 2009-08-04 |
| 0320 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Removal of EMM TC 9.1.2.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094189 | agreed | 2009-08-04 | LTE-UEConTest_SIG | - | 2009-08-04 |
| 0321 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC test case 7.1.4.10 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094195 | agreed | 2009-08-04 | LTE-UEConTest_SIG | - | 2009-08-04 |
| 0322 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RLC test case 7.2.3.21 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094196 | agreed | 2009-08-05 | LTE-UEConTest_SIG | - | 2009-08-05 |
| 0323 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 8.3.2.6 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094201 | agreed | 2009-08-05 | LTE-UEConTest_SIG | - | 2009-08-05 |
| 0324 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Add new RRC test case 8.4.1.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094202 | agreed | 2009-08-05 | LTE-UEConTest_SIG | - | 2009-08-05 |
| 0325 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Add new RRC test case 8.4.1.4 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094203 | agreed | 2009-08-05 | LTE-UEConTest_SIG | - | 2009-08-05 |
| 0326 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 3 - Remove RRC test case 8.1.3.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094205 | agreed | 2009-08-05 | LTE-UEConTest_SIG | - | 2009-08-05 |
| 0327 | - | F | Rel-8 | 8.2.1 | 8.3.0 | Removal of the GUTI reallocation procedures test cases | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094284 | agreed | 2009-08-11 | LTE-UEConTest_SIG | - | 2009-08-11 |
| 0328 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - TDD formulation update in 7.1.6.1 DRX Operation / (short cycle not configured) /Parameters configured by RRC (radio resource configuration) | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094289 | agreed | 2009-08-11 | LTE-UEConTest_SIG | - | 2009-08-11 |
| 0329 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - TDD formulation update in 7.1.6.2 DRX Operation / Parameters (short cycle not configured) / DRX command MAC control element reception | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094290 | agreed | 2009-08-11 | LTE-UEConTest_SIG | - | 2009-08-11 |
| 0330 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Corrections to E-UTRAN test case 6.1.1.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094366 | agreed | 2009-08-13 | LTE-UEConTest_SIG | - | 2009-08-13 |
| 0331 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Updates to E-UTRAN test case 6.1.2.7 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094369 | agreed | 2009-08-13 | LTE-UEConTest_SIG | - | 2009-08-13 |
| 0332 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Corrections to E-UTRAN test cases 6.1.2.8 and 6.1.2.9 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094372 | agreed | 2009-08-13 | LTE-UEConTest_SIG | - | 2009-08-13 |
| 0333 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update to test case 9.2.2.1.6 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094387 | agreed | 2009-08-13 | LTE-UEConTest_SIG | - | 2009-08-13 |
| 0334 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Correction of discard timer value to be consistent with test tolerances | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094392 | agreed | 2009-08-13 | LTE-UEConTest_SIG | - | 2009-08-13 |
| 0335 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Addition new test case 6.2.3.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094399 | agreed | 2009-08-13 | LTE-UEConTest_SIG | - | 2009-08-13 |
| 0336 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Corrections to MAC test case 7.1.4.6 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094426 | agreed | 2009-08-13 | LTE-UEConTest_SIG | - | 2009-08-13 |
| 0337 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Corrections to MAC test case 7.1.4.10 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094428 | agreed | 2009-08-13 | LTE-UEConTest_SIG | - | 2009-08-13 |
| 0338 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Corrections to MAC test case 7.1.4.16 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094432 | agreed | 2009-08-13 | LTE-UEConTest_SIG | - | 2009-08-13 |
| 0339 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 8.3.1.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094520 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0340 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 8.3.1.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094521 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0341 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 8.3.1.5 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094523 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0342 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of RRC test case 8.3.3.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094525 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0343 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of EMM part TC 9.1.3.1 NAS security mode command accepted by the UE | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094577 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0344 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of MAC TC 7.1.3.2 DL SPS | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094627 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0345 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of MAC TC 7.1.4.2 UL SPS | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094628 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0346 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Corrections to MAC test case 7.1.3.9 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094629 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0347 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094635 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0348 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.2.1.1.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094636 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0349 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of MAC test case 7.1.4.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094660 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0350 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Corrections to RLC section | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094662 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0351 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of RLC test case 7.2.3.9 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094664 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0352 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Addition of new EMM test case 9.2.3.3.5 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094666 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0353 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 8.3.2.8 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094674 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0354 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 3 - Update of RRC test case 8.3.2.9 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094676 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0355 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094707 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0356 | - | B | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 6.2.2.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094762 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0357 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 6.2.3.7 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094776 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0358 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 6.2.3.8 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094788 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0359 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 8.1.3.9 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094798 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0360 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 8.1.3.10 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094814 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0361 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 8.3.2.7 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094817 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0362 | - | B | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of RRC test case 8.3.2.8 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094823 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0363 | - | B | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Correction of EMM TC 9.2.1.1.9 Attach / rejected / IMSI invalid | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094833 | agreed | 2009-08-14 | LTE-UEConTest_SIG | - | 2009-08-14 |
| 0364 | 2 | B | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094866 | agreed | 2009-08-17 | LTE-UEConTest_SIG | - | 2009-08-17 |
| 0365 | 2 | B | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094867 | agreed | 2009-08-17 | LTE-UEConTest_SIG | - | 2009-08-17 |
| 0366 | 2 | B | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094868 | agreed | 2009-08-17 | LTE-UEConTest_SIG | - | 2009-08-17 |
| 0367 | 2 | B | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.4 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094869 | agreed | 2009-08-17 | LTE-UEConTest_SIG | - | 2009-08-17 |
| 0368 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-094876 | agreed | 2009-08-20 | LTE-UEConTest_SIG | - | 2009-08-20 |
| 0369 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of 9.1.2.4 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095004 | agreed | 2009-08-24 | LTE-UEConTest_SIG | - | 2009-08-24 |
| 0370 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of 9.1.2.5 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095005 | agreed | 2009-08-24 | LTE-UEConTest_SIG | - | 2009-08-24 |
| 0371 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of MAC TC 7.1.4.14 TTI Bundling | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095008 | agreed | 2009-08-24 | LTE-UEConTest_SIG | - | 2009-08-24 |
| 0372 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Various corrections to RLC section of 36.523-1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095028 | agreed | 2009-08-24 | LTE-UEConTest_SIG | - | 2009-08-24 |
| 0373 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Addition of new SMS over SGs test case 11.1.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095032 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0374 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Correction to 9.2.2.2.2 NW initiated detach / IMSI detach | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095036 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0375 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Correction of PDCP status report | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095037 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0376 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Correction of PDCP handover test procedure | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095038 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0377 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of 9.1.2.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095041 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0378 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.2.2.1.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095065 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0379 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095066 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0380 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095067 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0381 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095069 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0382 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.2.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095070 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0383 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of EMM test case 9.3.1.7a | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095073 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0384 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Corrections to MAC test case 7.1.4.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095075 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0385 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Corrections to MAC test case 7.1.4.8 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095076 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0386 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Corrections to MAC test case 7.1.4.13 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095077 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0387 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Corrections to MAC test case 7.1.4.5 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095078 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0388 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Various corrections to RLC section of 36.523-1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095086 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0389 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - New EMM TC 9.3.1.7 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095087 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0390 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update to test case 9.2.1.1.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095088 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0391 | - | F | Rel-8 | 8.2.1 | 8.3.0 | Update to GCF Priority 2 test case 9.2.1.1.7 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095089 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0392 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update to test case 9.2.2.1.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095090 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0393 | - | F | Rel-8 | 8.2.1 | 8.3.0 | Update to preamble in L2 UM test cases | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095094 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0394 | - | F | Rel-8 | 8.2.1 | 8.3.0 | Add reference to test procedure for Idle Mode section | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095097 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0395 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC part TC 7.1.2.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095103 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0396 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Corrections to MAC test case 7.1.4.11 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095104 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0397 | - | F | Rel-8 | 8.2.1 | 8.3.0 | Addition new test case 6.2.3.13 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095105 | agreed | 2009-08-25 | LTE-UEConTest_SIG | - | 2009-08-25 |
| 0398 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of 9.1.2.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095109 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0399 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.3.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095110 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0400 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Correction of EMM TC 9.2.1.1.12 Attach / rejected / EPS services not allowed | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095112 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0401 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Corrections to test case 9.2.1.1.13 Attach / rejected / PLMN not allowed | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095113 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0402 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Correction of EMM 9.2.1.1.17 TC Attach / rejected / no suitable cells in tracking area | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095116 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0403 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 3 - Correction to EMM TC 9.2.1.2.3 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095118 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0404 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Various corrections to other section of 36.523-1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095120 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0405 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Various corrections to RRC Part1 section of 36.523-1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095121 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0406 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of MAC TC 7.1.4.4 SR | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095125 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0407 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of 9.3.2.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095126 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0408 | - | F | Rel-8 | 8.2.1 | 8.3.0 | Priority 2 - Update of test case 6.2.2.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095127 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0409 | 2 | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.1.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095131 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0410 | 2 | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.2.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095132 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0411 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.5 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095133 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0412 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of cell reselection test case 6.1.2.15 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095135 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0413 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update of PDCP test case handover / In-order delivery and duplicate elimination in the downlink | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095136 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0414 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Addition of test case 11.1.3 MO-SMS over SGs in idle mode | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095139 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0415 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Correction to 9.2.3.1.2 Normal tracking area update / accepted / 'Active' flag set | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095140 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0416 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Correction of TC 9.2.1.1.14 Attach / rejected / tracking area not allowed | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095141 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0417 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Correction of EMM TC 9.2.1.1.15 Attach / rejected / roaming not allowed in this tracking area | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095148 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0418 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Addition of new test case 9.2.3.3.6 for E-UTRAN RRC connection failure / reselection of UTRAN cell / NAS signaling to release old S1 interface connection | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095149 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0419 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Update to test case 10.8.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095150 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0420 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Addition of new SMS over SGs test case 11.1.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095151 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0421 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Various corrections to Idle Mode section of 36.523-1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095161 | agreed | 2009-08-26 | LTE-UEConTest_SIG | - | 2009-08-26 |
| 0422 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.2.4 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095164 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0423 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 4 - New TC 8.1.3.7 RRC Connection Release: redirection from UTRAN to E-UTRAN | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095172 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0424 | 1 | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 3 - Update to test case 9.2.2.1.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095173 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0425 | 1 | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 3 - Correction to 9.2.1.2.1 ''Combined attach procedure / Success / EPS and non-EPS services'' | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095175 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0426 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 3 - to EMM TC 9.2.1.1.19 Attach / Abnormal case / Failure due to non integrity protection | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095177 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0427 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 3 - New EMM TC 9.2.3.2.1a Combined tracking area update / successful / check of last visited TAI and handling of TAI list, LAI and TMSI | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095178 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0428 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 3 - Addition of new test case 6.2.2.4 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095179 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0429 | 3 | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.2.1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095188 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0430 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 2 - Addition of new test case 8.4.2.2 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095207 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0431 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Corrections to RLC test case 7.2.3.7 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095208 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0432 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Corrections to PDCP test cases 7.5.3.2 and 7.5.3.3 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095217 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0433 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Various corrections to RRC Part2 section of 36.523-1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095219 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0434 | - | F | Rel-8 | 8.2.1 | 8.3.0 | GCF Priority 1 - Various corrections to RRC Part 3 section of 36.523-1 | RP-45 | RP-090802 | approved | R5 | R5-44 | R5-095220 | agreed | 2009-08-27 | LTE-UEConTest_SIG | - | 2009-08-27 |
| 0435 | - | F | Rel-8 | 8.3.2 | 8.4.0 | 6.2.3.21 Inter-RAT Cell Reselection / from GPRS Packet_Transfer (NCO mode) to E_UTRA TS 36.523-1 | GP-44 | GP-092405 | approved | G3new | G3new-44 | GP-092405 | agreed | 2009-11-19 | LTE-UEConTest_SIG | - | 2009-11-19 |
| 0436 | - | F | Rel-8 | 8.3.2 | 8.4.0 | Removal of TC 8.1.2.10 from TS 36.523-1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095444 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0437 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Various corrections to RRC Part 2 section of 36.523-1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095446 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0438 | - | F | Rel-8 | 8.3.2 | 8.4.0 | Removal of TC 8.2.1.2 from TS 36.523-1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095447 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0439 | - | F | Rel-8 | 8.3.2 | 8.4.0 | Removal of TC 8.2.1.4 from TS 36.523-1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095448 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0440 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update to test case 8.2.4.5 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095450 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0441 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Update to test case 8.2.4.9 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095451 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0442 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of test case 9.2.3.1.9a | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095462 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0443 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of test case 9.3.1.16 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095467 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0444 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update test case 6.1.2.11 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095505 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0445 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction for Measurement test cases | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095507 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0446 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update of RLC test case 7.2.3.14 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095521 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0447 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of EMM test case 9.2.3.3.5 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095524 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0448 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of EMM test case 9.3.1.7a | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095525 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0449 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of E-UTRAN test case 8.3.1.11 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095597 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0450 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update of EMM test case 9.2.3.1.5 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095609 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0451 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Removal of TC 8.4.2.6 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095621 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0452 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction to test case 6.1.1.1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095774 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0453 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Update to test case 9.2.1.1.25 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095783 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0454 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update to test case 9.2.2.1.1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095784 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0455 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Update to test case 9.2.2.1.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095785 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0456 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update to test case 9.2.2.1.6 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095786 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0457 | - | F | Rel-8 | 8.3.2 | 8.4.0 | Addition of new DSMIPv6 test case for Discovery of the Home Agent via DNS | RP-46 | RP-091132 | approved | R5 | R5-45 | R5-095795 | agreed | 2009-10-27 | DSMIPv6_UEConTest | - | 2009-10-27 |
| 0458 | - | F | Rel-8 | 8.3.2 | 8.4.0 | Addition of new DSMIPv6 test case for Security association establishment without Home Agent reallocation procedure | RP-46 | RP-091132 | approved | R5 | R5-45 | R5-095796 | agreed | 2009-10-27 | DSMIPv6_UEConTest | - | 2009-10-27 |
| 0459 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new RRC test case 8.4.5.4 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095802 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0460 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new RRC test case 8.4.7.3 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095803 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0461 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new RRC test case 8.4.7.4 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095804 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0462 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Correction of TC 9.2.1.1.1 Attach Procedure / Success (valid GUTI) | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095884 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0463 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority x - Proposed removal of TC 9.3.1.2 Service Request initiated by UE for uplink signalling | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095885 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0464 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Proposed removal of TC 9.2.1.1.5 Attach Procedure / Success / ATTACH ACCEPT message includes the PDN address assigned to the UE | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095886 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0465 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 9.2.3.3.6 E-UTRAN RRC connection failure / reselection of UTRAN cell / NAS signaling to release old S1 interface connection | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095901 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0466 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.6 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095937 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0467 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of TC 9-1-2-5 for IP handling over U-plane | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095963 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0468 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update of TC 9-1-2-1 for IP handling over U-plane | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095972 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0469 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of TC 9-3-1-7 for IP handling over U-plane | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095976 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0470 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of TC 9-1-2-4 for IP handling over U-plane | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095979 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0471 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Test Case 9.1.4.2 Clause title formatting error | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095980 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0472 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction to RRC test case 8.5.1.1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-095997 | agreed | 2009-10-27 | LTE-UEConTest_SIG | - | 2009-10-27 |
| 0473 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.2.3.5 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096009 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0474 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1: Cell number allignment in Test case 9.1.3.1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096024 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0475 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Cell number allignment in Test case 9.1.3.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096027 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0476 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Cell number allignment in Test case 9.4.1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096029 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0477 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2: Cell number allignment in Test case 9.4.3 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096031 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0478 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2: Correction to Test case 7.1.4.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096034 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0479 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2: Correction to Test case 7.1.4.14 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096036 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0480 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - update test case 8.5.1.3 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096149 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0481 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of RLC test case 7.2.3.13 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096156 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0482 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of TC 9-1-2-3 for IP handling over U-plane | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096160 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0483 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 and Priority 2- EMM Successful Attach consistent description | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096161 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0484 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction test cases 8.3.2.1, 8.3.2.7 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096178 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0485 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Various editorial corrections to RLC section | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096192 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0486 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update to Idle Mode test case 6.1.2.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096193 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0487 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Updated to test case 6.1.2.6 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096194 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0488 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction to test case 6.3.6 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096196 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0489 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction to test case 6.1.2.7 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096197 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0490 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.9 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096401 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0491 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 & 3 - Correction to test cases 9.2.1.1.9 and 9.2.1.1.12 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096414 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0492 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1: Update of MAC TC 7.1.7.1.1 DL-SCH TBS selection/DCI format 1/RA type0 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096421 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0493 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1: Update of MAC TC 7.1.7.1.2 DL-SCH TBS selection/DCI format 1/RA type1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096422 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0494 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1: Update of MAC TC 7.1.7.1.3 DL-SCH TBS selection/DCI format 1A/RA type2/Localized VRB | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096423 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0495 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1: Update of MAC TC 7.1.7.1.4 DL-SCH TBS selection/DCI format 1A/RA type2/Distributed VRB | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096424 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0496 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1: Update of MAC TC 7.1.7.2.1 UL-SCH TBS selection/DCI format 0 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096425 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0497 | 1 | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1: Update of E-UTRA MAC test case 7.1.4.7 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096426 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0498 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1: Update of E-UTRA MAC test case 7.1.3.7 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096428 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0499 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update to test case 9.2.1.1.7 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096429 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0500 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3: Introduction of a new EMM test case 9.2.3.1.6' Normal tracking area update / UE with ISR active moves to E-UTRAN ' | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096435 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0501 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3: Introduction of 9.2.3.1.17 Normal tracking area update / rejected / Roaming not allowed in this tracking area | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096436 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0502 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3: Introduction of 9.2.3.1.18 Normal tracking area update / rejected / EPS services not allowed in this PLMN | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096437 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0503 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3: Addition of new test case 9.2.1.1.24: Attach / Abnormal case / Change of cell into a new tracking area | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096443 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0504 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3: Addition of new test case 9.2.1.1.26: Attach / Abnormal case / Detach procedure collision | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096444 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0505 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2: Correction to Test case 7.1.3.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096445 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0506 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1: Correction to EMM test case 9.3.1.1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096446 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0507 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of test cases 9.2.1.1.9, 9.2.1.1.10, 9.2.1.1.11 Attach / rejected / IMSI invalid / Illegal UE / EPS and non-EPS services not allowed | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096451 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0508 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 9.2.3.2.1 Combined tracking area update / successful | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096452 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0509 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 9.2.3.3.1 First Iu mode to S1 mode intersystem change after attach: go to E-UTRAN RRC idle: RAU to UTRAN | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096454 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0510 | - | F | Rel-8 | 8.3.2 | 8.4.0 | Disabling PHR and periodic BSR for L2 test cases in 36.523-1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096459 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0511 | - | F | Rel-8 | 8.3.2 | 8.4.0 | Correction of test case 6.1.2.13 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096466 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0512 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.13 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096467 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0513 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.10 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096468 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0514 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of E-UTRAN test case 8.3.3.3 for Measurement configuration control and reporting / SON / ANR: CGI reporting of GERAN cell | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096470 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0515 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of E-UTRAN test case 8.3.3.2 :Measurement configuration control and reporting / SON / ANR: CGI reporting of UTRAN cell | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096471 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0516 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update of Multi-layer Procedures part TC 13.1.1 Activation and deactivation of additional data radio bearer in E-UTRA | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096472 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0517 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Update of RRC part TC 8.5.1.2 RRC Connection Re-establishment: Success (after Radio Link Failure) | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096476 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0518 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Update of RRC test case 8.2.1.7 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096479 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0519 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update to test case 7.2.3.4 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096481 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0520 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Correction of TC 8.5.4.1 UE capability transfer / Success | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096482 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0521 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update of PDCP test case 7.3.3.1 : Ciphering and Deciphering: Correct functionality of EPS AS encription algorithms (SNOW 3G) | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096483 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0522 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1: Correction to RRC test case 8.2.1.1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096484 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0523 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update of EMM test case 9.2.3.1.1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096485 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0524 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Various corrections to Idle Mode section of 36.523-1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096487 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0525 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update to test case 8.1.2.5 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096488 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0526 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update to test case 8.1.2.7 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096489 | agreed | 2009-10-28 | LTE-UEConTest_SIG | - | 2009-10-28 |
| 0527 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Various corrections to RRC Part 3 section of 36.523-1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096491 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0528 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Correction to E-UTRA DRB test case 12.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096492 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0529 | 3 | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update of Multi-layer Procedures part TC 13.2.1 RRC Connection Reconfiguration: E-UTRA to E-UTRA | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096493 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0530 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update of applicabilty entry for DRB test case 12.3 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096494 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0531 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of the test case 6.2.3.3 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096495 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0532 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of Idle Mode Operations test case 6.1.2.5 Cell reselection for inter-band operation | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096496 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0533 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of Idle Mode Operations test case 6.6.2.3.7 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096497 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0534 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2: Correction to the MAC DRX test cases preamble | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096502 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0535 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 9.2.1.1.13 Attach / rejected / PLMN not allowed | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096505 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0536 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 9.2.1.1.14 Attach / rejected / tracking area not allowed | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096506 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0537 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 9.2.1.1.15 Attach / rejected / roaming not allowed in this tracking area | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096507 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0538 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - New TC 9.2.1.1.16 Attach / rejected / EPS services not allowed in this PLMN | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096508 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0539 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 9.2.1.1.17 Attach / rejected / no suitable cells in tracking area | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096509 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0540 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 9.2.1.2.4 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096510 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0541 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 10.2.1 Dedicated EPS bearer context activation / Success | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096511 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0542 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 10.3.1 EPS bearer context modification / Success | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096512 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0543 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 10.6.1 UE requested PDN disconnect procedure accepted by the network | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096514 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0544 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of RRC test case 8.3.2.7 : Measurement configuration control and reporting / inter-RAT measurements: event B2 (measurement HRPD cells) | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096605 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0545 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of RRC test case 8.3.2.6 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096606 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0546 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of RRC test case 8.4.1.4 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096610 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0547 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update of RRC test case 8.4.1.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096611 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0548 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update to test case 8.4.2.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096612 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0549 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update to test case 8.4.2.4 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096613 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0550 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of test case 6.2.3.6 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096615 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0551 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Update to test case 8.1.1.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096616 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0552 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of test case 8.2.4.4 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096617 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0553 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Update to test case 8.1.3.5 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096618 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0554 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2: Updates to TAU/RAU procedure for inter-system cell re-selection between A/Gb and S1 modes | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096619 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0555 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2: Updates to Attach Procedure / Success (last visited TAI, TAI list and equivalent PLMN list handling) | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096620 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0556 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction to TC 8.1.3.8 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096621 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0557 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Update test case 8.3.1.4 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096622 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0558 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update of RRC test case 8.2.2.1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096627 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0559 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update of RRC test case 8.2.2.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096628 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0560 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Various corrections to EMM section of 36.523-1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096629 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0561 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 9.2.1.2.5 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096630 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0562 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Update to test case 9.2.1.2.6 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096631 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0563 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of test case 9.2.1.2.7 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096632 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0564 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of test case 9.2.1.2.11 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096633 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0565 | 1 | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of test case 9.2.1.2.13 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096634 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0566 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 9.2.1.2.15 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096635 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0567 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of test cases 9.2.3.1.23 and 9.2.3.1.24 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096636 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0568 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 9.2.3.1.25 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096637 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0569 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 9.2.3.2.9 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096638 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0570 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Update to test case 9.3.1.4 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096639 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0571 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 1 - Update of RLC test case 7.2.3.9 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096643 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0572 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 8.3.3.4 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096645 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0573 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 8.3.3.5 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096646 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0574 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 10.7.3 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096647 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0575 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 10.7.4 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096648 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0576 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority TBC - Addition of new test case 10.7.5 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096649 | agreed | 2009-10-29 | LTE-UEConTest_SIG | - | 2009-10-29 |
| 0577 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 10.8.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096650 | agreed | 2009-10-30 | LTE-UEConTest_SIG | - | 2009-10-30 |
| 0578 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 10.8.3 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096651 | agreed | 2009-10-30 | LTE-UEConTest_SIG | - | 2009-10-30 |
| 0579 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority TBC - Addition of new test case 10.8.4 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096652 | agreed | 2009-10-30 | LTE-UEConTest_SIG | - | 2009-10-30 |
| 0580 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 10.8.5 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096653 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0581 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 10.8.6 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096654 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0582 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 10.8.7 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096655 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0583 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 10.5.1 UE requested PDN connectivity procedure accepted by the network | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096656 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0584 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Addition of test case 11.1.4 MO-SMS over SGs in active mode | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096657 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0585 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 2 - Correction of TC 10.4.1 EPS bearer context deactivation / Success | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096658 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0586 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of EMM test case 9.1.2.6 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096660 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0587 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new EMM test case 9.1.5.2 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096661 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0588 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new EMM test case 9.2.1.1.18 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096662 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0589 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of EMM test case 9.2.1.2.12 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096663 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0590 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of EMM test case 9.2.2.2.14 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096665 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0591 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of EMM test case 9.2.3.1.26 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096666 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0592 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of EMM test case 9.2.3.1.27 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096667 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0593 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of EMM test case 9.2.3.1.28 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096668 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0594 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of EMM test case 9.3.1.15 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096669 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0595 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of new test case 9.3.1.17 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096670 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0596 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Correction of TC 9.2.1.2.2 Combined attach procedure / Success / EPS services only / IMSI unknown in HSS | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096671 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0597 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Correction of TC 9.2.1.2.3 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096672 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0598 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3: Introduction of 9.2.3.1.19 Normal tracking area update / rejected / No Suitable Cells in tracking Area | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096673 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0599 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Update of E-UTRAN test case 9.2.1.1.20 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096692 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0600 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Correction of TC 9.2.1.1.19 Attach / Abnormal case / Failure due to non integrity protection | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096693 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0601 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3: Addition of new test case 9.2.1.1.21: Attach / Abnormal case / success after several attempts due to no network response | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096694 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0602 | - | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3: Addition of new test case 9.2.1.1.22: : Attach / Abnormal case / unssuccesful attach after 5 attempts | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096695 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0603 | 1 | F | Rel-8 | 8.3.2 | 8.4.0 | GCF Priority 3 - Addition of test case 13.3.1.1 | RP-46 | RP-091122 | approved | R5 | R5-45 | R5-096697 | agreed | 2009-11-24 | LTE-UEConTest_SIG | - | 2009-11-24 |
| 0604 | - | B | Rel-8 | 8.4.0 | - | CR 36.523-1-0604 6.2.3.19 : Redirection to E-UTRA upon the release of the CS connection | - | - | - | G3new | G3new-45 | GP-100096 | withdrawn | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0604 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Addition of new DSMIPv6 test case for Registration of a new IPv6 CoA (Binding Update/Acknowledgment procedure in IPv6 network) | RP-47 | RP-100181 | approved | R5 | R5-46 | R5-100058 | agreed | 2010-01-14 | DSMIPv6_UEConTest | - | 2010-01-14 |
| 0605 | - | B | Rel-8 | 8.4.0 | - | CR 36.523-1-0605 6.2.3.22: Inter-RAT Autonomous Cell Reselection failure GPRS Packet_transfer to E-UTRA (NC0 mode) | - | - | - | G3new | G3new-45 | GP-100098 | revised | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0605 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Addition of new DSMIPv6 test case for Re-registration of IPv6 CoA | RP-47 | RP-100181 | approved | R5 | R5-46 | R5-100059 | agreed | 2010-01-14 | DSMIPv6_UEConTest | - | 2010-01-14 |
| 0605 | 1 | B | Rel-8 | 8.4.0 | 8.5.0 | CR 36.523-1-0605 6.2.3.22: Inter-RAT Autonomous Cell Reselection failure GPRS Packet_transfer to E-UTRA (NC0 mode) | GP-45 | GP-100543 | approved | G3new | G3new-45 | GP-100543 | agreed | 2010-03-04 | LTE-UEConTest_SIG | - | 2010-03-04 |
| 0606 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Addition of new DSMIPv6 test case for Return to home link | RP-47 | RP-100181 | approved | R5 | R5-46 | R5-100060 | agreed | 2010-01-14 | DSMIPv6_UEConTest | - | 2010-01-14 |
| 0607 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Addition of new DSMIPv6 test case for Dual-Stack Mobile IPv6 detach in IPv6 network | RP-47 | RP-100181 | approved | R5 | R5-46 | R5-100061 | agreed | 2010-01-14 | DSMIPv6_UEConTest | - | 2010-01-14 |
| 0608 | - | F | Rel-8 | 8.4.0 | - | GCF priority 2 - Correction of test case 10.5.1 for UE requested PDN connectivity accepted by the network | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100089 | agreed | 2010-02-01 | LTE-UEConTest_SIG | - | 2010-02-01 |
| 0608 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 2 - Correction of test case 10.5.1 for UE requested PDN connectivity accepted by the network | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100089 | agreed | 2010-02-01 | LTE-UEConTest_SIG | - | 2010-02-01 |
| 0609 | - | F | Rel-8 | 8.4.0 | - | GCF priority 3 - Correction of test case 9.2.1.2.2 for Combined attach procedure / Success / EPS services only / IMSI unknown in HSS | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100096 | agreed | 2010-02-02 | LTE-UEConTest_SIG | - | 2010-02-02 |
| 0609 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 3 - Correction of test case 9.2.1.2.2 for Combined attach procedure / Success / EPS services only / IMSI unknown in HSS | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100096 | agreed | 2010-02-02 | LTE-UEConTest_SIG | - | 2010-02-02 |
| 0610 | - | F | Rel-8 | 8.4.0 | - | GCF priority 2: correction of test case 9.2.3.3.1 First Iu mode to S1 mode intersystem change after attach: go to E-UTRAN RRC idle: RAU to UTRAN | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100100 | agreed | 2010-02-02 | LTE-UEConTest_SIG | - | 2010-02-02 |
| 0610 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 2: correction of test case 9.2.3.3.1 First Iu mode to S1 mode intersystem change after attach: go to E-UTRAN RRC idle: RAU to UTRAN | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100100 | agreed | 2010-02-02 | LTE-UEConTest_SIG | - | 2010-02-02 |
| 0611 | - | F | Rel-8 | 8.4.0 | - | Update of test case 9.2.3.1.28 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100173 | agreed | 2010-02-06 | LTE-UEConTest_SIG | - | 2010-02-06 |
| 0611 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Update of test case 9.2.3.1.28 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100173 | agreed | 2010-02-06 | LTE-UEConTest_SIG | - | 2010-02-06 |
| 0612 | - | F | Rel-8 | 8.4.0 | - | Update of test case 9.1.5.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100175 | agreed | 2010-02-06 | LTE-UEConTest_SIG | - | 2010-02-06 |
| 0612 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Update of test case 9.1.5.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100175 | agreed | 2010-02-06 | LTE-UEConTest_SIG | - | 2010-02-06 |
| 0613 | - | F | Rel-8 | 8.4.0 | - | Update of test case 9.1.2.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100176 | agreed | 2010-02-06 | LTE-UEConTest_SIG | - | 2010-02-06 |
| 0613 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Update of test case 9.1.2.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100176 | agreed | 2010-02-06 | LTE-UEConTest_SIG | - | 2010-02-06 |
| 0614 | - | F | Rel-8 | 8.4.0 | - | Priority 2-Update of the case 6.2.2.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100182 | agreed | 2010-02-06 | LTE-UEConTest_SIG | - | 2010-02-06 |
| 0614 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Priority 2-Update of the case 6.2.2.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100182 | agreed | 2010-02-06 | LTE-UEConTest_SIG | - | 2010-02-06 |
| 0615 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Update of MAC TC 7.1.2.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100242 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0615 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Update of MAC TC 7.1.2.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100242 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0616 | - | F | Rel-8 | 8.4.0 | - | Correcction to MAC TBS selection TCs not to use RS power boosting | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100263 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0616 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Correcction to MAC TBS selection TCs not to use RS power boosting | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100263 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0617 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update to test case 7.2.2.9 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100270 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0617 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update to test case 7.2.2.9 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100270 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0618 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 8.1.1.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100271 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0618 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 8.1.1.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100271 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0619 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.2.4.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100274 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0619 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.2.4.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100274 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0620 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 8.2.4.4 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100275 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0620 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 8.2.4.4 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100275 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0621 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.2.4.5 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100276 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0621 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.2.4.5 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100276 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0622 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.2.4.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100277 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0622 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.2.4.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100277 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0623 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.2.4.7 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100278 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0623 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.2.4.7 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100278 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0624 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 8.2.4.9 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100279 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0624 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 8.2.4.9 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100279 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0625 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.3.1.9 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100281 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0625 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.3.1.9 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100281 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0626 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.3.2.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100283 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0626 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.3.2.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100283 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0627 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.4.2.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100284 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0627 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.4.2.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100284 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0628 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.4.2.4 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100285 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0628 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.4.2.4 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100285 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0629 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 9.2.1.2.5 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100287 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0629 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 9.2.1.2.5 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100287 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0630 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 9.2.1.2.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100288 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0630 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 9.2.1.2.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100288 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0631 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 9.2.1.2.7 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100289 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0631 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 9.2.1.2.7 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100289 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0632 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 9.2.1.2.8 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100290 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0632 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 9.2.1.2.8 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100290 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0633 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 9.2.3.2.9 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100293 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0633 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 9.2.3.2.9 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100293 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0634 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 9.3.1.4 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100294 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0634 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 9.3.1.4 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100294 | agreed | 2010-02-09 | LTE-UEConTest_SIG | - | 2010-02-09 |
| 0635 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1- Update of MAC test cases 7.1.4.6, 7.1.4.7, 7.1.4.8 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100383 | agreed | 2010-02-10 | LTE-UEConTest_SIG | - | 2010-02-10 |
| 0635 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1- Update of MAC test cases 7.1.4.6, 7.1.4.7, 7.1.4.8 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100383 | agreed | 2010-02-10 | LTE-UEConTest_SIG | - | 2010-02-10 |
| 0636 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Correction to remark in 6.2.2.1, 6.2.2.2 and 6.2.3.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100415 | agreed | 2010-02-10 | LTE-UEConTest_SIG | - | 2010-02-10 |
| 0636 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Correction to remark in 6.2.2.1, 6.2.2.2 and 6.2.3.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100415 | agreed | 2010-02-10 | LTE-UEConTest_SIG | - | 2010-02-10 |
| 0637 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Correction to test case 6.1.2.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100416 | agreed | 2010-02-10 | LTE-UEConTest_SIG | - | 2010-02-10 |
| 0637 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Correction to test case 6.1.2.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100416 | agreed | 2010-02-10 | LTE-UEConTest_SIG | - | 2010-02-10 |
| 0638 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2: Update to test case 9.2.3.1.4 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100443 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0638 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2: Update to test case 9.2.3.1.4 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100443 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0639 | - | F | Rel-8 | 8.4.0 | - | Correction of test case 8.3.1.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100462 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0639 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Correction of test case 8.3.1.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100462 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0640 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Addition of new DSMIPv6 test case for Registration of a new IPv4 CoA (Binding Update/Acknowledgment procedure in IPv4 network) | RP-47 | RP-100181 | approved | R5 | R5-46 | R5-100467 | agreed | 2010-02-11 | DSMIPv6_UEConTest | - | 2010-02-11 |
| 0641 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Addition of new DSMIPv6 test case for Re-registration of IPv4 CoA | RP-47 | RP-100181 | approved | R5 | R5-46 | R5-100468 | agreed | 2010-02-11 | DSMIPv6_UEConTest | - | 2010-02-11 |
| 0642 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Addition of new DSMIPv6 test case for Dual-Stack Mobile IPv6 detach in IPv4 network | RP-47 | RP-100181 | approved | R5 | R5-46 | R5-100469 | agreed | 2010-02-11 | DSMIPv6_UEConTest | - | 2010-02-11 |
| 0643 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to P2 EMM test case 9.2.2.1.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100470 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0643 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to P2 EMM test case 9.2.2.1.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100470 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0644 | - | F | Rel-8 | 8.4.0 | - | Update to P3 EMM test case 9.2.2.1.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100471 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0644 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Update to P3 EMM test case 9.2.2.1.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100471 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0645 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to P2 EMM test case 9.2.2.1.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100472 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0645 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to P2 EMM test case 9.2.2.1.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100472 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0646 | - | F | Rel-8 | 8.4.0 | - | Removal of TC 10.5.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100475 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0646 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Removal of TC 10.5.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100475 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0647 | - | F | Rel-8 | 8.4.0 | - | GCF priority 1 - Update of RRC test case 8.2.2.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100488 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0647 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 1 - Update of RRC test case 8.2.2.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100488 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0648 | - | F | Rel-8 | 8.4.0 | - | GCF priority 1 - Update of RRC test case 8.2.2.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100489 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0648 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 1 - Update of RRC test case 8.2.2.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100489 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0649 | - | F | Rel-8 | 8.4.0 | - | GCF priority 1 - Update of RRC test case 8.2.3.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100492 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0649 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 1 - Update of RRC test case 8.2.3.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100492 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0650 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Clarification to UE initial state for test case 7.1.2.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100500 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0650 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Clarification to UE initial state for test case 7.1.2.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100500 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0651 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Clarification to UE initial state | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100501 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0651 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Clarification to UE initial state | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100501 | agreed | 2010-02-11 | LTE-UEConTest_SIG | - | 2010-02-11 |
| 0652 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to E-UTRA RLC test case 7.2.3.21 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100537 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0652 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to E-UTRA RLC test case 7.2.3.21 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100537 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0653 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100577 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0653 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100577 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0654 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.7 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100582 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0654 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.7 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100582 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0655 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Correction to P3 EMM test case 9.2.1.2.12 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100592 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0655 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Correction to P3 EMM test case 9.2.1.2.12 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100592 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0656 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100625 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0656 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100625 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0657 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.2.5.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100638 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0657 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.2.5.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100638 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0658 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.2.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100639 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0658 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.2.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100639 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0659 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.2.7 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100642 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0659 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.2.7 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100642 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0660 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.3.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100651 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0660 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.3.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100651 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0661 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.3.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100652 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0661 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.3.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100652 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0662 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.3.5 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100657 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0662 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.3.5 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100657 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0663 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.3.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100659 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0663 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.3.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100659 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0664 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100671 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0664 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100671 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0665 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100676 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0665 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100676 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0666 | - | F | Rel-8 | 8.4.0 | - | Priority 2 - Incorrect ATTACH procedure to UTRAN and GERAN cells | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100738 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0666 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Priority 2 - Incorrect ATTACH procedure to UTRAN and GERAN cells | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100738 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0667 | - | F | Rel-8 | 8.4.0 | - | GCF Priority x - Clarification to E-UTRA Radio Bearer Tests section | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100741 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0667 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority x - Clarification to E-UTRA Radio Bearer Tests section | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100741 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0668 | - | F | Rel-8 | 8.4.0 | - | Priority 3 - TC 9.2.3.1.15 Normal tracking area update / rejected / PLMN not allowed - problems with Test procedure sequence | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100742 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0668 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Priority 3 - TC 9.2.3.1.15 Normal tracking area update / rejected / PLMN not allowed - problems with Test procedure sequence | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100742 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0669 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Adding new TC 9.1.5.1 EMM Information Procedure | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100745 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0669 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Adding new TC 9.1.5.1 EMM Information Procedure | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100745 | agreed | 2010-02-12 | LTE-UEConTest_SIG | - | 2010-02-12 |
| 0670 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update of MAC test case 7.1.4.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-100777 | agreed | 2010-02-22 | LTE-UEConTest_SIG | - | 2010-02-22 |
| 0670 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update of MAC test case 7.1.4.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-100777 | agreed | 2010-02-22 | LTE-UEConTest_SIG | - | 2010-02-22 |
| 0671 | - | F | Rel-8 | 8.4.0 | - | Priority ALL - Update of section 6 Idle Mode Operations to comply with RAN5 PRD13 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101011 | agreed | 2010-02-22 | LTE-UEConTest_SIG | - | 2010-02-22 |
| 0671 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Priority ALL - Update of section 6 Idle Mode Operations to comply with RAN5 PRD13 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101011 | agreed | 2010-02-22 | LTE-UEConTest_SIG | - | 2010-02-22 |
| 0672 | - | F | Rel-8 | 8.4.0 | - | Priority ALL - Update of section 9.1.x and 9.2.1.x to indicate on which cell events are to be observed in multi cell environment | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101012 | agreed | 2010-02-22 | LTE-UEConTest_SIG | - | 2010-02-22 |
| 0672 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Priority ALL - Update of section 9.1.x and 9.2.1.x to indicate on which cell events are to be observed in multi cell environment | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101012 | agreed | 2010-02-22 | LTE-UEConTest_SIG | - | 2010-02-22 |
| 0673 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Removal of test case 9.2.3.2.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101013 | agreed | 2010-02-22 | LTE-UEConTest_SIG | - | 2010-02-22 |
| 0673 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Removal of test case 9.2.3.2.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101013 | agreed | 2010-02-22 | LTE-UEConTest_SIG | - | 2010-02-22 |
| 0674 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 9.2.3.2.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101014 | agreed | 2010-02-22 | LTE-UEConTest_SIG | - | 2010-02-22 |
| 0674 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 9.2.3.2.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101014 | agreed | 2010-02-22 | LTE-UEConTest_SIG | - | 2010-02-22 |
| 0675 | 2 | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Correction of RRC test cases 8.3.1.3 and 8.3.1.5 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101032 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0675 | 2 | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Correction of RRC test cases 8.3.1.3 and 8.3.1.5 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101032 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0676 | 1 | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Correction of RRC test cases 8.3.1.7 and 8.3.1.11 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101033 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0676 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Correction of RRC test cases 8.3.1.7 and 8.3.1.11 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101033 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0677 | - | F | Rel-8 | 8.4.0 | - | Correction of test case 6.2.3.13 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101038 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0677 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Correction of test case 6.2.3.13 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101038 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0678 | - | F | Rel-8 | 8.4.0 | - | Correction for Measurement related test cases | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101039 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0678 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Correction for Measurement related test cases | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101039 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0679 | - | F | Rel-8 | 8.4.0 | - | GCF priority 2 - Update of RRC test case 8.2.1.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101053 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0679 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 2 - Update of RRC test case 8.2.1.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101053 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0680 | - | F | Rel-8 | 8.4.0 | - | Priority ALL - Update of section 7 Layer 2 to comply with RAN5 PRD13 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101056 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0680 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Priority ALL - Update of section 7 Layer 2 to comply with RAN5 PRD13 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101056 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0681 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Various corrections to Idle Mode section 6.1 of 36.523-1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101057 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0681 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Various corrections to Idle Mode section 6.1 of 36.523-1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101057 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0682 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to E-UTRAN PDPC test case 7.1.4.4 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101062 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0682 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to E-UTRAN PDPC test case 7.1.4.4 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101062 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0683 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1:Update of MAC TC 7.1.2.5 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101063 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0683 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1:Update of MAC TC 7.1.2.5 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101063 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0684 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Update of MAC TC 7.1.2.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101064 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0684 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Update of MAC TC 7.1.2.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101064 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0685 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Update of MAC TC 7.1.2.9 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101065 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0685 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Update of MAC TC 7.1.2.9 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101065 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0686 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Update of MAC TC 7.1.3.9 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101066 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0686 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Update of MAC TC 7.1.3.9 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101066 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0687 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Update of MAC TC 7.1.4.8 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101067 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0687 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Update of MAC TC 7.1.4.8 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101067 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0688 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Update of MAC TC 7.1.4.11 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101068 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0688 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Update of MAC TC 7.1.4.11 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101068 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0689 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Corrections to TC 8.5.1.2 RRC Connection Re-establishment: Success (after Radio Link Failure) | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101069 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0689 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Corrections to TC 8.5.1.2 RRC Connection Re-establishment: Success (after Radio Link Failure) | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101069 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0690 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.13 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101070 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0690 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.13 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101070 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0691 | - | F | Rel-8 | 8.4.0 | - | New priority 3 test case: Periodic Location Updating Procedure (PLU Timer handling, non-cell reselection to GERAN) | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101074 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0691 | - | F | Rel-8 | 8.4.0 | 8.5.0 | New priority 3 test case: Periodic Location Updating Procedure (PLU Timer handling, non-cell reselection to GERAN) | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101074 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0692 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Addition of new test case 9.2.3.3.4 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101075 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0692 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Addition of new test case 9.2.3.3.4 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101075 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0693 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.3.4 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101076 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0693 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.3.4 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101076 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0694 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Update of MAC TC 7.1.4.15 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101077 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0694 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Update of MAC TC 7.1.4.15 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101077 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0695 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of MAC Procedures part TC 7.1.2.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101078 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0695 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of MAC Procedures part TC 7.1.2.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101078 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0696 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to MAC test case 7.1.4.10 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101079 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0696 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to MAC test case 7.1.4.10 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101079 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0697 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update to test case 8.2.4.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101081 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0697 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update to test case 8.2.4.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101081 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0698 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.3.1.8 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101082 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0698 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.3.1.8 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101082 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0699 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.3.1.10 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101083 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0699 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.3.1.10 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101083 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0700 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.4 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101084 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0700 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Corrections to E-UTRA MAC test case 7.1.7.1.4 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101084 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0701 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of Acknowledged Mode Procedures part TC 7.2.3.15^^AM RLC / Re-ordering of RLC PDU segments"" | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101085 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0701 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of Acknowledged Mode Procedures part TC 7.2.3.15^^AM RLC / Re-ordering of RLC PDU segments"" | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101085 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0702 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.3.14 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101086 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0702 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.3.14 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101086 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0703 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.3.4 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101087 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0703 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.3.4 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101087 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0704 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.3.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101088 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0704 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.3.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101088 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0705 | 1 | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.3.7 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101089 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0705 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.3.7 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101089 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0706 | 2 | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of RLC test case 7.2.3.18 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101090 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0706 | 2 | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of RLC test case 7.2.3.18 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101090 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0707 | - | F | Rel-8 | 8.4.0 | - | GCF priority 2 - EPS bearer context ID values and RRC messages carrying ESM messages for EPS bearer context (de)activation and modification | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101092 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0707 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 2 - EPS bearer context ID values and RRC messages carrying ESM messages for EPS bearer context (de)activation and modification | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101092 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0708 | - | F | Rel-8 | 8.4.0 | - | GCF priority 3 - Small correction to TC 9.2.1.1.11 Attach / rejected / EPS services and non-EPS services not allowed | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101093 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0708 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 3 - Small correction to TC 9.2.1.1.11 Attach / rejected / EPS services and non-EPS services not allowed | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101093 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0709 | - | F | Rel-8 | 8.4.0 | - | GCF priority 2 - Correction of test case 9.2.1.1.15 for Attach / rejected / roaming not allowed in this tracking area | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101094 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0709 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 2 - Correction of test case 9.2.1.1.15 for Attach / rejected / roaming not allowed in this tracking area | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101094 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0710 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update test case 8.5.1.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101098 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0710 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update test case 8.5.1.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101098 | agreed | 2010-02-23 | LTE-UEConTest_SIG | - | 2010-02-23 |
| 0711 | - | F | Rel-8 | 8.4.0 | - | GCF priority 1 - Update of RRC test case 8.2.1.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101105 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0711 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 1 - Update of RRC test case 8.2.1.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101105 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0712 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Correction to EUTRAN RLC test case 7.2.2.10 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101108 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0712 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Correction to EUTRAN RLC test case 7.2.2.10 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101108 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0713 | - | F | Rel-8 | 8.4.0 | - | GCF priority 2 - Correction of test case 9.2.1.2.4 for Successful combined attach procedure, EPS service only / CS domain not available | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101110 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0713 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 2 - Correction of test case 9.2.1.2.4 for Successful combined attach procedure, EPS service only / CS domain not available | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101110 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0714 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to E-UTRA PDCP test case 7.3.4.1 and 7.3.4.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101113 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0714 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to E-UTRA PDCP test case 7.3.4.1 and 7.3.4.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101113 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0715 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Enhancement test case 8.1.2.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101114 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0715 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Enhancement test case 8.1.2.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101114 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0716 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to EMM test cases to bring the UE to stable state at the end of expected sequence | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101117 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0716 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to EMM test cases to bring the UE to stable state at the end of expected sequence | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101117 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0717 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of Multi-layer Procedures part TC 13.1.1 Activation and deactivation of additional data radio bearer in E-UTRA | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101118 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0717 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of Multi-layer Procedures part TC 13.1.1 Activation and deactivation of additional data radio bearer in E-UTRA | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101118 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0718 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Update of Multi-layer Procedures part TC 13.2.1 RRC Connection Reconfiguration: E-UTRA to E-UTRA | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101119 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0718 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Update of Multi-layer Procedures part TC 13.2.1 RRC Connection Reconfiguration: E-UTRA to E-UTRA | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101119 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0719 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2: Update of MAC TC 7.1.3.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101120 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0719 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2: Update of MAC TC 7.1.3.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101120 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0720 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to EPC test case 9.2.1.1.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101121 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0720 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to EPC test case 9.2.1.1.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101121 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0721 | - | F | Rel-8 | 8.4.0 | - | Priority 2 - section 9 alignment IP handling at wrong place - Missing security activation - Editorial changes | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101122 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0721 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Priority 2 - section 9 alignment IP handling at wrong place - Missing security activation - Editorial changes | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101122 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0722 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.15 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101125 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0722 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.15 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101125 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0723 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.9 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101126 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0723 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.9 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101126 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0724 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction of RRC test case 8.3.3.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101130 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0724 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction of RRC test case 8.3.3.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101130 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0725 | 1 | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to MAC test cases to bring the UE to stable state at the end of expected sequence | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101131 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0725 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to MAC test cases to bring the UE to stable state at the end of expected sequence | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101131 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0726 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to RRC test cases to bring the UE to stable state at the end of expected sequence | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101132 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0726 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to RRC test cases to bring the UE to stable state at the end of expected sequence | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101132 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0727 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 10.7.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101133 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0727 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 10.7.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101133 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0728 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 10.7.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101134 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0728 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 10.7.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101134 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0729 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 10.8.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101135 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0729 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 10.8.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101135 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0730 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 4 - Addition of new RRC test case 8.4.7.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101141 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0730 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 4 - Addition of new RRC test case 8.4.7.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101141 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0731 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 4 - Addition of new RRC test case 8.3.2.10 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101142 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0731 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 4 - Addition of new RRC test case 8.3.2.10 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101142 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0732 | - | F | Rel-8 | 8.4.0 | - | General note for test cases with statistical behaviour | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101145 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0732 | - | F | Rel-8 | 8.4.0 | 8.5.0 | General note for test cases with statistical behaviour | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101145 | agreed | 2010-02-24 | LTE-UEConTest_SIG | - | 2010-02-24 |
| 0733 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 10.7.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101148 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0733 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 10.7.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101148 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0734 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 10.7.4 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101149 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0734 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 10.7.4 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101149 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0735 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 10.8.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101151 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0735 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 10.8.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101151 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0736 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 10.8.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101152 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0736 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 10.8.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101152 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0737 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 10.8.5 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101154 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0737 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 10.8.5 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101154 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0738 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 10.8.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101155 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0738 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 10.8.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101155 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0739 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update to test case 10.8.7 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101156 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0739 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update to test case 10.8.7 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101156 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0740 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3: New PUSCH-Hopping test case 7.1.5.2:Predefined intra-TTI PUSCH hopping (N_sb=1) | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101158 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0740 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3: New PUSCH-Hopping test case 7.1.5.2:Predefined intra-TTI PUSCH hopping (N_sb=1) | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101158 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0741 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3: New PUSCH-Hopping test case 7.1.5.4: Predefined inter-TTI PUSCH hopping (N_sb=1) | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101160 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0741 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3: New PUSCH-Hopping test case 7.1.5.4: Predefined inter-TTI PUSCH hopping (N_sb=1) | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101160 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0742 | 1 | F | Rel-8 | 8.4.0 | - | GCF priority 3 - New test case 8.1.1.6 RRC / BCCH modification in connected mode | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101162 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0742 | 1 | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 3 - New test case 8.1.1.6 RRC / BCCH modification in connected mode | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101162 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0743 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - New TC 8.5.2.1 RRC Connection Reject: redirection from UTRAN to E-UTRAN | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101163 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0743 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - New TC 8.5.2.1 RRC Connection Reject: redirection from UTRAN to E-UTRAN | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101163 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0744 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - addition of new EMM test case 9.2.1.2.14 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101164 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0744 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - addition of new EMM test case 9.2.1.2.14 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101164 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0745 | - | F | Rel-8 | 8.4.0 | - | Update of test case 9.3.1.15 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101165 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0745 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Update of test case 9.3.1.15 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101165 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0746 | - | F | Rel-8 | 8.4.0 | - | Update of test case 9.2.1.1.18 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101166 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0746 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Update of test case 9.2.1.1.18 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101166 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0747 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3: Update to test case 9.2.3.1.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101167 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0747 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3: Update to test case 9.2.3.1.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101167 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0748 | - | F | Rel-8 | 8.4.0 | - | GCF priority 3 - Correction of test case 10.5.3 for UE requested PDN connectivity procedure not accepted | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101168 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0748 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 3 - Correction of test case 10.5.3 for UE requested PDN connectivity procedure not accepted | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101168 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0749 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Addition of new multi-layer test case 13.1.3 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101169 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0749 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Addition of new multi-layer test case 13.1.3 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101169 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0750 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Addition of new test case 13.4.1.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101170 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0750 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Addition of new test case 13.4.1.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101170 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0751 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - Update of Multi-layer Procedures part TC 13.3.1.1 Intra System Connection Reestablishment / Radio Link Recovery while T310 is running | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101171 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0751 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - Update of Multi-layer Procedures part TC 13.3.1.1 Intra System Connection Reestablishment / Radio Link Recovery while T310 is running | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101171 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0752 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 3 - update of test case 13.3.1.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101172 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0752 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 3 - update of test case 13.3.1.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101172 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0753 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 : Correction to MAC test case 7.1.6.1 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101173 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0753 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 : Correction to MAC test case 7.1.6.1 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101173 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0754 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 : Correction to MAC test cases 7.1.6.2 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101174 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0754 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 : Correction to MAC test cases 7.1.6.2 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101174 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0755 | 2 | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.10 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101175 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0755 | 2 | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Correction to E-UTRAN RLC test case 7.2.3.10 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101175 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0756 | - | F | Rel-8 | 8.4.0 | - | Update to GCF Priority 1 layer 2 UM test cases to increase the drx-Inactivity Timer to psf200 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101177 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0756 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Update to GCF Priority 1 layer 2 UM test cases to increase the drx-Inactivity Timer to psf200 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101177 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0757 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1 - Enhancement and update to MAC test case 7.1.4.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101179 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0757 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1 - Enhancement and update to MAC test case 7.1.4.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101179 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0758 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 1: Update of MAC TC 7.1.3.6 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101183 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0758 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 1: Update of MAC TC 7.1.3.6 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101183 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0759 | - | F | Rel-8 | 8.4.0 | - | Update of test case and section titles | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101186 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0759 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Update of test case and section titles | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101186 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0760 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.1.2.7 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101189 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0760 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.1.2.7 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101189 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0761 | - | F | Rel-8 | 8.4.0 | - | GCF Priority 2 - Update to test case 8.1.2.5 | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101190 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0761 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF Priority 2 - Update to test case 8.1.2.5 | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101190 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0762 | - | F | Rel-8 | 8.4.0 | - | Corrections related to UE mode of operation and UE capability for CS fallback and SMS over SGs | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101191 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0762 | - | F | Rel-8 | 8.4.0 | 8.5.0 | Corrections related to UE mode of operation and UE capability for CS fallback and SMS over SGs | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101191 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0763 | - | F | Rel-8 | 8.4.0 | - | GCF priority 3 - Correction of test case 10.6.2 for UE requested PDN disconnect procedure not accepted by the network | RP-47 | RP-100143 | reissued | R5 | R5-46 | R5-101192 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0763 | - | F | Rel-8 | 8.4.0 | 8.5.0 | GCF priority 3 - Correction of test case 10.6.2 for UE requested PDN disconnect procedure not accepted by the network | RP-47 | RP-100316 | approved | R5 | R5-46 | R5-101192 | agreed | 2010-02-25 | LTE-UEConTest_SIG | - | 2010-02-25 |
| 0764 | - | F | Rel-9 | 9.0.0 | 9.1.0 | CR 36.523-1-0764 New Test case 6.2.3.28- Inter-RAT Cell Reselection from GPRS Packet_transfer to E-UTRA Cell (Network Assisted Cell Change) | GP-46 | GP-100625 | approved | G3new | G3new-46 | GP-091808 | agreed | 2010-04-25 | LTE-UEConTest_SIG | - | 2010-04-25 |
| 0765 | - | F | Rel-9 | 9.0.0 | 9.1.0 | CR 36.523-1-0765 New Test Case 6.2.3.30 - Inter-RAT Cell Reselection failure from GPRS Packet transfer to E-UTRA (Network Assisted Cell Change) | GP-46 | GP-100626 | approved | G3new | G3new-46 | GP-091807 | agreed | 2010-04-25 | LTE-UEConTest_SIG | - | 2010-04-25 |
| 0766 | - | F | Rel-9 | 9.0.0 | 9.1.0 | CR 36.523-1-0766 New Test Case 6.2.2.6 - Inter-RAT Cell selection / From GSM_Idle/GPRS Packet_idle to E-UTRA_RRC_IDLE / Serving cell becomes non-suitable (ServingCell<0) | GP-46 | GP-100649 | approved | G3new | G3new-46 | GP-091809 | agreed | 2010-04-25 | LTE-UEConTest_SIG | - | 2010-04-25 |
| 0767 | - | F | Rel-9 | 9.0.0 | 9.1.0 | CR 36.523-1-0767 New Test Case 6.2.2.7 - Inter-RAT Cell selection / From GSM_Idle/GPRS Packet_idle to E-UTRA_RRC_IDLE ,when the serving cell is barred. | GP-46 | GP-100650 | approved | G3new | G3new-46 | GP-091810 | agreed | 2010-04-25 | LTE-UEConTest_SIG | - | 2010-04-25 |
| 0768 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correction of Minimum Cell Configuration | RP-48 | RP-100524 | approved | R5 | R5-47 | R5-103077 | agreed | 2010-04-30 | DSMIPv6_UEConTest | - | 2010-04-30 |
| 0769 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3: New TC 9.3.1.5 Service request / Rejected / Illegal ME | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103086 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0770 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.3 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103087 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0771 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1 - Correction to MAC test case 7.1.4.10 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103088 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0772 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Update of TC 9.1.5.1 EMM Information Procedure | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103089 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0773 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correction to TC 9.1.2.4 Authentication not accepted by the UE / MAC code failure | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103090 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0774 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correction to TC 9.1.2.5 Authentication not accepted by the UE / SQN failure | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103091 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0775 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correction of SIB in RRC TCs 8.4.2.2 and 8.4.2.4 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103093 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0776 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Update to test case 6.1.2.6 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103130 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0777 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1 - Correction to PDSCH power allocation of MAC TBS selection TCs | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103131 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0778 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Correction of test case 6.2.3.13 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103132 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0779 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Addition of new test case 8.3.2.2 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103135 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0780 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Update test case 8.3.2.4 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103136 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0781 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Addition of new test case 8.3.2.5 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103137 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0782 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Correction for test case 13.4.1.2 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103139 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0783 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Addition of new test case 13.4.2.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103140 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0784 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Update test case 6.1.2.11 & 6.1.2.15 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103141 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0785 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 Addition of new test case 14.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103144 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0786 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 Addition of new test case 14.2 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103145 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0787 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4: New MAC TBS test case 7.1.7.1.6:DCI format 2A / RA type 1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103157 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0788 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4: New MAC TBS test case 7.1.7.1.5:DCI format 2A / RA type 0 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103158 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0789 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4: Correction to E-UTRA DRB test case 12.3.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103159 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0790 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4: Correction to E-UTRA DRB test case 12.3.2 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103160 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0791 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4: Correction to E-UTRA DRB test case 12.3.3 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103161 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0792 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4: Correction to E-UTRA DRB test case 12.3.4 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103162 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0793 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4: Correction to generic test procedure 12.1.2 for E-UTRA DRB MIMO test cases | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103163 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0794 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4: New PUSCH-Hopping test case 7.1.5.1: Inter-TTI PUSCH hopping by uplink grant | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103228 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0795 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4: New PUSCH-Hopping test case 7.1.5.3: Predefined intra-TTI PUSCH hopping (N_sb=2/3/4) | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103230 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0796 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4: New PUSCH-Hopping test case 7.1.5.5: Predefined inter-TTI PUSCH hopping (N_sb=2/3/4) | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103231 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0797 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Update to test case 8.1.2.7 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103240 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0798 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Update to test case 9.2.3.1.23 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103241 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0799 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1 - Clarification of the cells where the messages are observed in EMM test cases | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103242 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0800 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Update to test case 10.7.5 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103243 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0801 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Update to test case 10.8.4 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103244 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0803 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Update of RRC part TC 8.5.1.2 Radio link failure / T301 expiry | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103271 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0804 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Addition of new EPS mobility management procedure test case 9.3.2.2a CS SERVICE NOTIFICATION / Connected mode | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103272 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0805 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Update Multi-layer test cases 13.3.1.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103273 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0806 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correct the Test Purpose 2 of PDCP part TC 7.3.1.2 and 7.3.1.3 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103276 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0807 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1 - Correct PDCP part TC 7.3.1.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103277 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0808 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Addition of new EPS mobility management procedure test case 9.2.3.2.7 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103278 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0809 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1: Correction to test case 7.1.3.9 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103302 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0810 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1: Correction to E-UTRA MAC test case 7.1.2.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103303 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0811 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1: Correction to EMM test case 9.2.3.1.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103304 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0812 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1: Correction to EMM test case 9.2.1.1.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103307 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0813 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1: Correction to EMM test case 9.2.2.2.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103308 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0814 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1: Correction to EUTRA MAC test cases 7.1.7.1 test cases | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103313 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0815 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Correction to EUTRA PDCP test case 7.3.6.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103321 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0816 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Correction to EUTRA RRC test case 8.5.1.5 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103323 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0817 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Correction to EPC test case 9.2.2.1.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103327 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0818 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Adding UE pre-conditions for UE to be configured for combined EPS/IMSI attach in 9.2.3.2.x combined TAU test cases | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103341 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0819 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correction to generic test procedure reference in Idle mode section | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103364 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0820 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correction to TC 8.1.3.7 RRC connection release / Redirection from UTRAN to E-UTRAN | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103365 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0821 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Correction to TC 8.5.2.1 RRC Connection Reject / Redirection from UTRAN to E-UTRAN | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103367 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0822 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - New TC 9.3.1.18 Service Reject CSG not authorized | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103394 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0823 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Addition of new test case 8.4.3.2 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103413 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0824 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Addition of new test case 8.4.3.3 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103414 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0825 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Priority 4 - Addition of test case 9.2.3.2.17 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103416 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0826 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Priority 4 - Addition of new test case 9.2.3.2.4 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103418 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0827 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Priority 4 - Addition of new test case 9.2.3.2.14 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103419 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0828 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Priority 4 - Addition of new test case 9.2.3.2.8 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103420 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0829 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Priority 3 - update of test case 9.2.2.2.14 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103421 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0830 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - New TC 9.2.3.3.2 Iu mode to S1 mode intersystem change / ISR is active / Expiry of T3312 in E-UTRAN or T3412 in UTRAN and further intersystem change | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103456 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0831 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - New test case 6.1.2.10 Cell reselection in shared network environment | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103457 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0832 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - New Test case 6.1.2.12 Cell reselection / Cell-specific reselection parameters provided by the network in a neighbouring cell list | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103458 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0833 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - addition of new test case 6.1.1.4: PLMN selection in shared network environment / Automatic mode | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103459 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0834 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Addition of new EMM test case 9.2.2.1.7 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103463 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0835 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Addition of new EMM test case 9.2.2.1.8 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103464 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0836 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Addition of new EMM test case 9.2.2.1.9 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103465 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0837 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 Correction to test case 6.1.2.3, 6.2.3.1 & 6.2.3.6 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103486 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0838 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 to 3 - Correction to RRC part 3 test cases | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103498 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0839 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Update of RRC test case 8.2.4.5 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103513 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0840 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - New EMM test case 9.2.2.1.3 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103514 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0841 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Addition of new DSMIPv6 test case for Discovery of the Home Agent address via DHCPv6 | RP-48 | RP-100524 | approved | R5 | R5-47 | R5-103573 | agreed | 2010-04-30 | DSMIPv6_UEConTest | - | 2010-04-30 |
| 0842 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Addition of new DSMIPv6 test case for Security association establishment with Home Agent reallocation procedure | RP-48 | RP-100524 | approved | R5 | R5-47 | R5-103579 | agreed | 2010-04-30 | DSMIPv6_UEConTest | - | 2010-04-30 |
| 0843 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Corrections to C2K TCs 8.3.2.7, 8.3.2.8 and 8.3.2.9 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103646 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0844 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Addition of new DSMIPv6 test case for Discovery of the Home Agent address via IKEv2 during tunnel setup to ePDG | RP-48 | RP-100524 | approved | R5 | R5-47 | R5-103649 | agreed | 2010-04-30 | DSMIPv6_UEConTest | - | 2010-04-30 |
| 0845 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Addition of test case 8.2.4.10 RRC Connection Reconfiguration / Handover (between FDD and TDD) | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103676 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0846 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1 - Correction to MAC, RRC and EMM test cases to bring the UE to stable state at the end of test | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103696 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0847 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1: Correction to EUTRA MAC test case 7.1.4.8 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103697 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0848 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1: Correction to test case 7.1.4.11 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103698 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0849 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1 - Update of RRC test cases 8.2.2.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103802 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0850 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1: Correction to EUTRA RLC test case 7.2.3.10 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103803 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0851 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF priority 2 - Correction to test case 6.1.1.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103804 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0852 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Correction to EUTRA RLC test case 7.2.2.8 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103805 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0853 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Correction to EUTRA RLC test case 7.2.2.10 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103806 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0854 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Correction to EUTRA RLC test case 7.2.3.13 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103807 | agreed | 2010-04-30 | LTE-UEConTest_SIG | - | 2010-04-30 |
| 0855 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Update to test case 8.1.2.5 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103808 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0856 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Correction to EPC test case 9.1.3.2 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103809 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0857 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Adding UE pre-conditions for UE to be configured for EPS attach in 9.2.1.1.x EPS attach test cases | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103810 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0858 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Adding UE pre-conditions for UE to be configured for EPS attach in 9.2.3.1.x TAU test cases | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103811 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0859 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Adding UE pre-conditions for UE to be configured for EPS attach in 9.2.2.x detach test cases | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103814 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0860 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Adding UE pre-conditions for UE to be configured for combined EPS/IMSI attach in 9.2.1.2.x combined attach test cases | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103815 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0861 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correction to EPS test case 9.4.1 | RP-48 | RP-100529 | approved | R5 | R5-47 | R5-103818 | agreed | 2010-05-01 | IMS_EMER_LTE_UEConTest | - | 2010-05-01 |
| 0862 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correction to 'SMS over SGs' test case 11.1.1 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103820 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0863 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correction to 'SMS over SGs' test case 11.1.2 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103821 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0864 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correction to 'SMS over SGs' test case 11.1.3 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103822 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0865 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Update test case 8.3.3.3 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103828 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0866 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3: New EMM test case, 9.2.1.1.23: Attach / Abnormal case / Repeated rejects for network failures | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103830 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0867 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3: New TC 9.3.1.6 Service request / Rejected / EPS services not allowed | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103831 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0868 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Priority 3 - update of test case 9.2.1.1.24 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103832 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0869 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Addition of new test case 13.1.5 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103836 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0870 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Update of Multilayer Procedures part TC 13.1.3 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103838 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0871 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Addition of new test case 8.2.1.5 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103840 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0872 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Addition of new test case 8.2.1.6 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103841 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0873 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - New TC 9.2.1.1.4 Attach Procedure Success Request for obtaining the IPv4 address of the home agent | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103842 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0874 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Priority 4 - Addition of new test case 9.2.3.2.16 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103843 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0875 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Update RRC test case 8.2.4.6 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103848 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0876 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Addition of UE end state for 15 EMM test cases and termination of ongoing signalling procedure for 3 EMM test cases | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103849 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0877 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1 - Correction to MAC test case 7.1.4.5 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103872 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0878 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Addition of Multi-layer Procedures part test case 13.1.7 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103873 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0879 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Addition of new test case 9.2.3.2.2 for combined tracking area update / successful for EPS services only / IMSI unknown in HSS | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103876 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0880 | 1 | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1: Correction to EUTRA RLC test case 7.2.3.6 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103800 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0881 | 1 | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 1: Correction to EUTRA RLC test case 7.2.3.7 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103801 | agreed | 2010-05-01 | LTE-UEConTest_SIG | - | 2010-05-01 |
| 0882 | 1 | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2: Correction to EMM test case 9.2.3.1.2 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103817 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0883 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Update of General tests part TC 11.1.4 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103819 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0884 | 1 | F | Rel-9 | 9.0.0 | 9.1.0 | GCF priority 3 - Inter-RAT PLMN Selection/ Selection of correct PLMN and RAT in shared network environment, Automatic mode | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103824 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0885 | 1 | F | Rel-9 | 9.0.0 | 9.1.0 | GCF priority 4 - New test case 6.2.1.4 Inter-RAT PLMN Selection/ Selection of correct RAT from the OPLMN list/ Manual mode | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103825 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0886 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF priority 3 - New test case 6.2.1.1 Inter-RAT PLMN Selection /Selection of correct RAT for OPLMN/Automatic mode | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103826 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0887 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Update test case 8.2.4.8, 8.5.1.2 and 8.5.1.4 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103827 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0888 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Update RRC test case 8.3.1.4 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103829 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0889 | 1 | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 2 - Correction of EMM test case 9.1.2.3 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103833 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0890 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 3 - Update of Multilayer Procedures part TC 13.3.1.2 | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103837 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0891 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - Update of RRC part TC 8.1.1.3 RRC / Paging for connection in idle mode /Multiple paging records | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103839 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0892 | 1 | F | Rel-9 | 9.0.0 | 9.1.0 | GCF Priority 4 - New TC 13.1.8 Connected CSFB to GSM with Redirection MO call | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103844 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0893 | - | B | Rel-8 | 8.5.0 | 8.6.0 | Removal of technical content in 36.523-1 v8.5.0 and substitution with pointer to the next Release | RP-48 | RP-100511 | approved | R5 | R5-47 | R5-103229o | agreed | 2010-04-30 | TEI8_Test | - | 2010-04-30 |
| 0894 | - | F | Rel-9 | 9.0.0 | 9.1.0 | GCF priority 3 - New test case 6.2.1.2 Inter-RAT PLMN Selection /Selection of correct RAT for UPLMN/Automatic mode | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103823 | agreed | 2010-05-02 | LTE-UEConTest_SIG | - | 2010-05-02 |
| 0895 | - | F | Rel-9 | 9.0.0 | 9.1.0 | Correction to MAC and RLC handover test cases to set IE ""statusReportRequired"" to FALSE | RP-48 | RP-100510 | approved | R5 | R5-47 | R5-103816 | agreed | 2010-04-30 | LTE-UEConTest_SIG | This record corrected from previous erroneous entry of 36.521-3 CR0200. | 2010-04-30 |
| 0896 | - | B | Rel-9 | 9.1.1 | - | CR 36.523-1-0896 6.2.3.19 : Redirection to E-UTRA upon the release of the CS connection | - | - | - | G3new | G3new-47 | GP-101175 | revised | 2010-08-24 | LTE-UEConTest_SIG | - | 2010-08-24 |
| 0896 | 1 | B | Rel-9 | 9.1.1 | 9.2.0 | CR 36.523-1-0896 6.2.3.19 : Redirection to E-UTRA upon the release of the CS connection | GP-47 | GP-101510 | approved | G3new | G3new-47 | GP-101510 | agreed | 2010-09-02 | LTE-UEConTest_SIG | - | 2010-09-02 |
| 0897 | - | B | Rel-9 | 9.1.1 | - | CR 36.523-1-0897 6.2.3.20: Redirection to E-UTRA upon the release of the CS connection and no suitable cell available | - | - | - | G3new | G3new-47 | GP-101177 | revised | 2010-08-24 | LTE-UEConTest_SIG | - | 2010-08-24 |
| 0897 | 1 | B | Rel-9 | 9.1.1 | 9.2.0 | CR 36.523-1-0897 6.2.3.20: Redirection to E-UTRA upon the release of the CS connection and no suitable cell available | GP-47 | GP-101521 | approved | G3new | G3new-47 | GP-101521 | agreed | 2010-09-02 | LTE-UEConTest_SIG | - | 2010-09-02 |
| 0898 | - | B | Rel-9 | 9.1.1 | - | CR 36.523-1-0898 New test case 6.2.3.14 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are higher than the serving cell) | - | - | - | G3new | G3new-47 | GP-101184 | revised | 2010-08-24 | LTE-UEConTest_SIG | - | 2010-08-24 |
| 0898 | 1 | B | Rel-9 | 9.1.1 | 9.2.0 | CR 36.523-1-0898 New test case 6.2.3.14 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are higher than the serving cell) | GP-47 | GP-101502 | approved | G3new | G3new-47 | GP-101502 | agreed | 2010-09-01 | LTE-UEConTest_SIG | - | 2010-09-01 |
| 0899 | - | B | Rel-9 | 9.1.1 | - | CR 36.523-1-0899 New test case 6.2.3.15 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are lower than the serving cell) | - | - | - | G3new | G3new-47 | GP-101185 | revised | 2010-08-31 | LTE-UEConTest_SIG | - | 2010-08-31 |
| 0899 | 1 | B | Rel-9 | 9.1.1 | 9.2.0 | CR 36.523-1-0899 New test case 6.2.3.15 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are lower than the serving cell) | GP-47 | GP-101503 | approved | G3new | G3new-47 | GP-101503 | agreed | 2010-09-01 | LTE-UEConTest_SIG | - | 2010-09-01 |
| 0900 | - | B | Rel-9 | 9.1.1 | - | CR 36.523-1-0900 Correction related to GERAN priority, in existing Inter-RAT cell reselection TC between GERAN and E-UTRA | - | - | - | G3new | G3new-47 | GP-101207 | withdrawn | 2010-08-24 | LTE-UEConTest_SIG | - | 2010-08-24 |
| 0901 | - | F | Rel-9 | 9.1.1 | - | CR 36.523-1-0901 New Test Case 6.2.3.29 - Inter-RAT cell reselection from GPRS packet_transfer NC1 mode to E-UTRA / Network assisted cell change. | - | - | - | G3new | G3new-47 | GP-101210 | revised | 2010-08-31 | LTE-UEConTest_SIG | - | 2010-08-31 |
| 0901 | 1 | F | Rel-9 | 9.1.1 | - | CR 36.523-1-0901 New Test Case 6.2.3.29 - Inter-RAT cell reselection from GPRS packet_transfer NC1 mode to E-UTRA / Network assisted cell change. | - | - | - | G3new | G3new-47 | GP-101561 | withdrawn | - | LTE-UEConTest_SIG | - | 2010-09-06 |
| 0902 | - | F | Rel-9 | 9.1.1 | - | CR 36.523-1-0902 New Test case 6.2.3.27- Inter-RAT Cell selection from GPRS Packet_transfer to E-UTRA Cell (NC2 mode). | - | - | - | G3new | G3new-47 | GP-101211 | revised | 2010-08-31 | LTE-UEConTest_SIG | - | 2010-08-31 |
| 0902 | 1 | F | Rel-9 | 9.1.1 | 9.2.0 | CR 36.523-1-0902 New Test case 6.2.3.27- Inter-RAT Cell selection from GPRS Packet_transfer to E-UTRA Cell (NC2 mode). | GP-47 | GP-101562 | approved | G3new | G3new-47 | GP-101562 | agreed | 2010-09-01 | LTE-UEConTest_SIG | - | 2010-09-01 |
| 0903 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Corrections to EUTRA idle mode test cases | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104073 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0904 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Review of detach at switch/power off procedure in EMM test cases | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104083 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0905 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Review of switch/power off procedure | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104084 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0906 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to remove special configurations for UM Bearer test cases | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104107 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0907 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to EUTRA RRC test case 8.1.2.7 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104130 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0908 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to Generic E-UTRA radio bearer test procedure 12.1.1 and 12.1.2 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104136 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0909 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to EMM test case 9.2.3.1.2 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104142 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0910 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to MAC test case 7.1.2.8 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104144 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0911 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to EUTRA RRC test case 8.1.2.5 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104145 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0912 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to EUTRA MAC test case 7.1.4.3 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104147 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0913 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104148 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0914 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.2.6 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104149 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0915 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104150 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0917 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.6 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104157 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0918 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.11 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104162 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0919 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction of ESM test case 10.8.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104168 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0920 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Addition of new test case 6.1.2.14 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104173 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0921 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Addition of new test case 9.2.3.2.5 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104178 | agreed | 2010-09-01 | LTE-UEConTest_SIG | - | 2010-09-01 |
| 0922 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - Update to test case 13.1.5 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104182 | agreed | 2010-08-23 | LTE-UEConTest_SIG | - | 2010-08-23 |
| 0923 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction of EMM test case 9.2.1.1.17 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104238 | agreed | 2010-08-24 | LTE-UEConTest_SIG | - | 2010-08-24 |
| 0924 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Update of TC 8.1.2.5 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104265 | agreed | 2010-09-01 | LTE-UEConTest_SIG | - | 2010-09-01 |
| 0925 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 Update test case 8.3.2.5 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104283 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0926 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Correction of test cases 14.1 & 14.2 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104286 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0927 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Addition of new test case 14.3 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104287 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0928 | - | F | Rel-9 | 9.1.1 | 9.2.0 | Update of DSMIPv6 test cases | RP-49 | RP-100831 | approved | R5 | R5-48 | R5-104389 | agreed | 2010-08-16 | DSMIPv6_UEConTest | - | 2010-08-16 |
| 0929 | - | F | Rel-9 | 9.1.1 | 9.2.0 | Removal of DSMIPv6 test case 15.3 | RP-49 | RP-100831 | approved | R5 | R5-48 | R5-104390 | agreed | 2010-08-16 | DSMIPv6_UEConTest | - | 2010-08-16 |
| 0930 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - update of test case 7.2.3.4 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104399 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0931 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Update to EMM test case 9.2.2.1.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104512 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0932 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Update of TC 7.1.4.16 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104535 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0933 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction of RRC test case 8.5.4.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104632 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0934 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 4 - Addition of new test case 8.2.4.12 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104637 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0935 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to EUTRA MAC test cases 7.1.7.1.1, 7.1.7.1.2, 7.1.7.1.3, 7.1.7.1.4 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104708 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0936 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.7.2.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104709 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0937 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.4 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104710 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0938 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.9 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104711 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0939 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to GCF WI-081 LTE Testcases 7.1.4.11, 7.1.4.14 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104712 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0940 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to ETURA RRC test case 8.2.4.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104713 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0941 | - | F | Rel-9 | 9.1.1 | 9.2.0 | Correction to GCF WI-082 EMM Testcase 9.1.2.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104714 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0942 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Corrections to EUTRA GERAN idle mode test cases | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104715 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0943 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Corrections to idle mode test case 6.2.2.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104716 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0944 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Review of detach at switch/power off procedure in Idle Mode test cases | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104717 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0945 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to Inter RAT HRPD test case 6.2.2.3 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104718 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0946 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to Inter RAT HRPD test case 6.2.3.7 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104719 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0947 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to Inter RAT HRPD test case 6.2.3.8 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104720 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0948 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Addition of new test case 6.2.3.4 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104721 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0949 | - | F | Rel-9 | 9.1.1 | 9.2.0 | Addition of modified value tag after System Information modification | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104722 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0950 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to EUTRA RLC test case 7.2.3.21 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104723 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0951 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to GCF Priority 2 Inter RAT HRPD test case 8.1.3.9 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104724 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0952 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to TC 8.1.3.5 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104725 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0953 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction of EMM test case 9.2.1.1.9 and 9.2.1.1.10 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104728 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0954 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction of EMM test case 9.2.1.1.20 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104729 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0955 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - update of test case 9.2.3.1.8 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104730 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0956 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction of EMM test case 9.2.1.2.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104731 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0957 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Correction of test case 9.2.1.1.1a about reference cell information | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104732 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0958 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction of ESM test case 10.6.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104733 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0959 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to ESM test case 10.5.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104734 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0960 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to ESM test case 10.4.1 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104735 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0961 | - | F | Rel-9 | 9.1.1 | 9.2.0 | Add test case for RRC connection establishment of emergency call | RP-49 | RP-100834 | approved | R5 | R5-48 | R5-104736 | agreed | 2010-08-13 | IMS_EMER_LTE_UEConTest | - | 2010-08-13 |
| 0962 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3: Correction to test case 7.1.5.2 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104742 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0963 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - Correction to test case 7.1.5.4 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104743 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0964 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 3: Correction to MAC TBS (MIMO configured) test case 7.1.7.1.5 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104744 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0965 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 3: Correction to MAC TBS (MIMO configured) test case 7.1.7.1.6 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104745 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0966 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - Addition of new EPS mobility management procedure test case 9.3.2.2a Paging for CS fallback / Connected mode | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104746 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0967 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - update of test case 9.2.1.1.12 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104747 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0968 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - update of test case 9.3.1.15 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104748 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0969 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - update of test case 9.2.3.1.23 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104749 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0970 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - Correction of ESM test case 10.5.3 | RP-49 | RP-100817 | approved | R5 | R5-48 | R5-104750 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0971 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GFC Prirotity 3 and 4: Correction of generic test procedure used in MIMO DRB test cases | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104751 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0972 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - Addition of new Multilayer Procedures test case 13.1.4 Call setup from E-UTRAN RRC_IDLE / CS fallback to UTRAN with Handover / MT call | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104752 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0973 | - | F | Rel-9 | 9.1.1 | 9.2.0 | Addition of new LTE test case 13.1.2 CS fallback UTRAN with redirection / MO call | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104753 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0974 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - Addition of New TC for cell reselection when 1xRTT is higher priority | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104754 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0975 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - Addition of New TC for cell reselection when 1xRTT is lower priority | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104755 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0976 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Addition of new test case 6.1.1.6 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104756 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0977 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4: Correction to test case 7.1.5.1 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104757 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0978 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4: Correction to test case 7.1.5.3 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104758 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0979 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Correction to test case 7.1.5.5 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104759 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0980 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Addition of new test case 8.1.2.6 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104760 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0981 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Update of TC 8.2.1.5 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104761 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0982 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Update of TC 8.2.1.6 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104762 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0983 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Correction to TC 8.2.4.8 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104763 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0984 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Update of TC 8.3.1.6 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104764 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0985 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to EUTRA RRC Test Case 8.2.4.7 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104765 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0986 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Addition of new EMM test case 9.2.1.1.3 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104768 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 0987 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Addition of new test case 9.2.3.2.11 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104769 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0988 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Update to test case 9.2.3.2.15 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104770 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0989 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Addition of new test case 9.3.1.12a | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104771 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0990 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority X: Addition of New TC for Inter-RAT Cell reselection from E-UTRA idle non-CSG cell to a UTRA CSG cell | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104773 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0991 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority X: Addition of New TC for Inter-RAT CSG Cell Reselection from E-UTRA CSG cell to UTRA CSG cell | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104774 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0992 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority X: Introduction of new ESM test case 10.9.1 for UE routing of uplinks packets | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104776 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0993 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 6.1.2.3 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104777 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0994 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 1 - Cell detection timing related correction to test case 6.1.2.4 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104778 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0995 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 6.1.2.5 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104779 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0996 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 6.1.2.11 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104780 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0997 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 1 - Cell detection timing related correction to test case 6.1.2.15 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104781 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0998 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 6.2.2.1 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104782 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 0999 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 6.2.2.2 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104783 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1000 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 6.2.3.1 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104784 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1001 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 6.2.3.2 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104785 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1002 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 6.2.3.3 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104786 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1003 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 6.2.3.5 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104787 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1004 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 8.1.2.5 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104788 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1005 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 8.4.2.2 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104789 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1006 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF priority 2 - Cell detection timing related correction to test case 8.4.2.4 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104790 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1007 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to test case 6.1.2.2 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104791 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1008 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to EUTRA Idle mode test case 6.1.2.6 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104792 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1009 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.1.2.2 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104793 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1010 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to EUTRA PDCP test cases 7.3.5.2, 7.3.5.3, 7.3.5.4, 7.3.5.5 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104794 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1011 | - | F | Rel-9 | 9.1.1 | 9.2.0 | Correction to Generic E-UTRA radio bearer test procedure | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104795 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1012 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Update test cases in clause 8.5.1 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104797 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1013 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Update of MAC test case 7.1.4.3 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-104798 | agreed | 2010-08-27 | LTE-UEConTest_SIG | - | 2010-08-27 |
| 1014 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - New TC 6.3.3 Inter-RAT cell reselection / From UTRA_Idle to E-UTRA RRC_IDLE CSG cell | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105000 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1015 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to GCF Priority 1 MAC test cases for AP#47.05 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105001 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1016 | - | F | Rel-9 | 9.2.1 | - | CR 36.523-1-1016 New Test Case 6.2.3.24 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE ORDER) | - | - | - | G3new | G3new-48 | GP-101674 | revised | 2010-10-26 | LTE-UEConTest_SIG | - | 2010-10-26 |
| 1016 | - | F | Rel-9 | 9.1.1 | 9.2.0 | CR 36.523-1-1016 New Test Case 6.2.3.23 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE CONTINUE) | GP-47 | GP-101603 | approved | G3new | G3new-47 | GP-101603 | agreed | 2010-09-02 | LTE-UEConTest_SIG | - | 2010-09-02 |
| 1016 | 1 | F | Rel-9 | 9.2.1 | - | CR 36.523-1-1016 New Test Case 6.2.3.24 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE ORDER) | - | - | - | G3new | G3new-48 | GP-101726 | revised | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1016 | 2 | F | Rel-9 | 9.2.1 | 9.3.0 | CR 36.523-1-1016 New Test Case 6.2.3.24 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE ORDER) | GP-48 | GP-101734 | approved | G3new | G3new-48 | GP-101734 | agreed | 2010-11-09 | LTE-UEConTest_SIG | - | 2010-11-09 |
| 1017 | - | F | Rel-9 | 9.2.1 | - | CR 36.523-1-1017 New Test Case 6.2.3.26 - Inter-RAT Autonomous Cell Reselection GPRS Packet_transfer to E-UTRA (NC1 mode) | - | - | - | G3new | G3new-48 | GP-101675 | revised | 2010-10-26 | LTE-UEConTest_SIG | - | 2010-10-26 |
| 1017 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction of new test cases in 8.3.3 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105002 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 1017 | 1 | F | Rel-9 | 9.2.1 | - | CR 36.523-1-1017 New Test Case 6.2.3.26 - Inter-RAT Autonomous Cell Reselection GPRS Packet_transfer to E-UTRA (NC1 mode) | - | - | - | G3new | G3new-48 | GP-101727 | revised | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1017 | 2 | F | Rel-9 | 9.2.1 | 9.3.0 | CR 36.523-1-1017 New Test Case 6.2.3.26 - Inter-RAT Autonomous Cell Reselection GPRS Packet_transfer to E-UTRA (NC1 mode) | GP-48 | GP-101735 | approved | G3new | G3new-48 | GP-101735 | agreed | 2010-11-09 | LTE-UEConTest_SIG | - | 2010-11-09 |
| 1018 | - | F | Rel-9 | 9.2.1 | - | CR 36.523-1-1018 Allow test cases 6.2.3.21 and 6.2.3.22 to be implemented in the TTCN | - | - | - | G3new | G3new-48 | GP-101701 | revised | 2010-10-26 | LTE-UEConTest_SIG | - | 2010-10-26 |
| 1018 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Update to test case 8.1.2.9 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105004 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 1018 | 1 | F | Rel-9 | 9.2.1 | 9.3.0 | CR 36.523-1-1018 Allow test cases 6.2.3.21 and 6.2.3.22 to be implemented in the TTCN | GP-48 | GP-101745 | approved | G3new | G3new-48 | GP-101745 | agreed | 2010-11-11 | LTE-UEConTest_SIG | - | 2010-11-11 |
| 1019 | - | F | Rel-9 | 9.2.1 | - | CR 36.523-1-1019 New Test Case 6.2.1.6 - Inter-RAT Background HPLMN Search/Search for correct RAT for HPLMN/Automatic Mode. | - | - | - | G3new | G3new-48 | GP-101703 | revised | 2010-10-26 | LTE-UEConTest_SIG | - | 2010-10-26 |
| 1019 | - | F | Rel-9 | 9.1.1 | 9.2.0 | 36523-1: Update of attach procedure specification | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105005 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 1019 | 1 | F | Rel-9 | 9.2.1 | 9.3.0 | CR 36.523-1-1019 New Test Case 6.2.1.6 - Inter-RAT Background HPLMN Search/Search for correct RAT for HPLMN/Automatic Mode. | GP-48 | GP-101732 | approved | G3new | G3new-48 | GP-101732 | agreed | 2010-11-09 | LTE-UEConTest_SIG | - | 2010-11-09 |
| 1020 | - | B | Rel-9 | 9.2.1 | - | CR 36.523-1-1020 Correction to GERAN-EUTRAN Inter-RAT cell reselection testcases 6.2.3.19,6.2.3.20,6.2.3.21 and 6.2.3.22 | - | - | - | G3new | G3new-48 | GP-101709 | withdrawn | 2010-10-27 | LTE-UEConTest_SIG | - | 2010-10-27 |
| 1020 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 4 - Update of TC 8.1.2.8 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105006 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 1021 | - | F | Rel-9 | 9.2.1 | - | CR 36.523-1-1021 New test case 6.2.3.16 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (Priority of E-UTRA cells is lower than the serving cell) | - | - | - | G3new | G3new-48 | GP-101715 | withdrawn | 2010-10-27 | LTE-UEConTest_SIG | - | 2010-10-27 |
| 1021 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction of EUTRA MAC test case 7.1.4.5 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105007 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 1022 | - | F | Rel-9 | 9.2.1 | - | CR 36.523-1-1022 New test case 6.2.3.17 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority E-UTRA cells) | - | - | - | G3new | G3new-48 | GP-101716 | revised | 2010-10-27 | LTE-UEConTest_SIG | - | 2010-10-27 |
| 1022 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction of EUTRA test case 8.5.1.3 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105009 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 1022 | 1 | F | Rel-9 | 9.2.1 | - | CR 36.523-1-1022 New test case 6.2.3.17 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority E-UTRA cells) | - | - | - | G3new | G3new-48 | GP-101737 | withdrawn | 2010-11-10 | LTE-UEConTest_SIG | - | 2010-11-10 |
| 1023 | - | F | Rel-9 | 9.2.1 | - | CR 36.523-1-1023 Modifications to test cas 6.2.2.6 and 6.2.2.7 | - | - | - | G3new | G3new-48 | GP-101718 | revised | 2010-10-27 | LTE-UEConTest_SIG | - | 2010-10-27 |
| 1023 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to ETURA RRC test case 8.5.1.1 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105010 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 1023 | 1 | F | Rel-9 | 9.2.1 | 9.3.0 | CR 36.523-1-1023 Modifications to test cas 6.2.2.6 and 6.2.2.7 | GP-48 | GP-101729 | approved | G3new | G3new-48 | GP-101729 | agreed | 2010-11-09 | LTE-UEConTest_SIG | - | 2010-11-09 |
| 1024 | - | F | Rel-9 | 9.2.1 | - | CR 36.523-1-1024 Correction to GERAN-EUTRAN Inter-RAT testcases 6.2.3.19,6.2.3.21 and 6.2.3.22 | - | - | - | G3new | G3new-48 | GP-101725 | revised | 2010-11-04 | LTE-UEConTest_SIG | - | 2010-11-04 |
| 1024 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction of EUTRA test case 8.3.1.3 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105011 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 1024 | 1 | F | Rel-9 | 9.2.1 | 9.3.0 | CR 36.523-1-1024 Correction to GERAN-EUTRAN Inter-RAT testcases 6.2.3.19,6.2.3.21 and 6.2.3.22 | GP-48 | GP-101744 | approved | G3new | G3new-48 | GP-101744 | agreed | 2010-11-10 | LTE-UEConTest_SIG | - | 2010-11-10 |
| 1025 | - | F | Rel-9 | 9.2.1 | 9.3.0 | CR 36.523-1-1025 New test case 6.2.3.16 Inter-RAT Cell Reselection / from GSM_Idle to E-UTRAN /based on H_PRIO criteria | GP-48 | GP-101728 | approved | G3new | G3new-48 | GP-101728 | agreed | 2010-11-09 | LTE-UEConTest_SIG | - | 2010-11-09 |
| 1025 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - Correction to ESM test case 10.7.2 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105012 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1026 | - | F | Rel-9 | 9.1.1 | 9.2.0 | Harmonising EMM test case pre-test conditions specification | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105070 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1027 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 3 - update of test case 9.2.3.2.9 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105014 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1028 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 2 - update of test case 9.2.3.1.2 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105015 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1029 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1+2: Correction to RLC test cases for AP#47.05 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105016 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1030 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority x - Correction to 36.523-1 Test Case 8.3.1.5 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105071 | agreed | 2010-08-13 | LTE-UEConTest_SIG | - | 2010-08-13 |
| 1031 | - | F | Rel-9 | 9.1.1 | 9.2.0 | GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.18 | RP-49 | RP-100818 | approved | R5 | R5-48 | R5-105054 | agreed | 2010-08-16 | LTE-UEConTest_SIG | - | 2010-08-16 |
| 1032 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.13 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106114 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1033 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Correction to TC 7.2.3.2 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106156 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1034 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Correction to TC 9.2.3.1.5 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106160 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1035 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to TC 7.3.5.4 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106164 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1036 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction of test cases in 6.2.3.4 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106177 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1037 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction of test cases in 8.3.2.1, 8.3.2.3, 8.3.2.5 and 8.3.2.6 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106182 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1038 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Correction of test cases in 8.3.3 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106183 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1039 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Corrections to test case 9.2.1.2.2 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106186 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1040 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Corrections to test case 9.2.2.1.7 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106187 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1041 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Corrections to test case 9.2.2.2.1 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106188 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1042 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - Corrections to test case 9.2.3.2.2. | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106189 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1043 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - Corrections to test case 9.3.1.17 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106190 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1044 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Corrections to test case 7.1.4.1 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106204 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1045 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EMM test cases 9.2.1.1.13, 9.2.1.1.15 and 9.2.1.1.17 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106214 | agreed | 2010-11-09 | LTE-UEConTest_SIG | - | 2010-11-09 |
| 1046 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EMM test case 9.2.1.1.7 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106216 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1047 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EMM test case 9.2.1.2.1 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106226 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1048 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EMM test case 9.2.1.2.4 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106227 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1049 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EMM test case 9.2.3.1.4 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106229 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1050 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - Editorial correction to test case 6.1.1.6 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106268 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1051 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Update to test case 6.2.2.5 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106269 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1052 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - Update to test case 8.1.2.6 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106274 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1053 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - Update to test case 8.1.2.8 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106275 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1054 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - Update to test case 8.1.2.9 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106276 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1055 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Update to test case 8.1.3.5 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106277 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1056 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Update to test case 9.2.1.2.15 and 9.3.1.12a | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106280 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1057 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Update to test cases 10.8.2, 10.8.4 and 10.8.6 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106284 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1058 | - | F | Rel-9 | 9.2.1 | 9.3.0 | CR to 36.523-1: Correction to UTRA cell minimum power level | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106294 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1059 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Corrections to ESM test case 10.6.2 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106326 | agreed | 2010-11-09 | LTE-UEConTest_SIG | - | 2010-11-09 |
| 1060 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Corrections to RRC test case 8.2.4.6 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106333 | agreed | 2010-11-09 | LTE-UEConTest_SIG | - | 2010-11-09 |
| 1061 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1-4 - Editorial corrections to EUTRA RRC test cases | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106335 | agreed | 2010-11-09 | LTE-UEConTest_SIG | - | 2010-11-09 |
| 1062 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1-4 - Editorial corrections to EMM test cases | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106336 | agreed | 2010-11-09 | LTE-UEConTest_SIG | - | 2010-11-09 |
| 1063 | - | F | Rel-9 | 9.2.1 | 9.3.0 | Update test case 8.1.2.11 with IMS emergency session setup | RP-50 | RP-101153 | approved | R5 | R5-49 | R5-106524 | agreed | 2010-11-09 | IMS_EMER_LTE_UEConTest | - | 2010-11-09 |
| 1064 | - | F | Rel-9 | 9.2.1 | 9.3.0 | Update references with IMS | RP-50 | RP-101153 | approved | R5 | R5-49 | R5-106525 | agreed | 2010-11-09 | IMS_EMER_LTE_UEConTest | - | 2010-11-09 |
| 1065 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Correction of test cases in 6.1.2 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106555 | agreed | 2010-11-16 | LTE-UEConTest_SIG | - | 2010-11-16 |
| 1066 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.2.8 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106556 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1067 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.12 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106557 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1068 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.13 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106558 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1069 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Making compressed mode configuration optional for FDD and removal of compressed mode requirement for TDD for InterRAT HO test cases 8.4.2.2 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106559 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1070 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Making compressed mode configuration optional for FDD and removal of compressed mode requirement for TDD for InterRAT HO test cases 8.4.2.4 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106560 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1071 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Update of MAC test case 7.1.4.13 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106563 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1072 | - | F | Rel-9 | 9.2.1 | 9.3.0 | Resolve timing issue in P1 RLC TCs | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106564 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1073 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Correction to TC 7.2.3.9 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106565 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1074 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Update of Radio Bearer test procedure used by TC 12.2.1 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106566 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1075 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to Idle mode test case 6.1.2.7 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106567 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1076 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction of test cases in 6.1.2.8 and 6.1.2.9 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106568 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1077 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction of test cases in 6.2.2.1 and 6.2.2.2 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106569 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1078 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EUTRA RRC test case 8.1.3.5 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106570 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1079 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction of test cases in 8.3.1.8 ~ 8.3.1.11 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106572 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1080 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Update to test case 8.4.2.2 and 8.4.2.4 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106573 | agreed | 2010-11-22 | LTE-UEConTest_SIG | - | 2010-11-22 |
| 1081 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to contents for message Extended Service Request | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106574 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1082 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EMM test case 9.1.2.3 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106575 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1083 | - | F | Rel-9 | 9.2.1 | 9.3.0 | Add test case for RRC connection establishment of emergency call / Limited Service | RP-50 | RP-101153 | approved | R5 | R5-49 | R5-106595 | agreed | 2010-11-19 | IMS_EMER_LTE_UEConTest | - | 2010-11-19 |
| 1084 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Correction to EUTRA RRC test case 8.2.4.1 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106598 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1085 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EMM test case 9.2.2.2.2 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106600 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1086 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EMM test case 9.2.3.2.1 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106601 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1087 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Corrections to test case 7.1.5.1 and 7.1.5.2 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106602 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1088 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Addition new test case 6.1.2.13 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106603 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1089 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EMM test case 9.2.1.1.1a | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106604 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1090 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Various corrections to EMM section 9 of 36.523-1 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106605 | agreed | 2010-11-22 | LTE-UEConTest_SIG | - | 2010-11-22 |
| 1092 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3: Correction to multi-layer test cases 13.1.4 and 13.1.5 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106607 | agreed | 2010-11-17 | LTE-UEConTest_SIG | - | 2010-11-17 |
| 1093 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - Update to test case 8.1.1.3 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106608 | agreed | 2010-11-22 | LTE-UEConTest_SIG | - | 2010-11-22 |
| 1094 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Correction to TC 7.3.3.1, 7.3.3.2, 7.3.3.3 and 7.3.3.4 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106619 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1095 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - Update to test case 8.1.1.4 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106621 | agreed | 2010-11-22 | LTE-UEConTest_SIG | - | 2010-11-22 |
| 1096 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - Correction of test cases in 8.3.1.6 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106622 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1097 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - Update to test case 9.2.3.2.5, 9.2.3.2.11, and 9.3.1.12a | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106623 | agreed | 2010-11-22 | LTE-UEConTest_SIG | - | 2010-11-22 |
| 1098 | - | F | Rel-9 | 9.2.1 | 9.3.0 | 9.2.1.3.3 Attach GCF Priority 4 - Addition of new test case 9.2.3.2.13 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106624 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1099 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4: Addition of a new test case 9.2.3.2.1b | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106625 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1100 | - | F | Rel-9 | 9.2.1 | 9.3.0 | Addition of system information combination in Idle Mode test cases | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106626 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1101 | - | F | Rel-9 | 9.2.1 | 9.3.0 | Addition of system information combination in EMM test cases | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106627 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1102 | - | F | Rel-9 | 9.2.1 | 9.3.0 | Addition of system information combination in RRC test cases | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106628 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1103 | - | F | Rel-9 | 9.2.1 | 9.3.0 | Addition of system information combination in Multilayer test cases | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106629 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1104 | - | F | Rel-9 | 9.2.0 | 9.3.0 | Clarification of measurements requirements for Inter-RAT | RP-50 | RP-101159 | approved | R5 | R5-49 | R5-106630 | agreed | 2010-11-18 | LTEimp-eDL_UEConTest | - | 2010-11-18 |
| 1105 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority X - Addition new test case 6.2.3.31 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106631 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1106 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 – Correction to EUTRA MAC test case 7.1.4.8 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106632 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1107 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority TBD - Addition of new idle mode test case for inter-freq cell reselection based on CSG autonomous search | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106635 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1108 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority TBD - Correction to TC 16.1.1.1 Inter-RAT Cell reselection from E-UTRA idle non-CSG cell to a UTRA CSG cell | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106636 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1109 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority TBD - Movement of TC 16.1.1.2 to section 6.3.8 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106637 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1110 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - Addition of new TC 6.3.4 Inter-RAT cell reselection / From UTRA CELL_PCH state to E-UTRA RRC_IDLE CSG cell | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106638 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1112 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Pririty 4 -Making measurement and reporting optional for FDD and removal compressed mode requirement for TDD for Redirection test cases 8.1.3.7 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106641 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1113 | - | F | Rel-9 | 9.2.1 | 9.3.0 | Periodic RI Reporting using PUCCH / Category 1 UE / Transmission mode 3/4 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106642 | agreed | 2010-11-21 | LTE-UEConTest_SIG | - | 2010-11-21 |
| 1114 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority X - Addition of new test case 8.1.2.10 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106875 | agreed | 2010-12-01 | LTE-UEConTest_SIG | - | 2010-12-01 |
| 1115 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF priority X: New test case 9.2.1.2.1c Combined attach procedure / Success / EPS and CS Fallback not preferred | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106877 | agreed | 2010-12-01 | LTE-UEConTest_SIG | - | 2010-12-01 |
| 1116 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority X - Addition of new test case 13.1.X | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106647 | agreed | 2010-11-22 | LTE-UEConTest_SIG | - | 2010-11-22 |
| 1117 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4 - New test case 6.1.1.2 PLMN selection of 'Other PLMN/access technology combinations' / Automatic mode | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106655 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1118 | - | F | Rel-9 | 9.2.1 | 9.3.0 | Cell detection timing related correction to test case 6.2.2.3, 6.2.2.4, 6.2.3.7 and 6.2.3.8 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106876 | agreed | 2010-12-01 | LTE-UEConTest_SIG | - | 2010-12-01 |
| 1119 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Correction to TC 7.2.3.10 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106657 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1120 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Corrections and enhancements to EUTRA PDCP test cases 7.3.3.1, 7.3.3.3, 7.3.4.1 and 7.3.4.2 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106659 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1121 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 3 - Correction to test case 8.1.2.2 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106660 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1122 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Corrections to E-UTRA RRC test case 8.1.2.7 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106661 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1123 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 4: Addition of a new test case 9.2.1.2.1b | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106662 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1124 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EUTRA MAC test case 7.1.4.16 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106666 | agreed | 2010-11-18 | LTE-UEConTest_SIG | - | 2010-11-18 |
| 1125 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1-4 - Editorial corrections to various ESM test cases | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106676 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1126 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1-4 - Editorial corrections to EUTRA Idle Mode test cases | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106678 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1127 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Corrections to E-UTRA PDCP test case 7.3.5.5 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106679 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1128 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 – Correction to EUTRA RLC test case 7.2.3.16 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106680 | agreed | 2010-11-19 | LTE-UEConTest_SIG | - | 2010-11-19 |
| 1129 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Update to test case 9.2.3.3.1 and 9.2.3.3.4 | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106681 | agreed | 2010-11-22 | LTE-UEConTest_SIG | - | 2010-11-22 |
| 1131 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF priority X: New test case 9.2.3.2.1c Combined tracking area update / Success / CS Fallback not preferred | RP-50 | RP-101144 | approved | R5 | R5-49 | R5-106707 | agreed | 2010-11-21 | LTE-UEConTest_SIG | - | 2010-11-21 |
| 1132 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EUTRA RLC test case 7.2.3.21 | RP-50 | RP-101255 | approved | R5 | R5-49 | - | - | 2010-12-01 | LTE-UEConTest_SIG | - | 2010-12-01 |
| 1133 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction of ESM test case 10.3.1 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106062 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1134 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Update of RRC test case 8.2.2.2 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106094 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1135 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 1 - Correction to EMM test case 9.2.3.1.1 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106107 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1136 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to ESM test case 10.4.1 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106108 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1137 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to EMM test case 9.2.3.1.2 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106109 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1138 | - | F | Rel-9 | 9.2.1 | 9.3.0 | GCF Priority 2 - Correction to ESM test case 10.7.2 | RP-50 | RP-101143 | approved | R5 | R5-49 | R5-106111 | agreed | 2010-11-05 | LTE-UEConTest_SIG | - | 2010-11-05 |
| 1139 | - | F | Rel-9 | 9.3.0 | - | CR 36.523-1-1139 New test case 6.2.3.17 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority E-UTRA cells) | - | - | - | G3new | G3new-49 | GP-110020 | revised | 2011-02-10 | LTE-UEConTest_SIG | - | 2011-02-10 |
| 1139 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1139 New test case 6.2.3.17 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority E-UTRA cells) | GP-49 | GP-110417 | approved | G3new | G3new-49 | GP-110417 | agreed | 2011-03-01 | LTE-UEConTest_SIG | - | 2011-03-01 |
| 1140 | - | F | Rel-9 | 9.3.0 | - | CR 36.523-1-1140 New test case 6.2.3.18 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (blacklisted E-UTRA cells) | - | - | - | G3new | G3new-49 | GP-110021 | revised | 2011-02-10 | LTE-UEConTest_SIG | - | 2011-02-10 |
| 1140 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1140 New test case 6.2.3.18 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (blacklisted E-UTRA cells) | GP-49 | GP-110418 | approved | G3new | G3new-49 | GP-110418 | agreed | 2011-03-01 | LTE-UEConTest_SIG | - | 2011-03-01 |
| 1141 | - | F | Rel-9 | 9.3.0 | - | CR 36.523-1-1141 New Test Case 6.2.3.29 - Inter-RAT cell Reselection from GPRS packet_transfer to E-UTRA in CCN mode (PACKET MEASUREMENT ORDER) | - | - | - | G3new | G3new-49 | GP-110044 | revised | 2011-02-13 | LTE-UEConTest_SIG | - | 2011-02-13 |
| 1141 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1141 New Test Case 6.2.3.29 - Inter-RAT cell Reselection from GPRS packet_transfer to E-UTRA in CCN mode (PACKET MEASUREMENT ORDER) | GP-49 | GP-110419 | approved | G3new | G3new-49 | GP-110419 | agreed | 2011-03-01 | LTE-UEConTest_SIG | - | 2011-03-01 |
| 1142 | - | F | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1142 New test case 6.2.3.16 Inter-RAT Cell Reselection / from GSM_Idle to E-UTRAN /based on H_PRIO criteria | GP-49 | GP-110046 | approved | G3new | G3new-49 | GP-110046 | agreed | 2011-02-13 | LTE-UEConTest_SIG | - | 2011-02-13 |
| 1143 | - | F | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1143 Modifications to test cas 6.2.2.6 and 6.2.2.7 | GP-49 | GP-110047 | approved | G3new | G3new-49 | GP-110047 | agreed | 2011-02-13 | LTE-UEConTest_SIG | - | 2011-02-13 |
| 1144 | - | F | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1144 New Test Case 6.2.1.6 - Inter-RAT Background HPLMN Search/Search for correct RAT for HPLMN/Automatic Mode. | GP-49 | GP-110048 | approved | G3new | G3new-49 | GP-110048 | agreed | 2011-02-13 | LTE-UEConTest_SIG | - | 2011-02-13 |
| 1145 | - | F | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1145 New Test Case 6.2.3.24 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE ORDER) | GP-49 | GP-110049 | approved | G3new | G3new-49 | GP-110049 | agreed | 2011-02-13 | LTE-UEConTest_SIG | - | 2011-02-13 |
| 1146 | - | F | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1146 New Test Case 6.2.3.26 - Inter-RAT Autonomous Cell Reselection GPRS Packet_transfer to E-UTRA (NC1 mode) | GP-49 | GP-110050 | approved | G3new | G3new-49 | GP-110050 | agreed | 2011-02-13 | LTE-UEConTest_SIG | - | 2011-02-13 |
| 1147 | - | F | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1147 Correction to GERAN-EUTRAN Inter-RAT testcases 6.2.3.19,6.2.3.21 and 6.2.3.22 | GP-49 | GP-110051 | approved | G3new | G3new-49 | GP-110051 | agreed | 2011-02-13 | LTE-UEConTest_SIG | - | 2011-02-13 |
| 1148 | - | F | Rel-9 | 9.3.0 | - | CR 36.523-1-1148 Allow test cases 6.2.3.21 and 6.2.3.22 to be implemented in the TTCN | - | - | - | G3new | G3new-49 | GP-110052 | revised | 2011-02-13 | LTE-UEConTest_SIG | - | 2011-02-13 |
| 1148 | 1 | F | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1148 Allow test cases 6.2.3.21 and 6.2.3.22 to be implemented in the TTCN | GP-49 | GP-110405 | approved | G3new | G3new-49 | GP-110405 | agreed | 2011-03-01 | LTE-UEConTest_SIG | - | 2011-03-01 |
| 1149 | - | B | Rel-9 | 9.3.0 | - | CR 36.523-1-1149 Addition of new Test case 8.4.4.1 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell | - | - | - | G3new | G3new-49 | GP-110059 | revised | 2011-02-17 | LTE-UEConTest_SIG | - | 2011-02-17 |
| 1149 | 1 | B | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1149 Addition of new Test case 8.4.4.1 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell | GP-49 | GP-110107 | approved | G3new | G3new-49 | GP-110107 | agreed | 2011-03-01 | LTE-UEConTest_SIG | - | 2011-03-01 |
| 1150 | - | B | Rel-9 | 9.3.0 | - | CR 36.523-1-1150 Addition of new Test case 8.4.4.2 Inter-RAT PS Handover failure from GPRS Packet_transfer to E-UTRA cell | - | - | - | G3new | G3new-49 | GP-110060 | revised | 2011-02-17 | LTE-UEConTest_SIG | - | 2011-02-17 |
| 1150 | 1 | B | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1150 Addition of new Test case 8.4.4.2 Inter-RAT PS Handover failure from GPRS Packet_transfer to E-UTRA cell | GP-49 | GP-110108 | approved | G3new | G3new-49 | GP-110108 | agreed | 2011-03-01 | LTE-UEConTest_SIG | - | 2011-03-01 |
| 1151 | - | B | Rel-9 | 9.3.0 | - | CR 36.523-1-1151 Correction to GERAN-EUTRAN Inter-RAT cell reselection testcases 6.2.3.28 and 6.2.3.30. | - | - | - | G3new | G3new-49 | GP-110094 | revised | 2011-02-21 | LTE-UEConTest_SIG | - | 2011-02-21 |
| 1151 | 1 | B | Rel-9 | 9.3.0 | 9.4.0 | CR 36.523-1-1151 Correction to GERAN-EUTRAN Inter-RAT cell reselection testcases 6.2.3.28 and 6.2.3.30. | GP-49 | GP-110420 | approved | G3new | G3new-49 | GP-110420 | agreed | 2011-03-01 | LTE-UEConTest_SIG | - | 2011-03-01 |
| 1152 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to system information in 6.1.2.7 and 6.1.2.11 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110137 | agreed | 2011-02-01 | LTE-UEConTest_SIG | - | 2011-02-01 |
| 1153 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF priority 3: Correction of UTRA cell in Idle and EMM test cases | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110156 | agreed | 2011-02-01 | LTE-UEConTest_SIG | - | 2011-02-01 |
| 1154 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to EUTRA test case 8.3.2.3 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110192 | agreed | 2011-02-07 | LTE-UEConTest_SIG | - | 2011-02-07 |
| 1155 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.1.12 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110194 | agreed | 2011-02-07 | LTE-UEConTest_SIG | - | 2011-02-07 |
| 1156 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 Correction of test case in 6.2.3.4 and 6.3.4 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110205 | agreed | 2011-02-08 | LTE-UEConTest_SIG | - | 2011-02-08 |
| 1157 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 Correction of test case in 8.1.1.6 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110207 | agreed | 2011-02-08 | LTE-UEConTest_SIG | - | 2011-02-08 |
| 1158 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 Correction of test case in 8.1.2.2 and 8.1.2.8 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110208 | agreed | 2011-02-08 | LTE-UEConTest_SIG | - | 2011-02-08 |
| 1159 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 Correction of test case in 8.1.3.4, 8.1.3.6 and 8.1.3.8 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110209 | agreed | 2011-02-08 | LTE-UEConTest_SIG | - | 2011-02-08 |
| 1160 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 Correction of test case in 8.3.1.11 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110211 | agreed | 2011-02-08 | LTE-UEConTest_SIG | - | 2011-02-08 |
| 1161 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1 - Enhancement to EUTRA MAC test case 7.1.4.6 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110220 | agreed | 2011-02-08 | LTE-UEConTest_SIG | - | 2011-02-08 |
| 1162 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1 - Correction to EUTRA PDCP test cases 7.3.4.1 and 7.3.4.2 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110223 | agreed | 2011-02-08 | LTE-UEConTest_SIG | - | 2011-02-08 |
| 1163 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 - Update to test cases 8.1.2.6 and 8.1.2.9 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110230 | agreed | 2011-02-08 | LTE-UEConTest_SIG | - | 2011-02-08 |
| 1164 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 - Correction on TC numbering and update to test case 8.1.2.10 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110231 | agreed | 2011-02-08 | LTE-UEConTest_SIG | - | 2011-02-08 |
| 1165 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Update to test cases 8.4.2.2 and 8.4.2.4 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110232 | agreed | 2011-02-08 | LTE-UEConTest_SIG | - | 2011-02-08 |
| 1166 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Update to test case 9.2.1.2.11 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110234 | agreed | 2011-02-08 | LTE-UEConTest_SIG | - | 2011-02-08 |
| 1167 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Correction to TC 6.2.1.1 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110273 | agreed | 2011-02-09 | LTE-UEConTest_SIG | - | 2011-02-09 |
| 1168 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Correction to TC 6.2.1.2 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110274 | agreed | 2011-02-09 | LTE-UEConTest_SIG | - | 2011-02-09 |
| 1169 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Correction to TC 8.1.3.6 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110277 | agreed | 2011-02-09 | LTE-UEConTest_SIG | - | 2011-02-09 |
| 1170 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Correction to TC 9.2.3.3.1 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110280 | agreed | 2011-02-09 | LTE-UEConTest_SIG | - | 2011-02-09 |
| 1171 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to TC 9.2.1.1.26 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110305 | agreed | 2011-02-10 | LTE-UEConTest_SIG | - | 2011-02-10 |
| 1172 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Update of EMM test case 9.3.1.7a | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110329 | agreed | 2011-02-10 | LTE-UEConTest_SIG | - | 2011-02-10 |
| 1173 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Addition of new test case on Service request for mobile originating 1xCS fallback emergency call | RP-51 | RP-110174 | approved | R5 | R5-50 | R5-110341 | agreed | 2011-02-10 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-02-10 |
| 1174 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Addition of new test case on emergency call in non-allowed CSG cell | RP-51 | RP-110174 | approved | R5 | R5-50 | R5-110342 | agreed | 2011-02-10 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-02-10 |
| 1175 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EUTR-1XRTT test case 6.2.2.4 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110386 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1176 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EUTR-1XRTT test case 6.2.3.9 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110387 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1177 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EUTR-1XRTT test case 6.2.3.10 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110388 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1178 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EUTR-1XRTT test cases 8.4.7.3 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110389 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1179 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3: Correction to EUTR-1XRTT test cases 8.4.7.4 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110390 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1180 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF priority 3: Correction to MAC TBS (MIMO configured) test case 7.1.7.1.5 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110392 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1181 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF priority 3: Correction to MAC TBS (MIMO configured) test case 7.1.7.1.6 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110393 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1182 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1 - Correction to EMM test case 9.2.1.1.2 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110400 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1183 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Addition of new test case 11.2.5 | RP-51 | RP-110174 | approved | R5 | R5-50 | R5-110440 | agreed | 2011-02-11 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-02-11 |
| 1184 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Addition of new test case 11.2.4 | RP-51 | RP-110174 | approved | R5 | R5-50 | R5-110442 | agreed | 2011-02-11 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-02-11 |
| 1185 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 - Addition of new Multilayer Procedures test case 13.4.1.3 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110450 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1186 | - | F | Rel-9 | 9.3.0 | 9.4.0 | New TC 11.2.6 Normal tracking area update for emergency bearer services Local emergency list sent | RP-51 | RP-110174 | approved | R5 | R5-50 | R5-110477 | agreed | 2011-02-11 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-02-11 |
| 1187 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1..4 - Editorial corrections to EMM test cases | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110486 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1188 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF P3 : Corrections to DL and UL SPS grant test cases | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110504 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1189 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Correction to GCF WI-081 MAC test case 7.1.4.4 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110514 | agreed | 2011-02-11 | LTE-UEConTest_SIG | - | 2011-02-11 |
| 1190 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction of Idle testcase 6.2.3.5 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110602 | agreed | 2011-02-14 | LTE-UEConTest_SIG | - | 2011-02-14 |
| 1191 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction of Idle testcase 6.2.3.13 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110603 | agreed | 2011-02-14 | LTE-UEConTest_SIG | - | 2011-02-14 |
| 1192 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 9 - Correction of Idle testcase 6.2.3.31 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110604 | agreed | 2011-02-14 | LTE-UEConTest_SIG | - | 2011-02-14 |
| 1193 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to GCF WI-081 UTRAN - LTE Testcase 6.2.3.3 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110677 | agreed | 2011-02-21 | LTE-UEConTest_SIG | - | 2011-02-21 |
| 1194 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.1 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110711 | agreed | 2011-02-22 | LTE-UEConTest_SIG | - | 2011-02-22 |
| 1195 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.5 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110712 | agreed | 2011-02-22 | LTE-UEConTest_SIG | - | 2011-02-22 |
| 1196 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1 - Correction to E-UTRA MAC test case 7.1.3.3 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110713 | agreed | 2011-02-22 | LTE-UEConTest_SIG | - | 2011-02-22 |
| 1197 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1 - Correction to EUTRA RRC test case 8.3.3.1 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110717 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1198 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.10 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110718 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1199 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1 Correction of test cases in 8.3.3 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110719 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1200 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to EUTRA Idle Mode test case 6.2.3.5 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110721 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1201 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to Idle mode test cases | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110722 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1202 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Update of idle mode TC 6.1.2.7 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110723 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1203 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to EUTRA PDCP test cases 7.3.5.2 and 7.3.5.4 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110724 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1204 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to EUTRA RRC test case 8.1.2.7 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110725 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1205 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF priority 2: Correction of sysinfo combination in EMM and ESM test cases | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110726 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1206 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2-Correction to TC-9.2.1.1.1a | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110728 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1207 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Addition of new TC 6.3.2 Inter-RAT cell reselection / From GSM_Idle/GPRS Packet_Idle to E-UTRA idle CSG cell | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110730 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1208 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Update to test case 6.3.3 and 6.3.4 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110731 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1209 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Addition of new test case 6.2.2.x for Inter-RAT Cell Selection | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110732 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1210 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.1.1.6 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110733 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1211 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.3.2.7 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110734 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1212 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.7 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110735 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1213 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.4 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110737 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1214 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.23 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110738 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1215 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.2.9 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110739 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1216 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.25 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110740 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1217 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.1.16 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110741 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1218 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test cases 9.3.2.2 and 9.3.2.2a | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110742 | agreed | 2011-02-23 | LTE-UEConTest_SIG | - | 2011-02-23 |
| 1219 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.3.1.15 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110751 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1220 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.3.1.3 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110752 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1221 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Correction to TC 9.2.1.1.25 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110753 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1222 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to test case 9.3.1.6 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110754 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1223 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3- TC 9.2.3.2.1a | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110755 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1224 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3-Correction to TC 13.1.4 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110756 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1225 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to MultiLayer test case 13.3.1.1 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110758 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1226 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to Multilayer test case 13.1.3 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110760 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1227 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 - Addition of E-UTRAN test case 6.1.1.3 for Cell reselection of ePLMN in manual mode | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110764 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1228 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 - Addition of E-UTRAN test case 6.1.2.1 for Cell selection in forbidden Tracking Area | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110765 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1229 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 - Correction to test case 6.2.1.3 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110767 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1230 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 - Update to test case 6.3.7 and 6.3.8 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110768 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1231 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 Correction of test case in 8.1.3.7 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110769 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1232 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 - Correction to EUTRA RRC test case 8.1.2.6 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110770 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1233 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Correction to TC 9.2.3.2.1c | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110771 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1234 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 - Correction to EMM test case 9.2.3.2.10 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110772 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1235 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 - Correction to EMM test case 9.2.3.2.9 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110773 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1236 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to EMM test case 9.3.1.7a | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110774 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1237 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to EMM test case 9.3.1.7 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110775 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1238 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.14 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110776 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1239 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.13 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110777 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1240 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4: Correction test case 9.2.1.2.1b, 9.2.1.2.1c and 9.2.3.2.1b to check the signalled MS Radio Access capability | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110778 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1241 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4: Correction to ESM test case 10.9.1 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110779 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1242 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4: New TC 13.1.9 Call setup from E-UTRA RRC_IDLE - CS fallback to GSM with CCO without NACC - MO call | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110781 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1243 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to TCs 9.2.1.2.1 and 13.1.7 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110783 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1244 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Priority X Addition new test case 6.2.3.32 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110790 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1245 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Correction to TC 6.3.7 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110791 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1246 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1 - Update to EUTRA RLC test cases 7.2.3.6, 7.2.3.7, 7.2.3.8 and 7.2.3.17 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110792 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1247 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to EMM test case 9.2.2.2.2 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110793 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1248 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Update of EMM test case 9.2.3.3.6 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110794 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1249 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority X: Adding test case 9.2.1.2.1d Combined attach procedure / Success / EPS and CS Fallback not preferred/data centric UE | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110796 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1250 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority X - Update to test case 13.1.15 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110797 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1251 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Update to chapter '4.3 Repetition of tests' to clarify re-testing in test cases, where HARQ retransmissions are not tolerated | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110798 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1252 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Introduction of new test case 11.2.1 for CT1 aspects of emergency calls | RP-51 | RP-110174 | approved | R5 | R5-50 | R5-110813 | agreed | 2011-02-24 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-02-24 |
| 1253 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Priority 2 -4: Adjusting the power levels of multiple cell, multiple RAT EMM test cases | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110877 | agreed | 2011-03-08 | LTE-UEConTest_SIG | - | 2011-03-08 |
| 1254 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to SMS test cases 11.1.1, 11.1.2, 11.1.3, 11.1.4 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110830 | agreed | 2011-02-24 | LTE-UEConTest_SIG | - | 2011-02-24 |
| 1255 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to E-UTRA RLC test case 7.2.3.16 | RP-51 | RP-110163 | approved | R5 | R5-50 | R5-110876 | agreed | 2011-03-08 | LTE-UEConTest_SIG | - | 2011-03-08 |
| 1256 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 2 - Correction to EUTRA IDLE MODE test case 6.1.2.9 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110062 | agreed | 2011-01-19 | LTE-UEConTest_SIG | - | 2011-01-19 |
| 1257 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to MultiLayer test case 13.4.1.2 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110072 | agreed | 2011-01-19 | LTE-UEConTest_SIG | - | 2011-01-19 |
| 1258 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.1.2.6 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110077 | agreed | 2011-01-19 | LTE-UEConTest_SIG | - | 2011-01-19 |
| 1259 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to ESM test case 10.8.2 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110078 | agreed | 2011-01-19 | LTE-UEConTest_SIG | - | 2011-01-19 |
| 1260 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.1.2.3 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110081 | agreed | 2011-01-19 | LTE-UEConTest_SIG | - | 2011-01-19 |
| 1261 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.9 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110083 | agreed | 2011-01-19 | LTE-UEConTest_SIG | - | 2011-01-19 |
| 1262 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.2.2.1.9 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110085 | agreed | 2011-01-19 | LTE-UEConTest_SIG | - | 2011-01-19 |
| 1263 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.1.24 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110086 | agreed | 2011-01-19 | LTE-UEConTest_SIG | - | 2011-01-19 |
| 1264 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.11 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110087 | agreed | 2011-01-19 | LTE-UEConTest_SIG | - | 2011-01-19 |
| 1265 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 3 - Correction to MultiLayer test case 13.3.1.2 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110091 | agreed | 2011-01-19 | LTE-UEConTest_SIG | - | 2011-01-19 |
| 1266 | - | F | Rel-9 | 9.3.0 | 9.4.0 | CGF Priority 4 - Correction to EUTRA DRB test case 12.3.2 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110097 | agreed | 2011-01-25 | LTE-UEConTest_SIG | - | 2011-01-25 |
| 1267 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF Priority 4 - Correction of cell number description for test case 6.1.1.6 | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110122 | agreed | 2011-01-30 | LTE-UEConTest_SIG | - | 2011-01-30 |
| 1268 | - | F | Rel-9 | 9.3.0 | 9.4.0 | GCF priority 2-4: correction of EMM, RRC, Idle mode TC postamble in connected mode | RP-51 | RP-110162 | approved | R5 | R5-50 | R5-110133 | agreed | 2011-01-31 | LTE-UEConTest_SIG | - | 2011-01-31 |
| 1269 | - | F | Rel-9 | 9.3.0 | - | Addition of new idle mode test case for manual CSG ID selection accross PLMNs | RP-51 | RP-110179 | withdrawn | R5 | R5-50 | R5-110814 | agreed | 2011-02-24 | EHNB-LTE_UEConTest | showed wrong spec number (and wrong CR number) -> RP-110363 | 2011-02-24 |
| 1269 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Addition of new idle mode test case for manual CSG ID selection accross PLMNs | RP-51 | RP-110363 | approved | R5 | R5-50 | R5-110814 | agreed | 2011-02-24 | EHNB-LTE_UEConTest | - | 2011-02-24 |
| 1270 | - | F | Rel-9 | 9.3.0 | - | Addition of new idle mode test case for inter-freq cell reselection to hybrid cell based on CSG autonomous search | RP-51 | RP-110179 | reissued | R5 | R5-50 | R5-110815 | agreed | 2011-02-24 | EHNB-LTE_UEConTest | showed wrong spec number (and wrong CR number) -> RP-110363 | 2011-02-24 |
| 1270 | - | F | Rel-9 | 9.3.0 | 9.4.0 | Addition of new idle mode test case for inter-freq cell reselection to hybrid cell based on CSG autonomous search | RP-51 | RP-110363 | approved | R5 | R5-50 | R5-110815 | agreed | 2011-02-24 | EHNB-LTE_UEConTest | - | 2011-02-24 |
| 1271 | - | B | Rel-9 | 9.4.0 | - | CR 36.523-1-1271 Addition of new Test case 8.4.4.4 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell (CCN mode) | - | - | - | G3new | G3new-50 | GP-110531 | withdrawn | 2011-05-03 | LTE-UEConTest_SIG | - | 2011-05-03 |
| 1272 | - | B | Rel-9 | 9.4.0 | - | CR 36.523-1-1272 Addition of new Test case 8.4.4.5 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell (NC2 mode) | - | - | - | G3new | G3new-50 | GP-110532 | withdrawn | 2011-05-03 | LTE-UEConTest_SIG | - | 2011-05-03 |
| 1273 | - | F | Rel-9 | 9.4.0 | - | CR 36.523-1-1273 Modification of tc 6.2.3.19 | - | - | - | G3new | G3new-50 | GP-110552 | revised | 2011-05-06 | LTE-UEConTest_SIG | - | 2011-05-06 |
| 1273 | 1 | F | Rel-9 | 9.4.0 | 9.5.0 | CR 36.523-1-1273 Modification of tc 6.2.3.19 | GP-50 | GP-110839 | approved | G3new | G3new-50 | GP-110839 | agreed | 2011-05-17 | LTE-UEConTest_SIG | - | 2011-05-17 |
| 1274 | - | F | Rel-9 | 9.4.0 | 9.5.0 | CR 36.523-1-1274 Removal of LTE TC 6.2.3.2 specification due to duplication | GP-50 | GP-110571 | approved | G3new | G3new-50 | GP-110571 | agreed | 2011-05-06 | LTE-UEConTest_SIG | - | 2011-05-06 |
| 1275 | - | F | Rel-9 | 9.4.0 | 9.5.0 | CR 36.523-1-1275 Removal of Test Case 8.4.4.2 | GP-50 | GP-110575 | approved | G3new | G3new-50 | GP-110575 | agreed | 2011-05-08 | LTE-UEConTest_SIG | - | 2011-05-08 |
| 1276 | - | F | Rel-9 | 9.4.0 | - | CR 36.523-1-1276 Addition of new Test Case 8.4.4.3 - Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell (NC1 mode) | - | - | - | G3new | G3new-50 | GP-110548 | withdrawn | 2011-05-09 | LTE-UEConTest_SIG | - | 2011-05-09 |
| 1277 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.2.4.7 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112079 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1278 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.1.1.2 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112080 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1279 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to EUTRA Idle mode test case 6.1.1.1 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112082 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1280 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 1 - Correction to EUTRA PDCP test cases 7.3.4.1 and 7.3.4.2 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112083 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1281 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 4 - Correction to EUTRA RRC test case 8.5.1.4 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112085 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1283 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to EUTRA Idle mode test case 6.1.2.6 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112088 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1284 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to EMM test case 9.2.1.1.1a | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112089 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1285 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.2.3 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112090 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1286 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.2.15 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112093 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1287 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 1 - Correction to EMM test case 9.2.3.1.5 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112094 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1288 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to EMM test case 9.2.1.1.12 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112095 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1289 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.2.2 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112096 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1290 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.2.13 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112097 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1291 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.4 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112098 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1292 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to EMM test cases 9.2.1.2.1, 9.2.2.2.2 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112105 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1293 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to ESM test case 10.3.1 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112106 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1294 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Removal of ESM test case 10.6.2 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112107 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1295 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to EMM test case 9.3.1.7 and 9.3.1.7a | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112109 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1296 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to update reference to 36.508 table 6.4.2.7A-1 and 6.4.2.7A-2 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112118 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1297 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 4 - Correction to EMM test cases 9.2.3.2.5, 9.2.3.2.6 and 9.2.3.2.7 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112121 | agreed | 2011-04-18 | LTE-UEConTest_SIG | - | 2011-04-18 |
| 1298 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to specific message content for RRC Connection Reconfiguration message (Handover test cases) | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112122 | agreed | 2011-04-19 | LTE-UEConTest_SIG | - | 2011-04-19 |
| 1299 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 1 - Correction to GCF WI-081 MAC Testcase 7.1.2.9 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112145 | agreed | 2011-04-26 | LTE-UEConTest_SIG | - | 2011-04-26 |
| 1300 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 4 - remove the message contents from 14.1, 14.2 and 14.3 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112162 | agreed | 2011-04-26 | LTE-UEConTest_SIG | - | 2011-04-26 |
| 1301 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to EUTRA RLC test case 7.2.2.10 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112205 | agreed | 2011-04-27 | LTE-UEConTest_SIG | - | 2011-04-27 |
| 1302 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF priority 4: Correction of UTRA cell in EMM test case 9.2.3.2.8 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112208 | agreed | 2011-04-27 | LTE-UEConTest_SIG | - | 2011-04-27 |
| 1303 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correcting usage of generic test procedure 36.508 cl. 6.4.2.8 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112257 | agreed | 2011-04-28 | LTE-UEConTest_SIG | - | 2011-04-28 |
| 1304 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 4 - Correction to Multilayer test cases 13.2.1, 13.4.1.2, 13.4.1.3 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112262 | agreed | 2011-04-28 | LTE-UEConTest_SIG | - | 2011-04-28 |
| 1305 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF priority 1 - Correction to EUTRA MAC test case 7.1.4.13 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112266 | agreed | 2011-04-28 | LTE-UEConTest_SIG | - | 2011-04-28 |
| 1306 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 4 - Update of EMM test case 9.2.1.1.4 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112276 | agreed | 2011-04-28 | LTE-UEConTest_SIG | - | 2011-04-28 |
| 1307 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Editorial correction to EMM test case 9.2.1.1.26 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112287 | agreed | 2011-04-28 | LTE-UEConTest_SIG | - | 2011-04-28 |
| 1308 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 4 - Correction to TC 8.1.3.7 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112304 | agreed | 2011-04-28 | LTE-UEConTest_SIG | - | 2011-04-28 |
| 1309 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Update of EMM TC 9.2.1.2.13 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112351 | agreed | 2011-04-29 | LTE-UEConTest_SIG | - | 2011-04-29 |
| 1310 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Update of HeNB enhancements test case 6.3.9 | RP-52 | RP-110665 | approved | R5 | R5-51 | R5-112390 | agreed | 2011-04-29 | EHNB-LTE_UEConTest | - | 2011-04-29 |
| 1311 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Update of HeNB enhancements test case 6.4.2 | RP-52 | RP-110665 | approved | R5 | R5-51 | R5-112391 | agreed | 2011-04-29 | EHNB-LTE_UEConTest | - | 2011-04-29 |
| 1312 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Update of idle mode section Table 6.0.1-2 | RP-52 | RP-110665 | approved | R5 | R5-51 | R5-112392 | agreed | 2011-04-29 | EHNB-LTE_UEConTest | - | 2011-04-29 |
| 1313 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.2.5 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112434 | agreed | 2011-04-29 | LTE-UEConTest_SIG | - | 2011-04-29 |
| 1314 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.2.1 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112483 | agreed | 2011-04-29 | LTE-UEConTest_SIG | - | 2011-04-29 |
| 1315 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3: Update of TC 8.3.1.4 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112534 | agreed | 2011-04-29 | LTE-UEConTest_SIG | - | 2011-04-29 |
| 1316 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 – Correction to test case 9.2.3.1.25 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112569 | agreed | 2011-05-05 | LTE-UEConTest_SIG | - | 2011-05-05 |
| 1317 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF priority 1 – Correction to EUTRA MAC test case 7.1.4.10 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112753 | agreed | 2011-05-24 | LTE-UEConTest_SIG | - | 2011-05-24 |
| 1318 | - | F | Rel-9 | 9.4.0 | 9.5.0 | New TC 6.4.6 Inter-RAT cell reselection / From UTRA CELL_PCH to E-UTRA RRC_IDLE member hybrid cell | RP-52 | RP-110665 | approved | R5 | R5-51 | R5-112594 | agreed | 2011-05-09 | EHNB-LTE_UEConTest | - | 2011-05-09 |
| 1319 | - | F | Rel-9 | 9.4.0 | 9.5.0 | New TC 6.4.7 Inter-RAT cell reselection / From GERAN to E-UTRA RRC_IDLE member hybrid cell | RP-52 | RP-110665 | approved | R5 | R5-51 | R5-112595 | agreed | 2011-05-09 | EHNB-LTE_UEConTest | - | 2011-05-09 |
| 1320 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF priority 4 - Addition of Multi-layer Procedures test case 13.1.13 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112602 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1321 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.6 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112603 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1322 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.6 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112604 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1323 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF priority 1 - Modification to EUTRA RLC test case 7.2.3.9 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112605 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1324 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.18 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112606 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1325 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 Correction of CSG test cases | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112607 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1326 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to EUTRA PDCP test cases 7.3.5.2 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112608 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1327 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Review of detach at switch/power off procedure in EMM test cases and Emergency calls over IMS test case 11.2.3 | RP-52 | RP-110648 | approved | R5 | R5-51 | R5-112610 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1328 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 2 - Correction to EMM test case 9.2.3.1.2 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112611 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1328 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Correction to EMM test case 9.2.3.1.2 | RP-52 | RP-110915 | approved | R5 | - | R5-112611 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1329 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 Correction of Measurement configuration test cases | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112614 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1329 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction of Measurement configuration test cases | RP-52 | RP-110915 | approved | R5 | - | R5-112614 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1330 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to EMM test cases 9.2.1.2.5, 9.2.1.2.6 and 9.2.1.2.7 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112615 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1330 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.2.5, 9.2.1.2.6 and 9.2.1.2.7 | RP-52 | RP-110915 | approved | R5 | - | R5-112615 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1331 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to EMM test cases 9.3.1.4 & 9.3.1.5 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112616 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1331 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test cases 9.3.1.4 & 9.3.1.5 | RP-52 | RP-110915 | approved | R5 | - | R5-112616 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1332 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to EMM test case 9.2.3.1.14 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112617 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1332 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.14 | RP-52 | RP-110915 | approved | R5 | - | R5-112617 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1333 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to EMM test case 9.2.3.1.15 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112618 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1333 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.15 | RP-52 | RP-110915 | approved | R5 | - | R5-112618 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1334 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to EMM test case 9.2.3.2.3 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112619 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1334 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.2.3 | RP-52 | RP-110915 | approved | R5 | - | R5-112619 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1335 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to EMM test case 9.2.3.2.9 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112620 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1335 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.2.9 | RP-52 | RP-110915 | approved | R5 | - | R5-112620 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1336 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 2 - Correction to EUTRA MAC test case 7.1.4.3 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112754 | agreed | 2011-05-24 | LTE-UEConTest_SIG | - | 2011-05-24 |
| 1336 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to EUTRA MAC test case 7.1.4.3 | RP-52 | RP-110915 | approved | R5 | - | R5-112754 | - | 2011-05-25 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1337 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to EMM test case 9.2.1.2.8 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112622 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1337 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.2.8 | RP-52 | RP-110915 | approved | R5 | - | R5-112622 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1338 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to EMM test case 9.2.1.2.9 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112623 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1338 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.2.9 | RP-52 | RP-110915 | approved | R5 | - | R5-112623 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1339 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to EMM test case 9.2.3.2.12 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112624 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1339 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.2.12 | RP-52 | RP-110915 | approved | R5 | - | R5-112624 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1340 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to time requirements at cell reselection in EMM test cases | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112625 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1340 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to time requirements at cell reselection in EMM test cases | RP-52 | RP-110915 | approved | R5 | - | R5-112625 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1341 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Addition of new test case 9.2.3.1.22 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112626 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1341 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Addition of new test case 9.2.3.1.22 | RP-52 | RP-110915 | approved | R5 | - | R5-112626 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1342 | - | F | Rel-9 | 9.4.0 | - | Addition of GCF Priority 3 EMM test case 9.2.2.1.4 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112628 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1342 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Addition of GCF Priority 3 EMM test case 9.2.2.1.4 | RP-52 | RP-110915 | approved | R5 | - | R5-112628 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1343 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to Multilayer test case 13.1.3 and 13.1.15 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112629 | agreed | 2011-05-10 | LTE-UEConTest_SIG | - | 2011-05-10 |
| 1343 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Correction to Multilayer test case 13.1.3 and 13.1.15 | RP-52 | RP-110915 | approved | R5 | - | R5-112629 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1344 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - New Multi Layer TC 13.4.2.4 Inter-system mobility / Service based redirection from UTRA to E-UTRA | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112630 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1344 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - New Multi Layer TC 13.4.2.4 Inter-system mobility / Service based redirection from UTRA to E-UTRA | RP-52 | RP-110915 | approved | R5 | - | R5-112630 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1345 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Addition of new test case 13.4.2.2 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112631 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1345 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Addition of new test case 13.4.2.2 | RP-52 | RP-110915 | approved | R5 | - | R5-112631 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1346 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to test case 13.1.4 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112632 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1346 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3- Correction to test case 13.1.4 | RP-52 | RP-110915 | approved | R5 | - | R5-112632 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1347 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Addition of new test case 8.4.3.1 Inter-RAT handover / From E-UTRA to GPRS / PS HO | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112634 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1347 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Prio 3: Addition of new test case 8.4.3.1 Inter-RAT handover / From E-UTRA to GPRS / PS HO | RP-52 | RP-110915 | approved | R5 | - | R5-112634 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1348 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Addition of new test case 13.3.2.1 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112636 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1348 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3 - Addition of new test case 13.3.2.1 | RP-52 | RP-110915 | approved | R5 | - | R5-112636 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1349 | - | F | Rel-9 | 9.4.0 | - | Correction to EMM test case to allow execution of all RAT specific branches using a single MRAT device | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112638 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1349 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Correction to EMM test case to allow execution of all RAT specific branches using a single MRAT device | RP-52 | RP-110915 | approved | R5 | - | R5-112638 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1350 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 4 Addition new test case 9.2.3.1.9 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112639 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1350 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 4 - Addition new test case 9.2.3.1.9 | RP-52 | RP-110915 | approved | R5 | - | R5-112639 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1351 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 4 - Corrections to Extended Service Request message in 9.2.3.2.1b and 13.1.8 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112640 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1351 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 4 - Corrections to Extended Service Request message in 9.2.3.2.1b and 13.1.8 | RP-52 | RP-110915 | approved | R5 | - | R5-112640 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1352 | - | F | Rel-9 | 9.4.0 | - | GCF priority 4 - Addition of EMM test case 9.2.3.1.20 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112641 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1352 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF priority 4 - Addition of EMM test case 9.2.3.1.20 | RP-52 | RP-110915 | approved | R5 | - | R5-112641 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1353 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 4 - Add new test case 13.4.3.1 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112642 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1353 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 4 - Add new test case 13.4.3.1 | RP-52 | RP-110915 | approved | R5 | - | R5-112642 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1354 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 1 - Correction to EMM test case 9.2.1.1.1 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112643 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1354 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 1 - Correction to EMM test case 9.2.1.1.1 | RP-52 | RP-110915 | approved | R5 | - | R5-112643 | - | 2011-05-25 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1355 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Add new test case 11.2.2 | RP-52 | RP-110660 | approved | R5 | R5-51 | R5-112654 | agreed | 2011-05-11 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-05-11 |
| 1356 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Addition of new test case on Attach for emergency bearer services / Rejected / No suitable cells in tracking area / Emergency call using the CS domain | RP-52 | RP-110660 | approved | R5 | R5-51 | R5-112657 | agreed | 2011-05-11 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-05-11 |
| 1357 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Update of IMS Emergency TC 11.2.6 | RP-52 | RP-110660 | approved | R5 | R5-51 | R5-112658 | agreed | 2011-05-11 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-05-11 |
| 1358 | - | F | Rel-9 | 9.4.0 | 9.5.0 | New TC for IMS Emergency 11.2.7 | RP-52 | RP-110660 | approved | R5 | R5-51 | R5-112659 | agreed | 2011-05-11 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-05-11 |
| 1359 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 4 - Update of TC 13.1.9 MO call CS fallback to GSM with CCO without NACC | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112660 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1359 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Priority 4: Update of TC 13_1_9 MO call CS fallback to GSM with CCO without NACC | RP-52 | RP-110915 | approved | R5 | - | R5-112660 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1360 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 4 - New TC 13.1.10 MT call CS fallback to GSM with CCO without NACC PS service susspension | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112661 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1360 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Priority 4: New TC 13_1_10 MT call CS fallback to GSM with CCO without NACC PS service susspension | RP-52 | RP-110915 | approved | R5 | - | R5-112661 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1361 | - | F | Rel-9 | 9.4.0 | - | GCF Priority X Correction of test case in 6.2.2.8 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112666 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1361 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority X - Correction of test case in 6.2.2.8 | RP-52 | RP-110915 | approved | R5 | - | R5-112666 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1362 | - | F | Rel-9 | 9.4.0 | - | GCF Priority X - Addition of new test case 13.1.2a | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112667 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1362 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority X - Addition of new test case 13.1.2a | RP-52 | RP-110915 | approved | R5 | - | R5-112667 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1363 | - | F | Rel-9 | 9.4.0 | - | GCF Priority X - Addition of new test case 13.1.16 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112668 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1363 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority X - Addition of new test case 13.1.16 | RP-52 | RP-110915 | approved | R5 | - | R5-112668 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1364 | - | F | Rel-9 | 9.4.0 | - | Update test case 8.1.2.11 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112671 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1364 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Update test case 8.1.2.11 | RP-52 | RP-110915 | approved | R5 | - | R5-112671 | - | 2011-05-20 | IMS_EMER_LTE_UEConTest | - | 2011-06-03 |
| 1365 | - | F | Rel-9 | 9.4.0 | - | Update test case 8.1.2.12 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112672 | agreed | 2011-05-11 | LTE-UEConTest_SIG | - | 2011-05-11 |
| 1365 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Update test case 8.1.2.12 | RP-52 | RP-110915 | approved | R5 | - | R5-112672 | - | 2011-05-20 | IMS_EMER_LTE_UEConTest | - | 2011-06-03 |
| 1366 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority X Addition new test case 6.4.3 | RP-52 | RP-110665 | approved | R5 | R5-51 | R5-112678 | agreed | 2011-05-12 | EHNB-LTE_UEConTest | - | 2011-05-12 |
| 1367 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority X Addition new test case 6.4.4 | RP-52 | RP-110665 | approved | R5 | R5-51 | R5-112679 | agreed | 2011-05-12 | EHNB-LTE_UEConTest | - | 2011-05-12 |
| 1368 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority X Addition new test case 6.4.5 | RP-52 | RP-110665 | approved | R5 | R5-51 | R5-112680 | agreed | 2011-05-12 | EHNB-LTE_UEConTest | - | 2011-05-12 |
| 1369 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Addition of new HeNB test case for intra-frequency SI acquisition | RP-52 | RP-110665 | approved | R5 | R5-51 | R5-112682 | agreed | 2011-05-12 | EHNB-LTE_UEConTest | - | 2011-05-12 |
| 1370 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority X - Addition of new test case 6.4.1 | RP-52 | RP-110665 | approved | R5 | R5-51 | R5-112750 | agreed | 2011-05-24 | EHNB-LTE_UEConTest | - | 2011-05-24 |
| 1371 | - | F | Rel-9 | 9.4.0 | - | GCF Priority X - Add new test case 9.2.2.1.10 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112757 | agreed | 2011-05-24 | LTE-UEConTest_SIG | - | 2011-05-24 |
| 1371 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority X - Add new test case 9.2.2.1.10 | RP-52 | RP-110915 | approved | R5 | - | R5-112757 | - | 2011-05-25 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1372 | - | F | Rel-9 | 9.4.0 | - | GCF priority 4 - Update Multi-layer Procedures test case 13.1.7 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112687 | agreed | 2011-05-12 | LTE-UEConTest_SIG | - | 2011-05-12 |
| 1372 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF priority 4 - Update Multi-layer Procedures test case 13.1.7 | RP-52 | RP-110915 | approved | R5 | - | R5-112687 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1373 | - | F | Rel-9 | 9.4.0 | - | GCF priority 4 - Addition of Multi-layer Procedures test case 13.1.11 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112688 | agreed | 2011-05-12 | LTE-UEConTest_SIG | - | 2011-05-12 |
| 1373 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF priority 4 - Addition of Multi-layer Procedures test case 13.1.11 | RP-52 | RP-110915 | approved | R5 | - | R5-112688 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1374 | - | F | Rel-9 | 9.4.0 | - | GCF priority 4 - Addition of Multi-layer Procedures test case 13.1.12 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112689 | agreed | 2011-05-12 | LTE-UEConTest_SIG | - | 2011-05-12 |
| 1374 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF priority 4 - Addition of Multi-layer Procedures test case 13.1.12 | RP-52 | RP-110915 | approved | R5 | - | R5-112689 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1375 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 2 - Correction to EUTRA Idle mode test case 6.3.6 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112690 | agreed | 2011-05-12 | LTE-UEConTest_SIG | - | 2011-05-12 |
| 1375 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Correction to EUTRA Idle mode test case 6.3.6 | RP-52 | RP-110915 | approved | R5 | - | R5-112690 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1376 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Addition of a new TC for MCCH information acquisition/UE is switched on | RP-52 | RP-110666 | approved | R5 | R5-51 | R5-112693 | agreed | 2011-05-12 | MBMS_LTE-UEConTest | - | 2011-05-12 |
| 1377 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Addition of a new TC for MCCH information acquisition/ when cell reselection to a cell in a new MBMS area | RP-52 | RP-110666 | approved | R5 | R5-51 | R5-112749 | agreed | 2011-05-24 | MBMS_LTE-UEConTest | - | 2011-05-24 |
| 1378 | - | F | Rel-9 | 9.4.0 | 9.5.0 | Addition of a new TC for MCCH information acquisition/ UE handover to a cell in a new MBMS area | RP-52 | RP-110666 | approved | R5 | R5-51 | R5-112695 | agreed | 2011-05-12 | MBMS_LTE-UEConTest | - | 2011-05-12 |
| 1379 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 3 - Correction to test case 13.1.2 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112701 | agreed | 2011-05-12 | LTE-UEConTest_SIG | - | 2011-05-12 |
| 1379 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 3- Correction to test case 13.1.2 | RP-52 | RP-110915 | approved | R5 | - | R5-112701 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1380 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF priority 4 - Addition of EMM test case 9.2.3.3.3 | RP-52 | RP-110876 | approved | ZTE Corporation | R5-51 | R5-112756 | agreed | 2011-06-01 | LTE-UEConTest_SIG | - | 2011-06-01 |
| 1381 | - | F | Rel-9 | 9.4.0 | - | GCF priority 4 - Update Multi-layer Procedures test case 13.3.1.2 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112703 | agreed | 2011-05-12 | LTE-UEConTest_SIG | - | 2011-05-12 |
| 1381 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF priority 4 - Update Multi-layer Procedures test case 13.3.1.2 | RP-52 | RP-110915 | approved | R5 | - | R5-112703 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1382 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 2 - Corrections to EUTRA RRC test case 8.4.1.2 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112705 | agreed | 2011-05-12 | LTE-UEConTest_SIG | - | 2011-05-12 |
| 1382 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2 - Corrections to EUTRA RRC test case 8.4.1.2 | RP-52 | RP-110915 | approved | R5 | - | R5-112705 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1383 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.17 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112755 | agreed | 2011-05-24 | LTE-UEConTest_SIG | - | 2011-05-24 |
| 1383 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 1 - Corrections to EUTRA RLC test case 7.2.3.17 | RP-52 | RP-110915 | approved | R5 | - | R5-112755 | - | 2011-05-25 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1385 | - | F | Rel-9 | 9.4.0 | - | GCF Priority 2: Update of test case 9.2.3.4.1 | RP-52 | RP-110649 | reissued | R5 | R5-51 | R5-112720 | agreed | 2011-05-12 | LTE-UEConTest_SIG | - | 2011-05-12 |
| 1385 | - | F | Rel-9 | 9.4.0 | 9.5.0 | GCF Priority 2: Update of test case 9.2.3.4.1 | RP-52 | RP-110915 | approved | R5 | - | R5-112720 | - | 2011-05-20 | LTE-UEConTest_SIG | - | 2011-06-03 |
| 1386 | - | F | Rel-9 | 9.6.0 | - | CR 36.523-1-1386 Corrections to GERAN – LTE Tests | - | - | - | G3new | G3new-51 | GP-111045 | revised | 2011-08-23 | GELTE | - | 2011-08-23 |
| 1386 | - | B | Rel-9 | 9.4.0 | 9.5.0 | CR 36.523-1-1386 Addition of new Test case 8.4.4.2 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell (CCN mode) | GP-50 | GP-110831 | approved | G3new | G3new-50 | GP-110831 | agreed | 2011-05-17 | LTE-UEConTest_SIG | - | 2011-05-17 |
| 1386 | 1 | F | Rel-9 | 9.5.0 | 9.6.0 | CR 36.523-1-1386 Corrections to GERAN – LTE Tests | GP-51 | GP-111104 | approved | G3new | G3new-51 | GP-111104 | agreed | 2011-08-30 | GELTE | - | 2011-08-30 |
| 1387 | - | B | Rel-9 | 9.6.0 | - | CR 36.523-1-1387 Addition of new Test case 13.4.2.5 Inter-system mobility / Service based redirection from GSM/GPRS to E-UTRA | - | - | - | G3new | G3new-51 | GP-111055 | withdrawn | 2011-08-23 | LTE-UEConTest_SIG | - | 2011-08-23 |
| 1387 | - | B | Rel-9 | 9.4.0 | 9.5.0 | CR 36.523-1-1387 Addition of new Test case 8.4.4.3 Inter-RAT PS Handover / from GPRS Packet_transfer to E-UTRA cell (NC2 mode) | GP-50 | GP-110832 | approved | G3new | G3new-50 | GP-110832 | agreed | 2011-05-17 | LTE-UEConTest_SIG | - | 2011-05-17 |
| 1388 | - | B | Rel-9 | 9.6.0 | - | CR 36.523-1-1388 Correction to the test procedure 6.2.3.22 | - | - | - | G3new | G3new-51 | GP-111057 | rejected | 2011-08-23 | LTE-UEConTest_SIG | - | 2011-08-23 |
| 1389 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3: Correction of EMM TC 9.2.3.2.1a | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113031 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1390 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to Idle mode test case 6.2.2.7 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113101 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1391 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 -Correction to EUTRA RRC test case 8.1.3.6 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113102 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1392 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 1 - Correction to EUTRA RRC test cases 8.2.4.1, 8.2.4.4 and 8.2.4.7 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113104 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1393 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to EUTRA RRC test case 8.3.1.6 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113105 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1394 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.7 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113106 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1395 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 1 - Correction to EUTRA RRC test case 8.3.3.1 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113107 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1396 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.2.4.7 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113108 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1397 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 1 - Correction to ESM test cases 10.2.1 and 10.4.1 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113110 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1398 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to ESM test cases 10.8.5 and 10.8.6 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113111 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1399 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.1.11 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113113 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1400 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.16 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113114 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1401 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EMM test cases 9.2.3.1.9a and 9.2.3.1.23 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113115 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1402 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to EMM test case 9.2.3.2.2 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113116 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1403 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to EMM test case 9.2.3.2.4 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113117 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1404 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to EMM test case 9.2.3.2.11 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113118 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1405 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.1.25 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113121 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1406 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.2.12 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113124 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1407 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 1 - Correction to several EUTRA RLC test cases | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113129 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1408 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.9 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113131 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1409 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority TBD - Update of test case 6.3.1 Inter-frequency cell reselection / From E-UTRA RRC_IDLE non-CSG cell to E-UTRA RRC_IDLE CSG cell | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113170 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1410 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 - Correction to ESM test case 10.4.1 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113188 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1411 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.7 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113189 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1412 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to Multilayer test case 13.3.1.2 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113190 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1413 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Update of EMM test case 9.2.2.1.9 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113240 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1414 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Update of IMS emergency test case 11.2.3 | RP-53 | RP-111145 | approved | R5 | R5-52 | R5-113270 | agreed | 2011-08-13 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-08-13 |
| 1415 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Update of the case 11.2.4 | RP-53 | RP-111145 | approved | R5 | R5-52 | R5-113293 | agreed | 2011-08-13 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-08-13 |
| 1416 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Update of test case 11.2.5 | RP-53 | RP-111145 | approved | R5 | R5-52 | R5-113294 | agreed | 2011-08-13 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-08-13 |
| 1417 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 - Update test case 9.1.2.3, 9.2.1.1.9, 9.2.1.1.11, 9.2.1.1.25, 9.2.1.2.12, 9.2.2.1.2, 9.2.2.1.3, 9.2.2.1.8, 9.2.2.1.9, 9.2.3.2.4, 9.3.1.6 and 9.3.1.16 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113300 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1418 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to testcase 13.3.2.1 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113325 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1420 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Corrections to TC 6.3.2 Inter-RAT reselection from GERAN to E-UTRA CSG cell | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113331 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1421 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Corrections to TC 6.4.7 Inter-RAT reselection from GERAN to E-UTRA Hybrid cell | RP-53 | RP-111147 | approved | R5 | R5-52 | R5-113332 | agreed | 2011-08-13 | EHNB-LTE_UEConTest | - | 2011-08-13 |
| 1422 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Corrections to HeNB Section 6.3 TCs | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113333 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1423 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Priority 4: Correction to TC 13.1.9 MO call CS fallback to GSM with CCO without NACC | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113360 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1424 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to test case 9.3.1.17 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113364 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1425 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF priority 3 - Update to Multi Layer Procedure test case 13.3.1.1 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113374 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1426 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to test case 9.2.1.2.5 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113482 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1427 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.2.15 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113539 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1428 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Editorial correction to EUTRA RRC test case 8.3.2.4 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113573 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1429 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 / 4 - Editorial corrections to EUTRA MAC test cases 7.1.5.x | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113575 | agreed | 2011-08-13 | LTE-UEConTest_SIG | - | 2011-08-13 |
| 1430 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 1 - Correction to GCF WI-091 MAC Testcase 7.1.4.15 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113672 | agreed | 2011-08-25 | LTE-UEConTest_SIG | - | 2011-08-25 |
| 1431 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 1: Correction to RLC AM test case 7.2.3.6 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113673 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1432 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 1 - Correction to EUTRA RRC test case 8.5.4.1 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113674 | agreed | 2011-08-23 | LTE-UEConTest_SIG | - | 2011-08-23 |
| 1433 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 1 & 3 :Corrections to test cases 9.2.3.1.1, 9.2.3.1.9a & 9.2.3.1.27, to make suitable for single frequency operation | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113675 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1434 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 - Correction to Idle mode test case 6.1.2.6 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113676 | agreed | 2011-08-23 | LTE-UEConTest_SIG | - | 2011-08-23 |
| 1435 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 Complete SIBs Reading for TC 6.2.2.1_2_3_4 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113677 | agreed | 2011-08-25 | LTE-UEConTest_SIG | - | 2011-08-25 |
| 1436 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 Complete SIBs Reading for TC 6.2.3 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113678 | agreed | 2011-08-25 | LTE-UEConTest_SIG | - | 2011-08-25 |
| 1437 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2: Correction to DRX test cases 7.1.6.1 and 7.1.6.2 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113679 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1438 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 Complete SIBs Reading for TC 8.4.2.2.4 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113680 | agreed | 2011-08-25 | LTE-UEConTest_SIG | - | 2011-08-25 |
| 1439 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 & 3: Update of EMM test cases to cater for bands with single frequency operation | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113681 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1440 | - | F | Rel-9 | 9.5.0 | - | GCF Priority 2 - Update of EMM test cases 9.2.1.2.1 | - | - | - | - | - | - | - | 2011-08-26 | LTE-UEConTest_SIG | document not provided | 2011-09-18 |
| 1440 | 1 | F | Rel-9 | 9.5.0 | - | GCF Priority 2 - Update of EMM test cases 9.2.1.2.1 | RP-53 | RP-111307 | revised | R5 | R5-52 | R5-113682 | agreed | 2011-08-26 | LTE-UEConTest_SIG | no CR number shown | 2011-08-26 |
| 1440 | 2 | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 - Update of EMM test case 9.2.1.2.1 | RP-53 | RP-111344 | approved | Qualcomm Incorporated | - | - | - | 2011-09-13 | LTE-UEConTest_SIG | - | 2011-09-16 |
| 1441 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 - Correction to GCF WI-082 EMM LTE MRAT Testcase 9.2.3.1.18/ | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113685 | agreed | 2011-08-25 | LTE-UEConTest_SIG | - | 2011-08-25 |
| 1442 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 Complete SIBs Reading for TC 6.3.2.3.7.8 | RP-53 | RP-111139 | approved | R5 | R5-52 | R5-113687 | agreed | 2011-08-25 | LTE-UEConTest_SIG | - | 2011-08-25 |
| 1443 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Update of test case 6.2.1.1 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113688 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1444 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Update of test case 6.2.3.32 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113689 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1445 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EUTRA MAC test case 7.1.4.14 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113690 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1446 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.2.4.12 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113691 | agreed | 2011-08-23 | LTE-UEConTest_SIG | - | 2011-08-23 |
| 1447 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EMM test case 9.1.5.1 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113692 | agreed | 2011-08-23 | LTE-UEConTest_SIG | - | 2011-08-23 |
| 1448 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EMM test cases 9.3.1.4 and 9.3.1.5 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113693 | agreed | 2011-08-23 | LTE-UEConTest_SIG | - | 2011-08-23 |
| 1449 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction of test case 9.2.3.1.9a | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113694 | agreed | 2011-08-23 | LTE-UEConTest_SIG | - | 2011-08-23 |
| 1450 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to location update message contents | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113695 | agreed | 2011-08-23 | LTE-UEConTest_SIG | - | 2011-08-23 |
| 1451 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Update of EMM test cases to cater for bands with single frequency and LTE only operation | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113696 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1452 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to the value of timer T3402 in EMM test case 9.2.3.1.26 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113699 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1453 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to ESM test cases 10.7.3 and 10.8.3 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113701 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1454 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to GCF WI-081 Idle Mode Testcase 6.1.1.2 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113702 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1455 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4: Correction to Rank Indication test case 7.1.8.1 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113703 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1456 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to EUTRA RRC test case 8.1.2.8 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113704 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1457 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to 8.1.2.13 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113705 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1458 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 – Update to test cases 8.2.1.5 and 8.2.1.6 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113706 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1459 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to EUTRA RRC Test Case 8.4.3.3 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113707 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1460 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Addition of EUTRA RRC Test Case 8.4.1.5 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113708 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1461 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to EMM test case 9.2.3.2.17 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113709 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1462 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4: Correction test case 9.2.1.2.1b to check the signalled MS Radio Access capability | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113710 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1463 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to GCF WI-082 ESM Testcase 10.8.7 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113711 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1464 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EUTRA MAC test cases 7.1.7.1.5 and 7.1.7.1.6 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113849 | agreed | 2011-09-08 | LTE-UEConTest_SIG | - | 2011-09-08 |
| 1465 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to ESM test case 10.9.1 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113713 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1466 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Correction to ESM test case 10.3.1 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113714 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1467 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Update to test case 13.1.15 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113715 | agreed | 2011-08-28 | LTE-UEConTest_SIG | - | 2011-08-28 |
| 1468 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Update of test case 13.1.11 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113716 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1469 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Update of test case 13.1.12 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113717 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1470 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Update of test case 13.1.13 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113718 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1471 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Update of test case 13.1.7 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113719 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1472 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Update of test case 13.1.8 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113720 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1473 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Add new test case 13.4.3.2 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113721 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1474 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Update test case 13.4.3.1 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113722 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1475 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 4 - Add new test case 13.4.3.4 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113723 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1476 | - | F | Rel-9 | 9.5.0 | 9.6.0 | New E-UTRA MAC test case for padding BSR | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113848 | agreed | 2011-09-08 | LTE-UEConTest_SIG | - | 2011-09-08 |
| 1477 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Update test case 8.1.2.12 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113728 | agreed | 2011-08-24 | LTE-UEConTest_SIG | - | 2011-08-24 |
| 1478 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Addition of new test case for e1xCSFB / MT call | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113729 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1479 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Addition of new test case for e1xCSFB / MO call | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113730 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1480 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority X - Update to test case 6.4.1 | RP-53 | RP-111147 | approved | R5 | R5-52 | R5-113754 | agreed | 2011-08-28 | EHNB-LTE_UEConTest | - | 2011-08-28 |
| 1481 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Various updates to Rel-9 HeNB enhancements test cases | RP-53 | RP-111147 | approved | R5 | R5-52 | R5-113755 | agreed | 2011-08-26 | EHNB-LTE_UEConTest | - | 2011-08-26 |
| 1482 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority X Correction of TC 6.4.3.4.5.6.7 | RP-53 | RP-111147 | approved | R5 | R5-52 | R5-113756 | agreed | 2011-08-25 | EHNB-LTE_UEConTest | - | 2011-08-25 |
| 1483 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority X Addition new test case 8.3.4.2 | RP-53 | RP-111147 | approved | R5 | R5-52 | R5-113757 | agreed | 2011-08-25 | EHNB-LTE_UEConTest | - | 2011-08-25 |
| 1484 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority X Addition new test case 8.3.4.4 | RP-53 | RP-111147 | approved | R5 | R5-52 | R5-113758 | agreed | 2011-08-25 | EHNB-LTE_UEConTest | - | 2011-08-25 |
| 1485 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Addition of new HeNB test case for Inter-frequency SI acquisition member Hybrid Cell | RP-53 | RP-111147 | approved | R5 | R5-52 | R5-113759 | agreed | 2011-08-28 | EHNB-LTE_UEConTest | - | 2011-08-28 |
| 1486 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Addition of a new eMBMS test case 17.2.1: UE Acquire the MBMS data based on the SIB13 and MCCH message /MCCH and MTCH are on the same MCH | RP-53 | RP-111148 | approved | R5 | R5-52 | R5-113762 | agreed | 2011-08-25 | MBMS_LTE-UEConTest | - | 2011-08-25 |
| 1487 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Addition of a new eMBMS test case 17.2.2: UE Acquire the MBMS data based on the SIB13 and MCCH message /MCCH and MTCH are on different MCHs | RP-53 | RP-111148 | approved | R5 | R5-52 | R5-113763 | agreed | 2011-08-25 | MBMS_LTE-UEConTest | - | 2011-08-25 |
| 1488 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Addition of a new eMBMS test case 17.2.3: UE Acquire the MBMS data based on the SIB13 and MCCH message /MCCH and MTCH are on different MCHs | RP-53 | RP-111148 | approved | R5 | R5-52 | R5-113764 | agreed | 2011-08-25 | MBMS_LTE-UEConTest | - | 2011-08-25 |
| 1489 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Addition of a new eMBMS test case 17.2.4: Reception of PDCCH DCI format 0 and PHICH in MBSFN subframes | RP-53 | RP-111148 | approved | R5 | R5-52 | R5-113765 | agreed | 2011-08-25 | MBMS_LTE-UEConTest | - | 2011-08-25 |
| 1490 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Addition of a new TC for MCCH information acquisition/ UE is receiving an MBMS service | RP-53 | RP-111148 | approved | R5 | R5-52 | R5-113766 | agreed | 2011-08-25 | MBMS_LTE-UEConTest | - | 2011-08-25 |
| 1491 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Addition of a new TC for MCCH information acquisition/ /UE is not receiving MBMS data | RP-53 | RP-111148 | approved | R5 | R5-52 | R5-113767 | agreed | 2011-08-25 | MBMS_LTE-UEConTest | - | 2011-08-25 |
| 1492 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority X - Addition of new test case 8.2.1.8 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113783 | agreed | 2011-08-28 | LTE-UEConTest_SIG | - | 2011-08-28 |
| 1493 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 - Correction to GCF WI-081 Idle Mode Interband Testcase 6.1.2.5 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113792 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1494 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 - Correction to GCF WI-091 MAC Testcase 7.1.4.16 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113793 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1495 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 - Correction to EMM test cases | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113850 | agreed | 2011-09-08 | LTE-UEConTest_SIG | - | 2011-09-08 |
| 1496 | - | F | Rel-9 | 9.5.0 | 9.6.0 | Clarification of LTE only branch in EMM TCs | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113805 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1497 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.2.3 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113806 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1498 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 & 3 - Update of EMM test cases 9.2.2.1.6, 9.2.2.1.7, 9.2.2.1.8 and 9.2.2.1.9 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113807 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1499 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EMM test case 9.3.1.6 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113808 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1500 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2 - Correction to GCF WI-082 EMM Testcase 9.2.3.3.5 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113809 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1501 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.4 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113810 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1502 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 2, 3 & 4 - Update of EMM test cases 9.2.2.2.2, 9.3.1.3, 9.3.1.12a, 9.3.2.2 and 9.3.2.2a | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113811 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1503 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Addition of new test case 13.3.2.2 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113812 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1504 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 1 & 2 - Update of LTE-C2k test cases 8.4.5.4, 8.4.7.3 and 8.4.7.4 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113813 | agreed | 2011-08-26 | LTE-UEConTest_SIG | - | 2011-08-26 |
| 1505 | - | F | Rel-9 | 9.5.0 | 9.6.0 | GCF Priority 3 - Correction to WI-082 EUTRA EMM Testcase 9.2.3.1.22 | RP-53 | RP-111140 | approved | R5 | R5-52 | R5-113836 | agreed | 2011-08-28 | LTE-UEConTest_SIG | - | 2011-08-28 |
| 1506 | - | F | Rel-9 | 9.6.0 | 9.7.0 | CR 36523-1-1506 Correction to 6.2.3.22 | GP-52 | GP-111502 | approved | G3new | G3new-52 | GP-111502 | agreed | 2011-11-08 | GELTE | - | 2011-11-08 |
| 1507 | - | B | Rel-9 | 9.6.0 | 9.7.0 | CR 36523-1-1507 Addition of new Test case 13.4.2.5 Inter-system mobility / Service based redirection from GSM/GPRS to E-UTRA | GP-52 | GP-111525 | approved | G3new | G3new-52 | GP-111525 | agreed | 2011-10-25 | TEI_Test | - | 2011-10-25 |
| 1508 | - | F | Rel-9 | 9.6.0 | - | CR 36523-1-1508 Handling of Data transfer completion in E-UTRA TC 8.4.4.x | - | - | - | G3new | G3new-52 | GP-111536 | withdrawn | 2011-10-21 | LTE-UEConTest_SIG | - | 2011-10-21 |
| 1509 | - | F | Rel-9 | 9.6.0 | 9.7.0 | CR 36523-1-1509 Moving the TCs under section 8.4.4 to void | GP-52 | GP-111539 | approved | G3new | G3new-52 | GP-111539 | agreed | 2011-10-25 | LTE-UEConTest_SIG | - | 2011-10-25 |
| 1510 | - | F | Rel-9 | 9.6.0 | 9.7.0 | CR 36523-1-1510 Addition of new Test case 13.4.2.6 to 13.4.2.8 | GP-52 | GP-111540 | approved | G3new | G3new-52 | GP-111540 | agreed | 2011-10-25 | LTE-UEConTest_SIG | - | 2011-10-25 |
| 1511 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority U2 - Correction to EUTRA RRC test case 8.3.3.2 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115138 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1512 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Correction to test case 6.1.2.13 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115164 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1513 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority g1 - Correction to GERAN CSFB test cases | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115167 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1514 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Removal of test case 14.3 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115176 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1515 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Correction to Idle Mode Testcase 6.1.1.4 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115228 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1516 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3: Correction to EMM test cases 9.2.2.2.2, 9.3.1.3, 9.3.2.2, 9.3.2.2a | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115230 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1517 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.7 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115239 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1518 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Correction to parameter ' sf-AllocEnd-r9' in MBMS test cases | RP-54 | RP-111593 | approved | R5 | R5-53 | R5-115244 | agreed | 2011-11-06 | MBMS_LTE-UEConTest | - | 2011-11-06 |
| 1519 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Editorial correction to test case 8.1.3.10 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115245 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1520 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Update of test cases 8.4.7.3, 8.4.7.4, 8.4.7.5 and 8.4.7.6 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115272 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1521 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority X Addition new test case 6.1.2.2a | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115305 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1522 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority X Correction for test cases 8.3.4.1_2_3_4 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115311 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1523 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Update of TC 11.2.6 IMS Emergency CT1 aspects | RP-54 | RP-111591 | approved | R5 | R5-53 | R5-115314 | agreed | 2011-11-06 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-11-06 |
| 1524 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.1.25 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115355 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1525 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2 - Correction to EMM test case 9.2.3.3.5 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115361 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1526 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Correction to GCF P3 EMM test case 9.3.1.17 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115370 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1527 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Correction to EUTRA Idle Mode test case 6.1.1.3 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115448 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1528 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Removal of test case 6.1.2.1 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115455 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1529 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority X: Addition of new test case 8.3.1.9a | RP-54 | RP-111591 | approved | R5 | R5-53 | R5-115511 | agreed | 2011-11-06 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-11-06 |
| 1530 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Update of TC 11.2.4 IMS Emergency CT1 aspects | RP-54 | RP-111591 | approved | R5 | R5-53 | R5-115532 | agreed | 2011-11-06 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-11-06 |
| 1531 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.10 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115539 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1532 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.3 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115547 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1533 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2 (and lower) - Corrections to various EMM test cases | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115560 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1534 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2 (and lower) - Corrections to ESM test cases 10.3.1 and 10.9.1 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115561 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1535 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.3.9 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115564 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1536 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2 - Editorial Correction to EUTRA RLC test case 7.2.3.13 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115576 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1537 | - | F | Rel-9 | 9.6.0 | 9.7.0 | CGF Priority 1 - Correction to EUTRA MAC test case 7.1.7.2.1 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115620 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1538 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 1 - Correction to RRC test case 8.5.4.1 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115622 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1539 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2 Correction for test cases 6.1.2.13 and 6.1.2.15 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115624 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1540 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2 - Correction to Idle Mode test case 6.1.1.1 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115625 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1541 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2 - Correction to EMM test case 9.2.3.3.5 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115626 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1542 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2: Corrections to equivalent PLMN test case 9.2.3.1.4 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115627 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1543 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2: Corrections to test case 9.2.3.1.16 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115628 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1544 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Corrections to Idle mode Shared network test cases | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115629 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1545 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3: Addition of new idle mode test case for Manual support for CSG ID selection | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115630 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1546 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Correction to test case 6.2.3.13 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115631 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1547 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.2.1a | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115634 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1548 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Correction to EMM test case 9.1.5.1 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115635 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1549 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Update of EMM test case 9.3.1.15 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115636 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1550 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Update to test case 9.2.3.1.23 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115637 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1551 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Correction to ESM test cases 10.8.5 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115638 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1552 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Update to test case 6.1.2.14 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115639 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1553 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Correction to GCF WI-081 Idle Mode Testcase 6.1.1.3 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115640 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1554 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Removal of TC 11.2.9 | RP-54 | RP-111591 | approved | R5 | R5-53 | R5-115642 | agreed | 2011-11-06 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-11-06 |
| 1555 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Prio 3: Corrections to TC 8.4.3.1 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115644 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1556 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 Correction for test cases 6.2.3.13 and 6.2.3.31 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115645 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1557 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Update to EUTRA RRC test case 8.3.1.6 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115646 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1558 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Correction to EMM test case 9.2.3.1.17 | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115647 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1559 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Correction to EMM test cases 9.3.1.12a | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115648 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1560 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4: Correction to test case 9.2.1.2.1d | RP-54 | RP-111580 | approved | R5 | R5-53 | R5-115649 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1561 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF priority 4: Minor correction to test case 9.2.1.2.1c | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115650 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1562 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Add new test case 13.4.3.3 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115651 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1563 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Add new test case 13.4.3.5 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115652 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1564 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Update test case 13.4.3.2 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115653 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1565 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Update test case 13.4.3.1 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115654 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1566 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Update test case 13.4.3.4 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115655 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1567 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Correction to EMM test case 9.2.3.3.5a | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115656 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1568 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF priority X - new test case 6.1.1.3a for Cell reselection of ePLMN in manual mode / between FDD and TDD | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115792 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1569 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Correction to EUTRA RRC test case 8.2.4.8 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115662 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1570 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Update of TC 11.2.7 IMS Emergency CT1 aspects | RP-54 | RP-111591 | approved | R5 | R5-53 | R5-115672 | agreed | 2011-11-06 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-11-06 |
| 1571 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Update of test case 11.2.1 | RP-54 | RP-111591 | approved | R5 | R5-53 | R5-115673 | agreed | 2011-11-06 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-11-06 |
| 1572 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Update of test case 11.2.3 | RP-54 | RP-111591 | approved | R5 | R5-53 | R5-115675 | agreed | 2011-11-06 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-11-06 |
| 1573 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Update of test case 11.2.4 | RP-54 | RP-111591 | approved | R5 | R5-53 | R5-115676 | agreed | 2011-11-06 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-11-06 |
| 1574 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority U1: Correction to TC 6.3.7 Inter-RAT Cell reselection from E-UTRA idle non-CSG cell to a UTRA CSG cell | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115677 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1575 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority U1 - Correction to EUTRA RRC testc ase 8.4.1.4 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115678 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1576 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Addition of new Rel-9 test case 6.2.3.7a | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115680 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1577 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Addition of new Rel-9 test case 6.2.3.8a | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115681 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1578 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Addition of new new Rel-9 test case 6.2.3.9a | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115682 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1579 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Addition of new Rel-9 test case 6.2.3.10a | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115683 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1580 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority X Addition new test case 6.1.2.3a | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115684 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1581 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority X Addition new test case 6.1.2.17 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115685 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1582 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority X Addition new test case 6.1.2.18 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115686 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1583 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority U2: Correction to TC 6.3.3 Inter-RAT cell reselection / From UTRA_Idle to E-UTRA RRC_IDLE CSG cell | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115687 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1584 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF priority x - Add new test case 6.1.1.1a | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115794 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1585 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority X - Addition of new test case 8.5.1.x | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115691 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1586 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority X - Addition of new test case 8.1.2.x | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115692 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1587 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority X: Addition of new test case 8.3.1.11a | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115693 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1588 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Update of test cases 13.1.11 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115709 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1589 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Update of test cases 13.1.12 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115710 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1590 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4 - Update of test cases 13.1.13 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115711 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1591 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Addition of new test case for e1xCSFB emergency call | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115712 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1592 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Addition of new test case for 1xCSFB emergency call | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115713 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1593 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.26 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115720 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1594 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Maximum bandwidth config for MAC TBS test cases in band 25 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115722 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1595 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 1 - Correction to EUTRA MAC test case 7.1.4.5 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115726 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1596 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Addition of a new TC for Cell reselection / interband operation / Between FDD and TDD | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115793 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1597 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Update of test case 6.2.3.8 and 6.2.3.10 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115753 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1598 | - | F | Rel-9 | 9.6.0 | 9.7.0 | PLMN selection in shared network environment / Automatic mode / between FDD and TDD | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115795 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1599 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Inter-frequency cell reselection according to cell reselection priority provided by SIBs / Between FDD and TDD | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115796 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1600 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Addition of new test case 6.2.3.1a | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115797 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1602 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 4: Modification on the Event A3 timeToTrigger value in TC 8.3.1.6 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115763 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1603 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2 - Update of EMM test case 9.2.2.1.7 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115798 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1604 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Correction to EMM test cases 9.2.3.1.22 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115766 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1605 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 3 - Update of EMM test cases 9.2.3.1.26 Preamble | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115767 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1606 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2 - Update of EMM test cases 9.2.3.2.3 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115768 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1607 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2 - Update test case 9.2.3.1.6 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115769 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1608 | - | F | Rel-9 | 9.6.0 | 9.7.0 | Update test case 11.2.2 | RP-54 | RP-111591 | approved | R5 | R5-53 | R5-115771 | agreed | 2011-11-06 | IMS_EMER_GPRS_EPS_UEConTest | - | 2011-11-06 |
| 1609 | - | F | Rel-9 | 9.6.0 | 9.7.0 | GCF Priority 2 - Correction to Idle mode test case 6.2.2.5 | RP-54 | RP-111581 | approved | R5 | R5-53 | R5-115774 | agreed | 2011-11-06 | LTE-UEConTest_SIG | - | 2011-11-06 |
| 1610 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 1 - Correction of test case 7.1.2.6 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120125 | agreed | 2012-01-19 | LTE-UEConTest_SIG | - | 2012-01-19 |
| 1611 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X Correction of test case 6.1.2.2a | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120156 | agreed | 2012-01-20 | LTE-UEConTest_SIG | - | 2012-01-20 |
| 1612 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X Correction of test case 6.1.2.18 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120158 | agreed | 2012-01-20 | LTE-UEConTest_SIG | - | 2012-01-20 |
| 1613 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 2: Modification on TC 8.1.3.4 RRC connection release / Redirection to another E-UTRAN frequency | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120174 | agreed | 2012-01-20 | LTE-UEConTest_SIG | - | 2012-01-20 |
| 1614 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF priority c1: Correction of measurement gap offset | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120236 | agreed | 2012-01-20 | LTE-UEConTest_SIG | - | 2012-01-20 |
| 1615 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 2 - Correction to EMM test case 9.2.3.1.4 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120265 | agreed | 2012-01-23 | LTE-UEConTest_SIG | - | 2012-01-23 |
| 1616 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 2 - Correction to EUTRA Idlemode testcase 6.1.2.13 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120267 | agreed | 2012-01-23 | LTE-UEConTest_SIG | - | 2012-01-23 |
| 1617 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 3 - Correction to EUTRA MAC testcase 7.1.3.2 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120268 | agreed | 2012-01-23 | LTE-UEConTest_SIG | - | 2012-01-23 |
| 1618 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 4 - Correction to EUTRA MAC testcase 7.1.4.7a | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120269 | agreed | 2012-01-23 | LTE-UEConTest_SIG | - | 2012-01-23 |
| 1619 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 1 - Correction to EUTRA RLC testcase 7.2.3.8 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120270 | agreed | 2012-01-23 | LTE-UEConTest_SIG | - | 2012-01-23 |
| 1620 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 3 - Correction to EUTRA testcase 8.3.1.11 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120271 | agreed | 2012-01-23 | LTE-UEConTest_SIG | - | 2012-01-23 |
| 1621 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority u1 - Correction to EUTRA RRC test case 8.3.3.2 and 8.3.3.3 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120272 | agreed | 2012-01-23 | LTE-UEConTest_SIG | - | 2012-01-23 |
| 1622 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority u1 - Correction to EMM test case 9.2.3.1.6 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120273 | agreed | 2012-01-23 | LTE-UEConTest_SIG | - | 2012-01-23 |
| 1623 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 3 - Correction to EUTRA RRC test case 8.3.1.4 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120356 | agreed | 2012-01-25 | LTE-UEConTest_SIG | - | 2012-01-25 |
| 1624 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.1.23 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120357 | agreed | 2012-01-25 | LTE-UEConTest_SIG | - | 2012-01-25 |
| 1625 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.16 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120398 | agreed | 2012-01-26 | LTE-UEConTest_SIG | - | 2012-01-26 |
| 1626 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.23 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120400 | agreed | 2012-01-26 | LTE-UEConTest_SIG | - | 2012-01-26 |
| 1627 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Update of IMS emergency call test case 11.2.1 | RP-55 | RP-120192 | approved | R5 | R5-54 | R5-120403 | agreed | 2012-01-26 | IMS_EMER_GPRS_EPS_UEConTest | - | 2012-01-26 |
| 1628 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X - Update to test case 8.2.1.8 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120440 | agreed | 2012-01-27 | LTE-UEConTest_SIG | - | 2012-01-27 |
| 1629 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X - Addition of new test case 8.3.1.3a | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120441 | agreed | 2012-01-27 | LTE-UEConTest_SIG | - | 2012-01-27 |
| 1630 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Clarification on specifying parameter values without taking into account uncertainties | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120482 | agreed | 2012-01-27 | LTE-UEConTest_SIG | - | 2012-01-27 |
| 1631 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 4 - Correction to EMM test case 9.2.3.2.13 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120490 | agreed | 2012-01-27 | LTE-UEConTest_SIG | - | 2012-01-27 |
| 1632 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X Correction of test case 6.1.2.17 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120494 | agreed | 2012-01-27 | LTE-UEConTest_SIG | - | 2012-01-27 |
| 1633 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 2 - Correction to EUTRA RRC test case 8.3.2.3 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120528 | agreed | 2012-01-27 | LTE-UEConTest_SIG | - | 2012-01-27 |
| 1634 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 4: Correction to ESM test case 10.3.1 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120541 | agreed | 2012-01-27 | LTE-UEConTest_SIG | - | 2012-01-27 |
| 1635 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 4: Correction to ESM test case 10.9.1 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120542 | agreed | 2012-01-27 | LTE-UEConTest_SIG | - | 2012-01-27 |
| 1636 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U1 - Correction to EUTRA Idle Mode test case 6.2.1.3 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120584 | agreed | 2012-01-27 | LTE-UEConTest_SIG | - | 2012-01-27 |
| 1637 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 2 : Update of inter band cell reselection test case 6.1.2.5 to cater for bands with single frequency operation | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120622 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1638 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 2 - Correction to EMM test case 9.2.3.1.6 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120623 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1639 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 2 - Correction to EMM test case 9.2.3.2.1a | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120624 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1640 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 2 (and lower) - Correction of TAI list fields in EMM test cases | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120625 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1641 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 3 : Update of EMM test cases 9.2.3.1.17 and 9.2.3.1.19 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120627 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1642 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 3 : Update of EMM authentication test case 9.1.2.6 to cater for bands with single frequency operation | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120628 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1643 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.26 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120629 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1644 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.3.4 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120630 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1645 | - | F | Rel-10 | 9.7.0 | 10.0.0 | Addition of new MDT test case for 'Logged MDT / Intra-frequency measurement, logging and reporting / E-UTRA handover' | RP-55 | RP-120199 | approved | R5 | R5-54 | R5-120631 | agreed | 2012-02-07 | MDT_UMTSLTE-UEConTest | - | 2012-02-07 |
| 1646 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 4 - Correction to EMM test case 9.2.1.1.18 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120633 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1647 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 4 - Update to test case 13.4.3.3 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120635 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1648 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 4 - Update to test case 13.4.3.5 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120636 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1649 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 4 - Update test case 13.4.3.2 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120637 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1650 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 4 - Update to test case 14.1 and 14.2 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120638 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1651 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority u1 Correction of test case 6.2.3.3 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120639 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1652 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U1 - update of E-UTRA Idle mode test case 6.2.2.5 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120640 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1653 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U1 - update of E-UTRA RRC test case 8.1.3.7 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120641 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1654 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U1 - update of E-UTRA RRC test case 8.3.2.4 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120642 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1655 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority u1 - Correction to EMM test case 9.2.3.3.1 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120643 | - | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1656 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority u1 - Correction to EMM test case 9.2.1.2.1b | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120644 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1657 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U1 - update of E-UTRA Multi-Layer test case 13.4.2.1 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120645 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1658 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U1 - update of E-UTRA Multi-Layer test case 13.4.2.4 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120646 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1659 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority u1 - Correction to Multilayer test case 13.1.2 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120647 | agreed | 2012-02-07 | LTE-UEConTest_SIG | - | 2012-02-07 |
| 1660 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U2 - update of E-UTRA RRC test case 8.3.2.3 | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120649 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1661 | - | F | Rel-9 | 9.7.0 | 9.8.0 | 8.1.3.12a RRC connection release / Success / With priority information / Inter-band / Between FDD and TDD | RP-55 | RP-120180 | approved | R5 | R5-54 | R5-120650 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1662 | - | F | Rel-9 | 9.7.0 | 9.8.0 | 8.1.3.11a RRC connection release / Redirection to another E-UTRAN band / Between FDD and TDD | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120651 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1663 | - | F | Rel-9 | 9.7.0 | 9.8.0 | 8.2.4.13a RRC connection reconfiguration / Handover / Success (with measurement) / Inter-band / Between FDD and TDD | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120652 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1664 | - | F | Rel-9 | 9.7.0 | 9.8.0 | 8.2.4.14a RRC connection reconfiguration / Handover / Failure / Re-establishment successful / Inter-band / Between FDD and TDD | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120653 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1665 | - | F | Rel-9 | 9.7.0 | 9.8.0 | 8.2.4.15a RRC connection reconfiguration / Handover / Failure / Re-establishment failure / Inter-band / Between FDD and TDD | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120654 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1666 | - | F | Rel-9 | 9.7.0 | 9.8.0 | 8.3.1.14a Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous events A2 and A3 (inter-band measurements) / Between FDD and TDD | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120657 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1667 | - | F | Rel-9 | 9.7.0 | 9.8.0 | 8.3.1.15a Measurement configuration control and reporting / Intra E-UTRAN measurements / Inter-band handover / IE measurement configuration not present / Between FDD and TDD | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120658 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1668 | - | F | Rel-9 | 9.7.0 | 9.8.0 | 8.3.1.16a Measurement configuration control and reporting / Intra E-UTRAN measurements / Continuation of the measurements after RRC connection re-establishment / Inter-band / Between FDD and TDD | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120659 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1669 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority u2 - Correction to EUTRA RRC test case 8.3.3.3 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120660 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1670 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U2 - update of E-UTRA RRC test case 8.4.2.2 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120661 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1671 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U2 - update of E-UTRA RRC test case 8.4.2.4 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120662 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1672 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.1.2 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120663 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1673 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.1.3 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120664 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1674 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.1.15 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120665 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1675 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.4.3.1 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120666 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1676 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.4.3.2 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120667 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1677 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U2 - update of E-UTRA Multi-Layer test case 13.4.3.4 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120668 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1678 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority M1 - update of E-UTRA RRC test case 8.3.2.5 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120669 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1679 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority M1 - update of E-UTRA RRC test case 8.3.2.6 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120670 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1680 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority g1 - Correction to EUTRA Idlemode test case 6.2.3.1 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120671 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1681 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X Correction of test case 6.1.2.3a | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120673 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1682 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X Addition of new test case 6.2.3.3a | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120674 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1683 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X Addition of new test case 6.2.3.5a | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120675 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1684 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X - Addition of new test case 6.2.3.x | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120676 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1685 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Update of test case 11.2.4 | RP-55 | RP-120192 | approved | R5 | R5-54 | R5-120695 | agreed | 2012-02-08 | IMS_EMER_GPRS_EPS_UEConTest | - | 2012-02-08 |
| 1686 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Update of test case 11.2.5 | RP-55 | RP-120192 | approved | R5 | R5-54 | R5-120696 | agreed | 2012-02-08 | IMS_EMER_GPRS_EPS_UEConTest | - | 2012-02-08 |
| 1687 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X - Update of TC 11.2.8 to include IMS procedures | RP-55 | RP-120192 | approved | R5 | R5-54 | R5-120697 | agreed | 2012-02-08 | IMS_EMER_GPRS_EPS_UEConTest | - | 2012-02-08 |
| 1688 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Update test case 11.2.2 | RP-55 | RP-120192 | approved | R5 | R5-54 | R5-120698 | agreed | 2012-02-08 | IMS_EMER_GPRS_EPS_UEConTest | - | 2012-02-08 |
| 1689 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority x - Update test case 8.1.2.11 | RP-55 | RP-120184 | approved | R5 | R5-54 | R5-120699 | agreed | 2012-02-08 | TEI9_Test | - | 2012-02-08 |
| 1690 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority x - Update test case 8.1.2.12 | RP-55 | RP-120184 | approved | R5 | R5-54 | R5-120700 | agreed | 2012-02-08 | TEI9_Test | - | 2012-02-08 |
| 1691 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority x : Update of titles of test cases 8.3.1.9a and 8.3.1.11a | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120701 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1693 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Addition of new test 11.2.10 | RP-55 | RP-120192 | approved | R5 | R5-54 | R5-120703 | agreed | 2012-02-08 | IMS_EMER_GPRS_EPS_UEConTest | - | 2012-02-08 |
| 1694 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X - Addition of new test case 8.3.2.3a | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120705 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1695 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 4 (and higher) - Editorial corrections to various EMM test cases | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120707 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1696 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Addition of new Rel-9 test case 13.4.4.1 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120708 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1697 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Addition of new Rel-9 test case 13.4.4.2 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120709 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1698 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X - update of E-UTRA Multi-Layer test case 13.1.2a | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120710 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1699 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Modification of TC 8.4.7.1: Inter-RAT handover / SRVCC from E-UTRA to 1xRTT(CS) / Speech | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120711 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1700 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Addition for new 13.4.4.3 LTE-CDMA2000-HRPD interworking test case | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120712 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1701 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Addition for new 13.4.4.4 LTE-CDMA2000-HRPD interworking test case | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120713 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1702 | - | F | Rel-9 | 9.7.0 | 9.8.0 | 8.3.1.12a Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous events A3 (inter-band measurements) / Between FDD and TDD | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120714 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1703 | - | F | Rel-9 | 9.7.0 | 9.8.0 | 8.3.1.13a Measurement configuration control and reporting / Intra E-UTRAN measurements / Periodic reporting (intra-frequency and inter-band measurements) / Between FDD and TDD | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120715 | agreed | 2012-02-08 | LTE-UEConTest_SIG | - | 2012-02-08 |
| 1704 | - | F | Rel-10 | 9.7.0 | 10.0.0 | Addition of a new TC 17.3.1 for MBMS Counting / UE not receiving MBMS service | RP-55 | RP-120203 | approved | R5 | R5-54 | R5-120724 | agreed | 2012-02-09 | MBMS_LTE_enh-UEConTest | - | 2012-02-09 |
| 1705 | - | F | Rel-10 | 9.7.0 | 10.0.0 | CA / RRC connection reconfiguration / Carrier Aggregation / SCell addition/ modification/release / Success | RP-55 | RP-120200 | approved | R5 | R5-54 | R5-120727 | agreed | 2012-02-09 | LTE_CA-UEConTest | - | 2012-02-09 |
| 1706 | - | F | Rel-10 | 9.7.0 | 10.0.0 | CA / RRC connection reconfiguration / Carrier Aggregation / SCell SI change / Success | RP-55 | RP-120200 | approved | R5 | R5-54 | R5-120728 | agreed | 2012-02-09 | LTE_CA-UEConTest | - | 2012-02-09 |
| 1707 | - | F | Rel-10 | 9.7.0 | 10.0.0 | CA / RRC connection reconfiguration / SCell addition without UL | RP-55 | RP-120200 | approved | R5 | R5-54 | R5-120729 | agreed | 2012-02-09 | LTE_CA-UEConTest | - | 2012-02-09 |
| 1708 | - | F | Rel-10 | 9.7.0 | 10.0.0 | CA / RRC connection reconfiguration / Handover / Success / SCell addition | RP-55 | RP-120200 | approved | R5 | R5-54 | R5-120730 | agreed | 2012-02-09 | LTE_CA-UEConTest | - | 2012-02-09 |
| 1709 | - | F | Rel-10 | 9.7.0 | 10.0.0 | CA / RRC connection reconfiguration / Handover / Success / SCell becomes PCell | RP-55 | RP-120200 | approved | R5 | R5-54 | R5-120731 | agreed | 2012-02-09 | LTE_CA-UEConTest | - | 2012-02-09 |
| 1710 | - | F | Rel-10 | 9.7.0 | 10.0.0 | CA / Measurement configuration control and reporting / Intra E-UTRAN measurements / Event A6 | RP-55 | RP-120200 | approved | R5 | R5-54 | R5-120732 | agreed | 2012-02-09 | LTE_CA-UEConTest | - | 2012-02-09 |
| 1711 | - | F | Rel-10 | 9.7.0 | 10.0.0 | CA / Measurement configuration control and reporting / Intra E-UTRAN measurements / Additional measurement reporting | RP-55 | RP-120200 | approved | R5 | R5-54 | R5-120733 | agreed | 2012-02-09 | LTE_CA-UEConTest | - | 2012-02-09 |
| 1712 | - | F | Rel-10 | 9.7.0 | 10.0.0 | Addition of new Rel-10 test case 7.1.3.11 CA / Correct HARQ process handling / DCCH and DTCH / Pcell and Scell | RP-55 | RP-120200 | approved | R5 | R5-54 | R5-120734 | agreed | 2012-02-09 | LTE_CA-UEConTest | - | 2012-02-09 |
| 1713 | - | F | Rel-10 | 9.7.0 | 10.0.0 | Addition of new MDT test case for 'Logged MDT / Intra-frequency measurement, logging and reporting / Limiting area scope' | RP-55 | RP-120199 | approved | R5 | R5-54 | R5-120738 | agreed | 2012-02-09 | MDT_UMTSLTE-UEConTest | - | 2012-02-09 |
| 1714 | - | F | Rel-10 | 9.7.0 | 10.0.0 | New Logged MDT test case 8.6.2.1 (Intra-frequency measurement, logging and reporting) | RP-55 | RP-120199 | approved | R5 | R5-54 | R5-120739 | agreed | 2012-02-09 | MDT_UMTSLTE-UEConTest | - | 2012-02-09 |
| 1715 | - | F | Rel-10 | 9.7.0 | 10.0.0 | New Logged MDT test case 8.6.2.2 (Inter-frequency measurement, logging and reporting) | RP-55 | RP-120199 | approved | R5 | R5-54 | R5-120740 | agreed | 2012-02-09 | MDT_UMTSLTE-UEConTest | - | 2012-02-09 |
| 1716 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X - Addition of new test case 8.6.4.y | RP-55 | RP-120199 | approved | R5 | R5-54 | R5-120741 | agreed | 2012-02-09 | MDT_UMTSLTE-UEConTest | - | 2012-02-09 |
| 1717 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X - Addition of new test case 8.6.4.z | RP-55 | RP-120199 | approved | R5 | R5-54 | R5-120742 | agreed | 2012-02-09 | MDT_UMTSLTE-UEConTest | - | 2012-02-09 |
| 1718 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X - Addition of new test case 8.6.x.y | RP-55 | RP-120199 | approved | R5 | R5-54 | R5-120743 | agreed | 2012-02-09 | MDT_UMTSLTE-UEConTest | - | 2012-02-09 |
| 1719 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X - Addition of new test case 8.6.x.z | RP-55 | RP-120199 | approved | R5 | R5-54 | R5-120744 | agreed | 2012-02-09 | MDT_UMTSLTE-UEConTest | - | 2012-02-09 |
| 1720 | - | F | Rel-9 | 9.7.0 | 9.8.0 | Addition of new Rel-9 test case 18.1.1 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120751 | agreed | 2012-02-09 | LTE-UEConTest_SIG | - | 2012-02-09 |
| 1721 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 2 : Introduction of new equivalent , 6.1.2.x test cases to cater for bands with single frequency operation | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120757 | agreed | 2012-02-09 | LTE-UEConTest_SIG | - | 2012-02-09 |
| 1722 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 2 : Introduction of new equivalent 6.1.1.x test cases to cater for bands with single frequency operation | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120758 | agreed | 2012-02-09 | LTE-UEConTest_SIG | - | 2012-02-09 |
| 1723 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U1 - Correction to EUTRA RRC test case 8.1.3.7 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120760 | agreed | 2012-02-09 | LTE-UEConTest_SIG | - | 2012-02-09 |
| 1724 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority U1 - Correction to EUTRA RRC test cases 8.4.1.2 and 8.4.1.4 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120764 | agreed | 2012-02-09 | LTE-UEConTest_SIG | - | 2012-02-09 |
| 1725 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 2 - Correction to EMM test case 9.2.3.2.1 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120765 | agreed | 2012-02-09 | LTE-UEConTest_SIG | - | 2012-02-09 |
| 1726 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority u1 - Update to test case 9.2.3.3.2 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120766 | agreed | 2012-02-09 | LTE-UEConTest_SIG | - | 2012-02-09 |
| 1727 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority u1 - Update to test case 9.2.3.3.3 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120767 | agreed | 2012-02-09 | LTE-UEConTest_SIG | - | 2012-02-09 |
| 1728 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority u1 - Update to test case 9.2.3.3.5 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120768 | agreed | 2012-02-09 | LTE-UEConTest_SIG | - | 2012-02-09 |
| 1729 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority X - Update of test cases 6.2.2.3, 6.2.3.7, 6.2.3.7a, 6.2.3.8, 6.2.3.8a, 6.2.3.9, 6.2.3.9a, 6.2.3.10, 6.2.3.10a | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120769 | agreed | 2012-02-09 | LTE-UEConTest_SIG | - | 2012-02-09 |
| 1730 | - | F | Rel-10 | 9.7.0 | 10.0.0 | Addition of a new Rel-10 test case 17.3.2 | RP-55 | RP-120203 | approved | R5 | R5-54 | R5-120770 | agreed | 2012-02-09 | MBMS_LTE_enh-UEConTest | - | 2012-02-09 |
| 1731 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority 3 - Correction to Idle Mode test case 6.1.2.13 | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120771 | agreed | 2012-02-09 | LTE-UEConTest_SIG | - | 2012-02-09 |
| 1732 | - | F | Rel-9 | 9.7.0 | 9.8.0 | GCF Priority UX – Correction to EUTRA to UTRA Handover testcases | RP-55 | RP-120181 | approved | R5 | R5-54 | R5-120776 | agreed | 2012-02-10 | LTE-UEConTest_SIG | - | 2012-02-10 |
| 1733 | - | F | Rel-9 | 9.7.0 | - | CR 36.523-1-1733 Correction to Idle Mode in test case 6.2.1.6 | - | - | - | G3new | G3new-53 | GP-120005 | revised | 2012-02-01 | LTE-UEConTest_SIG | - | 2012-02-01 |
| 1733 | - | F | Rel-10 | 10.0.0 | 10.1.0 | CR 36.523-1-1733 GCF Priority g1 - Correction to EUTRA-GERAN Idle Mode test case 6.2.3.15 | GP-54 | GP-120496 | approved | G3new | G3new-54 | GP-120496 | agreed | 2012-05-03 | LTE-UEConTest_SIG | - | 2012-05-03 |
| 1733 | 1 | F | Rel-9 | 9.7.0 | 9.8.0 | CR 36.523-1-1733 Correction to Idle Mode in test case 6.2.1.6 | GP-53 | GP-120370 | approved | G3new | G3new-53 | GP-120370 | agreed | 2012-02-28 | LTE-UEConTest_SIG | - | 2012-02-28 |
| 1734 | - | F | Rel-9 | 9.7.0 | - | CR 36.523-1-1734 Correction to Idle Mode in test case 6.2.3.14 | - | - | - | G3new | G3new-53 | GP-120006 | revised | 2012-02-01 | LTE-UEConTest_SIG | - | 2012-02-01 |
| 1734 | - | F | Rel-10 | 10.0.0 | 10.1.0 | CR 36.523-1-1734 GCF Priority g1 - Correction to EUTRA-GERAN Idle Mode test case 6.2.3.16 | GP-54 | GP-120497 | approved | G3new | G3new-54 | GP-120497 | agreed | 2012-05-03 | LTE-UEConTest_SIG | - | 2012-05-03 |
| 1734 | 1 | F | Rel-9 | 9.7.0 | 9.8.0 | CR 36.523-1-1734 Correction to Idle Mode in test case 6.2.3.14 | GP-53 | GP-120371 | approved | G3new | G3new-53 | GP-120371 | agreed | 2012-02-28 | LTE-UEConTest_SIG | - | 2012-02-28 |
| 1735 | - | F | Rel-9 | 9.7.0 | - | CR 36.523-1-1735 Correction to Idle Mode in test case 6.2.3.15 | - | - | - | G3new | G3new-53 | GP-120007 | revised | 2012-02-01 | LTE-UEConTest_SIG | - | 2012-02-01 |
| 1735 | - | F | Rel-10 | 10.0.0 | 10.1.0 | CR 36.523-1-1735 GCF Priority g1 - Correction to EUTRA-GERAN Idle Mode test case 6.2.3.17 | GP-54 | GP-120523 | approved | G3new | G3new-54 | GP-120523 | agreed | 2012-05-03 | LTE-UEConTest_SIG | - | 2012-05-03 |
| 1735 | 1 | F | Rel-9 | 9.7.0 | 9.8.0 | CR 36.523-1-1735 Correction to Idle Mode in test case 6.2.3.15 | GP-53 | GP-120372 | approved | G3new | G3new-53 | GP-120372 | agreed | 2012-02-28 | LTE-UEConTest_SIG | - | 2012-02-28 |
| 1736 | - | F | Rel-10 | 10.0.0 | 10.1.0 | CR 36.523-1-1736 GCF Priority g1 - Correction to EUTRA-GERAN Idle Mode test case 6.2.3.18 | GP-54 | GP-120524 | approved | G3new | G3new-54 | GP-120524 | agreed | 2012-05-03 | LTE-UEConTest_SIG | - | 2012-05-03 |
| 1737 | - | F | Rel-9 | 9.8.0 | 9.9.0 | Removal of technical content in 36.523-1 v9.8.0 and substitution with pointer to the next Release | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121074 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1738 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority m1: Optimisation of frequency allocation | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121080 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1739 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority P2: Optimisation of frequency allocation | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121081 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1740 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority U1 - Correction to EUTRA RRC test case 8.1.3.7 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121087 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1741 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority U1 - Correction to EMM test case 9.2.3.3.6 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121099 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1742 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority U1 - Correction to test EUTRA-UTRA test case 13.3.2.1 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121106 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1743 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority C1 - Correction to test cases 6.2.3.8 and 6.2.3.8a | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121108 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1744 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF priority 3 - Correction to idle mode test case 6.1.2.13 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121142 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1745 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - corrections to TC 13.4.4.3 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121158 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1746 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - corrections to TC 13.4.4.4 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121159 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1747 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF priority x - Update of test case 6.1.1.1a | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121202 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1748 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 2 - Update of test cases 9.3.1.4 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121275 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1749 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Update of Inter-system session management test case 13.4.4.1 and 13.4.4.2 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121278 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1750 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Update to test case 8.6.6.1 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121289 | agreed | 2012-05-13 | MDT_UMTSLTE-UEConTest | - | 2012-05-13 |
| 1751 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.2.4.13 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121293 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1752 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.2.4.15 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121295 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1753 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.3.1.15 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121296 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1754 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.3.1.16 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121297 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1755 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 Correction of test case 8.2.4.10 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121394 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1756 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Update test case 8.1.2.6 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121411 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1757 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Update test case 8.1.2.9 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121412 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1758 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 2 and 3 - Removal of 'Active' flag test cases | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121419 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1759 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Changing to Void of GERAN to E-UTRAN section 8.4.4 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121426 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1760 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority g1 - Correction to EUTRA test case 8.1.3.8 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121437 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1761 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 3 - Correction to EUTRA MAC testcase 7.1.4.2 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121450 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1762 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 1 and 3 - Correction to EMM test cases 9.2.1.1.2 and 9.2.2.1.8 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121465 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1763 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority U1 - Correction to multi-layer test case 13.1.5 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121466 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1764 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF priority 2: Correction to test case 9.2.1.17 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121504 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1765 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF priority G1: Correction to test case 13.4.2.2 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121505 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1766 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Introduction of new PWS test case 18.1.4 | RP-56 | RP-120658 | approved | R5 | R5-55 | R5-121511 | agreed | 2012-05-13 | PWS-RAN-UEConTest | - | 2012-05-13 |
| 1767 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Introduction of new Rel10 CA test case 7.1.4.21 | RP-56 | RP-120662 | approved | R5 | R5-55 | R5-121517 | agreed | 2012-05-13 | LTE_CA-UEConTest | - | 2012-05-13 |
| 1768 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 1, 2, 3, 4 and U1 - Correction to EMM test cases to use new PICS | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121541 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1769 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 1 - Correction to EUTRA RRC test case 8.5.4.1 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121548 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1770 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Correction to ESM test case 10.8.7 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121550 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1771 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Radio Link Failure logging / Reporting at GERAN Inter-RAT handover | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121623 | agreed | 2012-05-13 | MDT_UMTSLTE-UEConTest | - | 2012-05-13 |
| 1772 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Update test case 13.4.3.4 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121632 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1773 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.17 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121666 | agreed | 2012-05-13 | LTE-UEConTest_SIG | - | 2012-05-13 |
| 1774 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority u1 - Correction to Multilayer test case 13.4.2.4 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121703 | agreed | 2012-05-21 | LTE-UEConTest_SIG | - | 2012-05-21 |
| 1775 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 1 and 3 - Correction to EUTRA MAC test cases 7.1.7.1.1, 7.1.7.1.2, 7.1.7.1.3, 7.1.7.1.4, 7.1.7.1.5, 7.1.7.1.6 and 7.1.7.2.1 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121738 | agreed | 2012-05-22 | LTE-UEConTest_SIG | - | 2012-05-22 |
| 1776 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 1 - Correction to EMM test case 9.2.3.1.5 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121739 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1777 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 2: Addition of equivalent EMM test cases for single frequency operation | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121740 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1778 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 2: Corrections to EMM test cases to enable single frequency operation | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121742 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1779 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 2 - Update to test case 10.4.1 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121743 | agreed | 2012-05-22 | LTE-UEConTest_SIG | - | 2012-05-22 |
| 1780 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 3 - Correction to EUTRA MAC testcase 7.1.3.2 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121744 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1781 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Correction to EMM CSG test case 9.3.1.18 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121746 | agreed | 2012-05-22 | LTE-UEConTest_SIG | - | 2012-05-22 |
| 1782 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 3 Update of TC 9.2.3.1.23 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121747 | agreed | 2012-05-22 | LTE-UEConTest_SIG | - | 2012-05-22 |
| 1783 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.1.23, 9.2.3.2.4, 9.2.3.2.14, 9.2.3.2.2, 9.2.3.2.17 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121748 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1784 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 3 - Correction to EMM test case 9.2.3.1.4 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121749 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1785 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 3 - Correction to EMM test case 9.2.2.1.7 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121750 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1786 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Correction to EUTRA Idle Mode test cases 6.1.1.6 and 6.1.1.6a | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121753 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1787 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF priority 4 - Correction to Idle Mode test case 6.1.2.12 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121754 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1788 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Correction to Idle mode test case 6.1.1.6a | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121755 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1789 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Editorial corrections to some EMM test cases | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121756 | agreed | 2012-05-22 | LTE-UEConTest_SIG | - | 2012-05-22 |
| 1790 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Update test case 13.4.3.1 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121757 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1791 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Update test case 13.4.3.2 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121758 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1792 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Update to test case 14.2 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121759 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1793 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority u1 - Update to EUTRA Idle Mode test case 6.2.1.2 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121760 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1794 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority u1 - Correction to EUTRA Idle Mode test case 6.2.1.3 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121761 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1795 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority u1 - Correction to EMM test case 9.2.1.2.11 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121762 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1796 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority u1 - Correction to EMM test case 9.2.1.2.15 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121763 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1797 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority u1 - Correction to EMM test case 9.2.3.3.5 | RP-56 | RP-120645 | approved | R5 | R5-55 | R5-121764 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1798 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority u1 - Correction to EMM test case 9.2.1.2.1d | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121765 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1799 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority u1 - Correction to EMM test case 9.2.3.2.1c | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121766 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1800 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority U1 - Correction to EUTRA Multi-Layer test case 13.1.4 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121767 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1801 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority U1 - Correction to multi-layer test case 13.4.2.1 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121768 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1802 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority g1 - Correction to EUTRA test case 6.2.2.2 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121771 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1803 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority g1 - Correction to EUTRA test case 6.2.3.1 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121772 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1804 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority g1 - Correction to EUTRA test case 8.3.2.2 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121773 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1805 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority g1 - Update to test case 9.2.3.3.5a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121774 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1806 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority g1 - Correction to EMM test case 9.2.3.4.1 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121775 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1807 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority g2 Correction of test case 8.4.3.1 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121776 | agreed | 2012-05-23 | LTE-UEConTest_SIG | - | 2012-05-23 |
| 1808 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Update to test case 6.2.3.33 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121780 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1809 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.1.3.12 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121781 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1810 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.1.3.11 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121782 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1811 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new Rel-9 EUTRA RRC test case 8.1.3.6a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121783 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1812 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.2.4.14 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121784 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1813 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.3.1.12 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121785 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1814 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.3.1.13 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121786 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1815 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.3.1.14 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121787 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1816 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority C2 - Correction to test case 8.4.5.4 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121788 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1817 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Addition of new e1xCSFB Rel-9 test case 8.4.7.7 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121789 | agreed | 2012-05-28 | LTE-UEConTest_SIG | - | 2012-05-28 |
| 1818 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Addition of new e1xCSFB Rel-9 test case 8.4.7.8 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121790 | agreed | 2012-05-28 | LTE-UEConTest_SIG | - | 2012-05-28 |
| 1819 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Addition of new e1xCSFB Rel-9 test case 8.4.7.9 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121791 | agreed | 2012-05-28 | LTE-UEConTest_SIG | - | 2012-05-28 |
| 1820 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Addition of new Rel-9 SRVCC test case 13.4.3.6 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121792 | agreed | 2012-05-28 | LTE-UEConTest_SIG | - | 2012-05-28 |
| 1821 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 13.4.1.4 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121793 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1822 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X Addition of new test case 13.3.1.3 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121794 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1823 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Update of IMS test case 11.2.8 | RP-56 | RP-120655 | approved | R5 | R5-55 | R5-121807 | agreed | 2012-05-25 | IMS_EMER_GPRS_EPS_UEConTest | - | 2012-05-25 |
| 1824 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Add new test case 11.2.11 | RP-56 | RP-120655 | approved | R5 | R5-55 | R5-121808 | agreed | 2012-05-24 | IMS_EMER_GPRS_EPS_UEConTest | - | 2012-05-24 |
| 1825 | - | F | Rel-10 | 10.0.0 | 10.1.0 | New UTRAN ANR/E-UTRAN test case 8.7.1 | RP-56 | RP-120663 | approved | R5 | R5-55 | R5-121826 | agreed | 2012-05-24 | ANR_UTRAN-UEConTest | - | 2012-05-24 |
| 1826 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update of MDT test case 8.6.2.3 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121828 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1827 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update of MDT test case 8.6.2.4 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121829 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1828 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Addition of new MDT test case 8.6.2.5 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121830 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1829 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Addition of new MDT test case 8.6.2.6 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121831 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1830 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Addition of new MDT test case 8.6.2.7 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121832 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1831 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Addition of new MDT test case 8.2.6.8 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121833 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1832 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.6.4.5 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121834 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1833 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.6.4.6 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121836 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1834 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.6.5.1 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121837 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1835 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.6.6.3 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121839 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1836 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new test case 8.6.7.1 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121840 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1837 | - | F | Rel-10 | 10.0.0 | 10.1.0 | New Logged MDT test case 8.6.3.1 | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121841 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1838 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Radio Link Failure logging / Reporting at RRC connection establishment and reestablishment | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121843 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1839 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Radio Link Failure logging / Reporting at E-UTRA handover | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-121844 | agreed | 2012-05-24 | MDT_UMTSLTE-UEConTest | - | 2012-05-24 |
| 1840 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Correction to UE Pre-test condition for TS 36.523-1 Test Case 6.4.7 (Inter-RAT cell reselection / From GSM_Idle/GPRS Packet_Idle to E-UTRA RRC_IDLE member hybrid cell) | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121848 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1841 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Correction of E-UTRAN<>GERAN test cases for Classmark Change | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121849 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1842 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Addition of new PWS Rel-9 test case 18.1.7 | RP-56 | RP-120658 | approved | R5 | R5-55 | R5-121855 | agreed | 2012-05-28 | PWS-RAN-UEConTest | - | 2012-05-28 |
| 1843 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Correction of CA TC 8.2.2.3 | RP-56 | RP-120662 | approved | R5 | R5-55 | R5-121857 | agreed | 2012-05-24 | LTE_CA-UEConTest | - | 2012-05-24 |
| 1844 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Correction of CA TC 8.2.2.4 | RP-56 | RP-120662 | approved | R5 | R5-55 | R5-121858 | agreed | 2012-05-24 | LTE_CA-UEConTest | - | 2012-05-24 |
| 1845 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Correction of CA TC 8.2.2.5 | RP-56 | RP-120662 | approved | R5 | R5-55 | R5-121859 | agreed | 2012-05-24 | LTE_CA-UEConTest | - | 2012-05-24 |
| 1846 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Correction of CA TC 8.2.4.17 | RP-56 | RP-120662 | approved | R5 | R5-55 | R5-121860 | agreed | 2012-05-24 | LTE_CA-UEConTest | - | 2012-05-24 |
| 1847 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Removal of CA TC 8.2.4.16 | RP-56 | RP-120662 | approved | R5 | R5-55 | R5-121861 | agreed | 2012-05-24 | LTE_CA-UEConTest | - | 2012-05-24 |
| 1848 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Correction of CA TC 8.3.1.17 | RP-56 | RP-120662 | approved | R5 | R5-55 | R5-121862 | agreed | 2012-05-24 | LTE_CA-UEConTest | - | 2012-05-24 |
| 1849 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Correction of CA TC 8.3.1.18 | RP-56 | RP-120662 | approved | R5 | R5-55 | R5-121863 | agreed | 2012-05-24 | LTE_CA-UEConTest | - | 2012-05-24 |
| 1850 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Addition of new CA test case | RP-56 | RP-120662 | approved | R5 | R5-55 | R5-121865 | agreed | 2012-05-24 | LTE_CA-UEConTest | - | 2012-05-24 |
| 1851 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.10 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121869 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1852 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 1 - Correction to EUTRA RLC test case 7.2.3.13 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121870 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1853 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 6.1.1.3a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121889 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1854 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 6.1.1.4a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121890 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1855 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 6.1.2.15a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121891 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1856 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 6.1.2.16 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121892 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1857 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X Correction of test cases 6.2.3.3a and 6.2.3.5a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121893 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1858 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4: Modification on TC 8.1.2.9 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121894 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1859 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 8.1.3.11a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121895 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1860 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 8.1.3.12a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121896 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1861 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 8.2.4.13a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121897 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1862 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 8.2.4.14a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121898 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1863 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 8.2.4.15a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-121899 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1864 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Introduction of new Rel10 CA test case 7.1.9.1 | RP-56 | RP-120662 | approved | R5 | R5-55 | R5-122008 | agreed | 2012-06-06 | LTE_CA-UEConTest | - | 2012-06-06 |
| 1865 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Radio Link Failure logging / Reporting at CDMA2000 Inter-RAT handover | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-122009 | agreed | 2012-06-06 | MDT_UMTSLTE-UEConTest | - | 2012-06-06 |
| 1866 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Immediate MDT / Reporting / Location information | RP-56 | RP-120735 | approved | R5 | R5-55 | R5-122010 | agreed | 2012-06-06 | MDT_UMTSLTE-UEConTest | - | 2012-06-06 |
| 1867 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority U1 - Correction to EMM test case 9.2.3.3.2 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122011 | agreed | 2012-06-06 | LTE-UEConTest_SIG | - | 2012-06-06 |
| 1868 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Update of EMM test case 9.2.1.2.1b | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122012 | agreed | 2012-06-06 | LTE-UEConTest_SIG | - | 2012-06-06 |
| 1869 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority X - Update of EMM test case 9.2.1.2.1c | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122013 | agreed | 2012-06-06 | LTE-UEConTest_SIG | - | 2012-06-06 |
| 1870 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Addition of new e1xCSFB Rel-9 test case 13.4.4.5 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122016 | agreed | - | LTE-UEConTest_SIG | - | 2012-06-14 |
| 1871 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 8.3.1.12a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122100 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1872 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Updates to TC 8.3.1.13a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122101 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1873 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 8.3.1.14a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122102 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1874 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 8.3.1.15a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122103 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1875 | - | F | Rel-10 | 10.0.0 | 10.1.0 | Update to TC 8.3.1.16a | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122104 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1876 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority U1 - Correction to EUTRA RRC test case 8.4.2.2 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122105 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1877 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority U1 - Correction to EMM test case 9.2.1.2.13 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122107 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1878 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority U1 - Correction to EMM test case 9.2.3.2.9 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122108 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1879 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority 4 - Correction to EMM test case 9.2.3.2.4 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122113 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1880 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority u1 - Correction to EMM test case 9.2.3.3.3 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122114 | agreed | 2012-05-24 | LTE-UEConTest_SIG | - | 2012-05-24 |
| 1881 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF Priority U1: Modification on TC 9.2.3.2.13 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122115 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1882 | - | F | Rel-10 | 10.0.0 | 10.1.0 | GCF priority 3: Correction to EMM TC 9.2.3.1.17 | RP-56 | RP-120646 | approved | R5 | R5-55 | R5-122119 | agreed | 2012-05-25 | LTE-UEConTest_SIG | - | 2012-05-25 |
| 1883 | - | B | Rel-8 | 10.1.0 | - | CR 36.523-1-1883 Correction of test procedure in 6.2.3.22 - Inter-RAT Cell Reselection Failure / from GPRS Packet_Transfer (NC0 mode) to E-UTRA | - | - | - | G3new | G3new-55 | GP-120840 | withdrawn | 2012-08-21 | TIGHTER | - | 2012-08-21 |
| 1884 | - | F | Rel-10 | 10.1.0 | - | CR 36.523-1-1884 GCF priority g1 - Correction to Idle Mode test case 6.2.3.24 | - | - | - | G3new | G3new-55 | GP-120841 | revised | 2012-08-21 | TIGHTER | - | 2012-08-21 |
| 1884 | 1 | F | Rel-10 | 10.1.0 | 10.2.0 | CR 36.523-1-1884 GCF priority g1 - Correction to Idle Mode test case 6.2.3.24 | GP-55 | GP-121042 | approved | G3new | G3new-55 | GP-121042 | agreed | 2012-08-29 | TEI10_Test | - | 2012-08-29 |
| 1885 | - | F | Rel-10 | 10.1.0 | - | CR 36.523-1-1885 GCF Priority g1 - Correction to Idle mode test case 6.2.3.20 | - | - | - | G3new | G3new-55 | GP-120867 | withdrawn | 2012-08-21 | LTE-UEConTest_SIG | - | 2012-08-21 |
| 1886 | - | F | Rel-10 | 10.1.0 | 10.2.0 | CR 36.523-1-1886 GCF Priority g1 - Correction to Idle mode test case 6.2.3.19 | GP-55 | GP-120868 | approved | G3new | G3new-55 | GP-120868 | agreed | 2012-08-21 | LTE-UEConTest_SIG | - | 2012-08-21 |
| 1887 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1: Optimisation of test frequency allocation of UTRA cell | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123079 | agreed | 2012-07-23 | LTE-UEConTest_SIG | - | 2012-07-23 |
| 1888 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 2 - Correction to test case 9.2.3.2.1 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123099 | agreed | 2012-07-30 | LTE-UEConTest_SIG | - | 2012-07-30 |
| 1889 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority X - Corrections of test case 8.1.3.12 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123102 | agreed | 2012-07-30 | LTE-UEConTest_SIG | - | 2012-07-30 |
| 1890 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 - Correction to EUTRA RRC test case 8.3.2.5 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123119 | agreed | 2012-07-30 | LTE-UEConTest_SIG | - | 2012-07-30 |
| 1891 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 - Correction to EMM test case 9.2.1.2.13 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123120 | agreed | 2012-07-30 | LTE-UEConTest_SIG | - | 2012-07-30 |
| 1892 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 - Correction to EMM test case 9.2.3.3.5a | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123124 | agreed | 2012-07-30 | LTE-UEConTest_SIG | - | 2012-07-30 |
| 1893 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority g1 - Correction to multilayer test case 13.1.7 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123126 | agreed | 2012-07-30 | LTE-UEConTest_SIG | - | 2012-07-30 |
| 1894 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority g1 - Correction to EMM test case 9.2.3.4.1 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123131 | agreed | 2012-07-30 | LTE-UEConTest_SIG | - | 2012-07-30 |
| 1895 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 3 - Correction to EUTRA MAC testcase 7.1.3.2 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123132 | agreed | 2012-07-30 | LTE-UEConTest_SIG | - | 2012-07-30 |
| 1896 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority X - Update to test case 6.2.3.33 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123202 | agreed | 2012-07-31 | LTE-UEConTest_SIG | - | 2012-07-31 |
| 1897 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority U1 - Correction to EMM test case 9.2.3.3.2 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123203 | agreed | 2012-07-31 | LTE-UEConTest_SIG | - | 2012-07-31 |
| 1898 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority C1 - Correction to Rel9 EUTRA-1xRTT test case 6.2.3.10a | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123247 | agreed | 2012-08-01 | LTE-UEConTest_SIG | - | 2012-08-01 |
| 1899 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority C1 - Correction to Rel9 EUTRA-HRPD test case 6.2.3.7a | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123248 | agreed | 2012-08-01 | LTE-UEConTest_SIG | - | 2012-08-01 |
| 1900 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority C1 - Correction to Rel9 EUTRA-1xRTT test case 6.2.3.9a | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123251 | agreed | 2012-08-01 | LTE-UEConTest_SIG | - | 2012-08-01 |
| 1901 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority U1 - Correction to EMM test case 9.2.1.2.13 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123254 | agreed | 2012-08-01 | LTE-UEConTest_SIG | - | 2012-08-01 |
| 1902 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 1 - Correction to EUTRA RRC test case 8.5.4.1 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123325 | agreed | 2012-08-02 | LTE-UEConTest_SIG | - | 2012-08-02 |
| 1903 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 4: Correction to test case 6.1.2.8a | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123415 | agreed | 2012-08-03 | LTE-UEConTest_SIG | - | 2012-08-03 |
| 1904 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Enhancements to LTE CA test case 7.1.9.1 | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123423 | agreed | 2012-08-03 | LTE_CA-UEConTest | - | 2012-08-03 |
| 1905 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Update PWS Rel-9 test case 18.1.4 | RP-57 | RP-121110 | approved | R5 | R5-56 | R5-123424 | agreed | 2012-08-03 | PWS-RAN_UEConTest | - | 2012-08-03 |
| 1906 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 1- Correction to RRC test case 8.1.3.12a | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123432 | agreed | 2012-08-03 | LTE-UEConTest_SIG | - | 2012-08-03 |
| 1907 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 4 - Correction to Idle Mode test case 6.1.1.3b | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123433 | agreed | 2012-08-03 | LTE-UEConTest_SIG | - | 2012-08-03 |
| 1908 | - | F | Rel-11 | 10.1.0 | 11.0.0 | Addition of new TC9.4.5 Integrity protection / Correct functionality of EPS NAS integrity algorithm / ZUC | RP-57 | RP-121122 | approved | R5 | R5-56 | R5-123436 | agreed | 2012-08-03 | EEA3_EIA3_UEConTest | - | 2012-08-03 |
| 1909 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority g1: Correction to EMM TC 9.2.3.4.1 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123474 | agreed | 2012-08-03 | LTE-UEConTest_SIG | - | 2012-08-03 |
| 1910 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Corrections of measGapConfig IE definitions in CDMA2000 related test cases | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123475 | agreed | 2012-08-03 | LTE-UEConTest_SIG | - | 2012-08-03 |
| 1911 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 2: Update MAC TC 7.1.4.16 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123476 | agreed | 2012-08-03 | LTE-UEConTest_SIG | - | 2012-08-03 |
| 1912 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Update MDT TC 8.6.5.3 title | RP-57 | RP-121112 | approved | R5 | R5-56 | R5-123496 | agreed | 2012-08-03 | MDT_UMTSLTE-UEConTest | - | 2012-08-03 |
| 1913 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Update of References to specs and Releases in 36.523-1 v990 (pointer) | RP-57 | RP-121103 | approved | R5 | R5-56 | R5-123536 | agreed | 2012-08-03 | TEI9_Test | - | 2012-08-03 |
| 1914 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Update of References to specs and Releases in 36.523-1 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123539 | agreed | 2012-08-03 | LTE-UEConTest_SIG | - | 2012-08-03 |
| 1915 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Add missing PLMN and TAC | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123541 | agreed | 2012-08-03 | LTE-UEConTest_SIG | - | 2012-08-03 |
| 1916 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 3 - Correction to test cases 9.3.1.4, 9.3.1.5 and 9.3.1.6 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123550 | agreed | 2012-08-03 | LTE-UEConTest_SIG | - | 2012-08-03 |
| 1917 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction to UTRAN ANR E-UTRAN Inter-RAT test case 8.7.1 | RP-57 | RP-121114 | approved | R5 | R5-56 | R5-123554 | agreed | 2012-08-03 | ANR_UTRAN-UEConTest | - | 2012-08-03 |
| 1918 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF priority b1: Correction to test case 6.1.2.5 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123565 | agreed | 2012-08-03 | LTE-UEConTest_SIG | - | 2012-08-03 |
| 1919 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority U1 - Update of EMM TC 9.2.3.2.3 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123586 | agreed | 2012-08-13 | LTE-UEConTest_SIG | - | 2012-08-13 |
| 1920 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF priority 1 - Correction of test case 8.5.4.1 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123637 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1921 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 1..4 - Editorial Corrections to EMM test cases | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123638 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1922 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 3 - Update of EMM test case 9.2.2.1.2 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123640 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1923 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 3 - Correction to EUTRA Idle Mode test case 6.1.1.4 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123641 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1924 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 - Correction to Idle mode test case 6.2.1.1 | RP-57 | RP-121099 | approved | R5 | R5-56 | R5-123642 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1925 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 - Correction to Idle mode test case 6.2.3.13 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123643 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1926 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 - Correction to EMM test case 9.2.3.2.9 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123644 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1927 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 - Correction to EMM test case 9.2.3.2.14 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123645 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1928 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 - Correction to EMM test case 9.2.3.3.2 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123646 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1929 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 - Correction to EMM test case 9.3.1.6 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123647 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1930 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 - Correction to EMM test cases 9.2.1.2.1b and 9.2.1.2.1.c | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123648 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1931 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 Update of TC 9.2.3.3.1 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123649 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1932 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority U1 - Correction to EMM test case 9.2.1.2.9 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123650 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1933 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority U1 - Update of EMM test case 9.2.3.2.1b | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123651 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1934 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority U2 - Correction to UTRA-EUTRA test case 8.4.2.4 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123655 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1935 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority C1 - Correction to test cases 8.3.2.8 and 8.3.2.10 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123656 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1936 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority C1 - Correction to test case 6.2.3.9 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123657 | agreed | 2012-08-14 | LTE-UEConTest_SIG | - | 2012-08-14 |
| 1937 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority g1 - Correction to multilayer test case 13.1.10 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123659 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1938 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority g1 - Correction to multilayer test case 13.1.8 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123660 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1939 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority g1 - Correction to multilayer test case 13.1.9 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123661 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1940 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 3 - Correction to EUTRA MAC test cases 7.1.3.2, 7.1.4.2 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123665 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1941 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction to Rel-9 EUTRA-HRPD Idle Mode test case 6.2.3.8a | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123666 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1942 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority X: Addition of New Inter band test case 6.1.2.15b | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123667 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1943 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction to EUTRA Idle Mode test case 6.1.1.4a | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123668 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1944 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority X - Update of test case 6.1.2.2a | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123669 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1945 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority X - Addition of new test case 8.4.7.11 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123671 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1946 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority X: Correction to test case 13.4.4.1 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123672 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1947 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority X - Update of 13.4.4.5 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123673 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1948 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority X - Update of 8.4.7.x test cases | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123674 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1949 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority x - Addition of new test case 6.2.3.4a : Inter-RAT cell reselection / From UTRA_CELL_PCH state to E-UTRA RRC_IDLE based on RSRQ+RSRP evaluation | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123680 | agreed | 2012-08-15 | LTE-UEConTest_SIG | - | 2012-08-15 |
| 1950 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Update PWS Rel-9 test case 18.1.7 | RP-57 | RP-121110 | approved | R5 | R5-56 | R5-123685 | agreed | 2012-08-15 | PWS-RAN_UEConTest | - | 2012-08-15 |
| 1951 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority X - Addition of New Rel-10 eICIC test case | RP-57 | RP-121117 | approved | R5 | R5-56 | R5-123708 | agreed | 2012-08-15 | eICIC_LTE-UEConTest | - | 2012-08-15 |
| 1952 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Addition of new Rel-10 eICIC test case 8.3.1.19 | RP-57 | RP-121117 | approved | R5 | R5-56 | R5-123709 | agreed | 2012-08-15 | eICIC_LTE-UEConTest | - | 2012-08-15 |
| 1953 | - | F | Rel-11 | 10.1.0 | 11.0.0 | Addition of Test Case 7.3.4.3 Integrity protection Correct functionality of EPS AS integrity algorithms ZUC | RP-57 | RP-121122 | approved | R5 | R5-56 | R5-123721 | agreed | 2012-08-16 | EEA3_EIA3_UEConTest | - | 2012-08-16 |
| 1954 | - | F | Rel-11 | 10.1.0 | 11.0.0 | Addition of new ZUC test case 7.3.3.6 correct functionality of EPS UP encryption algorithms | RP-57 | RP-121122 | approved | R5 | R5-56 | R5-123722 | agreed | 2012-08-16 | EEA3_EIA3_UEConTest | - | 2012-08-16 |
| 1955 | - | F | Rel-11 | 10.1.0 | 11.0.0 | Addition of new TC7.3.3.5 Ciphering and deciphering / Correct functionality of EPS AS encryption algorithms / ZUC | RP-57 | RP-121122 | approved | R5 | R5-56 | R5-123723 | agreed | 2012-08-16 | EEA3_EIA3_UEConTest | - | 2012-08-16 |
| 1956 | - | F | Rel-11 | 10.1.0 | 11.0.0 | Addition of new TC 9.4.6 Ciphering and deciphering / Correct functionality of EPS NAS encryption algorithm / ZUC | RP-57 | RP-121122 | approved | R5 | R5-56 | R5-123724 | agreed | 2012-08-16 | EEA3_EIA3_UEConTest | - | 2012-08-16 |
| 1957 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority g1 - Correction to EUTRA test cases 8.4.3.2 and 8.4.3.3 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123732 | agreed | 2012-08-16 | LTE-UEConTest_SIG | - | 2012-08-16 |
| 1958 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction to EUTRAN-GERAN test cases for classmark change | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123735 | agreed | 2012-08-16 | LTE-UEConTest_SIG | - | 2012-08-16 |
| 1959 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority U1 - Correction to EMM test case 9.2.3.3.4 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123736 | agreed | 2012-08-16 | LTE-UEConTest_SIG | - | 2012-08-16 |
| 1960 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority 3 - Correction to EMM test case 9.2.2.1.3 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123790 | agreed | 2012-08-28 | LTE-UEConTest_SIG | - | 2012-08-28 |
| 1961 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority X Addition of new test case 13.4.1.5 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123738 | agreed | 2012-08-16 | LTE-UEConTest_SIG | - | 2012-08-16 |
| 1962 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority u1 - Correction to SRVCC test cases 13.4.3.1, 13.4.3.2, 13.4.3.4 and 13.4.3.6 | RP-57 | RP-121100 | approved | R5 | R5-56 | R5-123739 | agreed | 2012-08-16 | LTE-UEConTest_SIG | - | 2012-08-16 |
| 1963 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Update test case 11.2.11 | RP-57 | RP-121103 | approved | R5 | R5-56 | R5-123749 | agreed | 2012-08-16 | TEI9_Test | - | 2012-08-16 |
| 1964 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Update of CA TC 7.1.3.11 | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123753 | agreed | 2012-08-16 | LTE_CA-UEConTest | - | 2012-08-16 |
| 1965 | - | F | Rel-10 | 10.1.0 | 10.2.0 | GCF Priority X - Addition of New Carrier Aggregation test case | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123754 | agreed | 2012-08-16 | LTE_CA-UEConTest | - | 2012-08-16 |
| 1966 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction of CA test case 8.2.2.3 | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123755 | agreed | 2012-08-16 | LTE_CA-UEConTest | - | 2012-08-16 |
| 1967 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Addition of new TC 7.1.4.19 CA / UE power headroom reporting / SCell activation and DL pathloss change reporting / Extended PHR | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123756 | agreed | 2012-08-16 | LTE_CA-UEConTest | - | 2012-08-16 |
| 1968 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Addition of new TC 7.1.4.23 CA / Correct handling of MAC control information / Buffer status | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123794 | agreed | 2012-08-28 | LTE_CA-UEConTest | - | 2012-08-28 |
| 1969 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction of CA test case 8.2.2.4 | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123758 | agreed | 2012-08-16 | LTE_CA-UEConTest | - | 2012-08-16 |
| 1970 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction of CA test case 8.2.2.5 | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123759 | agreed | 2012-08-16 | LTE_CA-UEConTest | - | 2012-08-16 |
| 1971 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction of CA test case 8.2.4.17 | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123760 | agreed | 2012-08-16 | LTE_CA-UEConTest | - | 2012-08-16 |
| 1972 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction of CA test case 8.2.4.18 | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123761 | agreed | 2012-08-16 | LTE_CA-UEConTest | - | 2012-08-16 |
| 1973 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction of CA test case 8.3.1.17 | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123762 | agreed | 2012-08-16 | LTE_CA-UEConTest | - | 2012-08-16 |
| 1974 | - | F | Rel-10 | 10.1.0 | 10.2.0 | Correction of CA test case 8.3.1.18 | RP-57 | RP-121113 | approved | R5 | R5-56 | R5-123763 | agreed | 2012-08-16 | LTE_CA-UEConTest | - | 2012-08-16 |
| 1975 | - | F | Rel-10 | 10.1.0 | - | CR 36.523-1-1975 Correction for LTE<>GERAN test case 6.2.3.17 | - | - | - | G3new | G3new-55 | GP-120895 | withdrawn | 2012-08-24 | TEI_Test | - | 2012-08-24 |
| 1975 | - | F | Rel-10 | 10.2.1 | - | CR 36.523-1-1975 TC 6.2.3.28 Clarification of Pre-test conditions | - | - | - | G3new | G3new-56 | GP-121207 | withdrawn | 2012-10-22 | LTE-UEConTest_SIG | - | 2012-10-22 |
| 1975 | - | F | Rel-10 | 10.1.0 | 10.2.0 | CR 36.523-1-1975 GCF Priority g1 - Deletion of Idle mode test case 6.2.3.20 | GP-55 | GP-121043 | approved | G3new | G3new-55 | GP-121043 | agreed | 2012-08-29 | TEI_Test | - | 2012-08-29 |
| 1976 | - | F | Rel-11 | 11.0.0 | 11.1.0 | CR 36.523-1-1976 GCF Priority 2 - Correction to Idle Mode testcases refering to 36.508 6.4.2.7A-2 | GP-56 | GP-121233 | approved | G3new | G3new-56 | GP-121233 | agreed | 2012-11-02 | LTE-UEConTest_SIG | Wrong version on CR cover | 2012-11-02 |
| 1977 | - | F | Rel-11 | 11.0.0 | 11.1.0 | CR 36.523-1-1977 GCF Priority g1 - Corrections to Multi-layer test case 13.4.2.5 | GP-56 | GP-121234 | approved | G3new | G3new-56 | GP-121234 | agreed | 2012-11-08 | LTE-UEConTest_SIG | Wrong version on CR cover | 2012-11-08 |
| 1978 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF P3: Update of TC 9.2.1.1.19 to apply to all types of attach | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125074 | agreed | 2012-10-11 | LTE-UEConTest_SIG | CR | 2012-10-11 |
| 1979 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority U1 - Correction to EMM test case 9.2.3.3.2 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-126067 | agreed | 2012-11-25 | LTE-UEConTest_SIG | CR | 2012-11-25 |
| 1980 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF WI-151 - Correction to LTE FDD-TDD Inter-mode test case 6.1.1.1a | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125080 | agreed | 2012-10-16 | LTE-UEConTest_SIG | CR | 2012-10-16 |
| 1981 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 3: Correction to EMM test case 9.2.3.1.16 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125087 | agreed | 2012-10-16 | LTE-UEConTest_SIG | CR | 2012-10-16 |
| 1982 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 4 - Correction to EUTRA Idle Mode test case 6.1.1.6a | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125126 | agreed | 2012-10-19 | LTE-UEConTest_SIG | CR | 2012-10-19 |
| 1983 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Split of CA TC 7.1.3.11 to Intra-band contiguous CA and Inter-band CA | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-125130 | agreed | 2012-10-19 | LTE_CA-UEConTest | CR | 2012-10-19 |
| 1984 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 3 - Update to Multilayer procedure test cases 13.1.3, 13.3.2.1 and 13.3.2.2 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125132 | agreed | 2012-10-19 | LTE-UEConTest_SIG | CR | 2012-10-19 |
| 1985 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Corrections_TCs_8.4.7.x | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125154 | agreed | 2012-10-22 | TEI9_Test | CR | 2012-10-22 |
| 1986 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Renumbering test case 8.4.7.11 to 8.4.7.10 | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125155 | agreed | 2012-10-22 | TEI9_Test | CR | 2012-10-22 |
| 1987 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of RSRQ EUTRA 6.1.2.18 | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125172 | agreed | 2012-10-22 | TEI9_Test | CR | 2012-10-22 |
| 1988 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of RSRQ EUTRA-GERAN 6.2.3.1a | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125173 | agreed | 2012-10-22 | TEI9_Test | CR | 2012-10-22 |
| 1989 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 3 - Editorial correction for test case 9.2.1.1.25 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125200 | agreed | 2012-10-22 | LTE-UEConTest_SIG | CR | 2012-10-22 |
| 1990 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 3 - Update test case 9.2.1.1.26 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125204 | agreed | 2012-10-22 | LTE-UEConTest_SIG | CR | 2012-10-22 |
| 1991 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction to ANR for UTRAN IRAT (E-UTRAN) test case 8.7.1 | RP-58 | RP-121679 | approved | R5 | R5-57 | R5-125207 | agreed | 2012-10-22 | ANR_UTRAN-UEConTest | CR | 2012-10-22 |
| 1992 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 1 - Correction to Idle Mode test case 6.2.3.6 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125232 | agreed | 2012-10-23 | LTE-UEConTest_SIG | CR | 2012-10-23 |
| 1993 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u1: Correction to RRC test case 8.1.3.7 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125233 | agreed | 2012-10-23 | LTE-UEConTest_SIG | CR | 2012-10-23 |
| 1994 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u1: Correction to RRC test case 8.4.2.2 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125234 | agreed | 2012-10-23 | LTE-UEConTest_SIG | CR | 2012-10-23 |
| 1995 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u2: Correction to RRC test case 8.4.2.4 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125235 | agreed | 2012-10-23 | LTE-UEConTest_SIG | CR | 2012-10-23 |
| 1996 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction to CA test case 8.2.2.4.1 | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-125272 | agreed | 2012-10-24 | LTE_CA-UEConTest | CR | 2012-10-24 |
| 1997 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority U1 - Update test case 6.2.3.3 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125274 | agreed | 2012-10-24 | LTE-UEConTest_SIG | CR | 2012-10-24 |
| 1998 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Clarification to Local Emergency list provided by the NWK and more | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125276 | agreed | 2012-10-24 | TEI9_Test | CR | 2012-10-24 |
| 1999 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 1 - Correction to PDCP test cases 7.3.4.1 and 7.3.4.2 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125317 | agreed | 2012-10-25 | LTE-UEConTest_SIG | CR | 2012-10-25 |
| 2000 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 3 - Update of TC 9.2.3.1.27 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125333 | agreed | 2012-10-25 | LTE-UEConTest_SIG | CR | 2012-10-25 |
| 2001 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Addition of new MDT test case 8.6.7.2 | RP-58 | RP-121676 | approved | R5 | R5-57 | R5-125525 | agreed | 2012-10-26 | MDT_UMTSLTE-UEConTest | CR | 2012-10-26 |
| 2002 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Addition of new MDT test case 8.6.7.3 | RP-58 | RP-121676 | approved | R5 | R5-57 | R5-125526 | agreed | 2012-10-26 | MDT_UMTSLTE-UEConTest | CR | 2012-10-26 |
| 2003 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Update to GCF P3 TCs 9.2.2.1.3 and 9.2.2.1.4 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125532 | agreed | 2012-10-26 | LTE-UEConTest_SIG | CR | 2012-10-26 |
| 2004 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority G1 - Update test case 13.4.3.5 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125584 | agreed | 2012-10-26 | LTE-UEConTest_SIG | CR | 2012-10-26 |
| 2005 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority U2 - Correction to UTRA-EUTRA test case 8.4.2.4 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125633 | agreed | 2012-10-26 | LTE-UEConTest_SIG | CR | 2012-10-26 |
| 2006 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority U2 - Correction to EMM test case 9.2.3.2.3 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125634 | agreed | 2012-10-26 | LTE-UEConTest_SIG | CR | 2012-10-26 |
| 2007 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF WI-151 - Correction to LTE FDD-TDD Inter-mode test case 6.1.1.4a | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125640 | agreed | 2012-10-26 | LTE-UEConTest_SIG | CR | 2012-10-26 |
| 2008 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Editorial corrections to some EMM test cases | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125657 | agreed | 2012-10-29 | LTE-UEConTest_SIG | CR | 2012-10-29 |
| 2009 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Correction to Rel-10 eICIC test case 8.3.1.20 | RP-58 | RP-121682 | approved | R5 | R5-57 | R5-125662 | agreed | 2012-10-30 | eICIC_LTE-UEConTest | CR | 2012-10-30 |
| 2010 | - | F | Rel-10 | 10.2.0 | 10.3.0 | Removal of technical content in 36.523-1 v10.2.0 and substitution with pointer to the next Release | RP-58 | RP-121665 | approved | R5 | R5-57 | R5-125663 | agreed | 2012-10-30 | TEI10_Test | CR | 2012-10-30 |
| 2011 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 4 - Correction to EMM test case 9.2.3.2.13 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125683 | agreed | 2012-11-05 | LTE-UEConTest_SIG | CR | 2012-11-05 |
| 2012 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Split of CA TC 7.1.9.1 to Intra-band contiguous CA and Inter-band CA | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-125685 | agreed | 2012-11-05 | LTE_CA-UEConTest | CR | 2012-11-05 |
| 2013 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 4: Update of EMM test cases 9.2.1.1.1b, 9.2.1.1.15a, 9.2.1.1.16a, 9.2.3.1.15a and 9.2.3.1.18a | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125697 | agreed | 2012-11-05 | LTE-UEConTest_SIG | CR | 2012-11-05 |
| 2014 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 1 - Correction to PDCP test case 7.3.3.1, 7.3.3.2, 7.3.3.3 and 7.3.3.4 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125702 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2015 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 1 - Correction to EUTRA RRC test case 8.5.4.1 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125703 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2016 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 1 - Correction to EMM test case 9.2.3.3.5a | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125704 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2017 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 2 - Correction to Idle Mode testcases refering to 36.508 6.4.2.7A-2 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125705 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2018 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 2 - Update test case 9.2.2.2.2 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125707 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2019 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 3 - Correction to EMM test case 9.3.1.6 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125708 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2020 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 3 - Correction to EMM test case 9.2.2.1.3 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125710 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2021 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 3 - Update test case 9.2.1.1.24 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125711 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2022 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 3 - update of TC 9.2.1.1.24 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125712 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2023 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 3: Modification of TC 6.1.2.13 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125713 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2024 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF priority 3: Modification of TC 8.3.1.4 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125714 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2025 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF priority 3: Modification of TC 8.3.2.6 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125715 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2026 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 2: Modification of EMM TC 9.2.2.1.6 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125716 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2027 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF priority 2: Modification of TC 8.3.1.1 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125717 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2028 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF priority 2: Modification of TC 8.3.1.2 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125718 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2029 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 4 - Corrections to Single Frequency EUTRA Idle Mode test cases | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125720 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2030 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 4 - Correction to EUTRA Idle Mode test case 6.1.2.9a | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125721 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2031 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of Rel-9 inter-band test case 8.3.1.16 | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125722 | agreed | 2012-11-06 | TEI9_Test | CR | 2012-11-06 |
| 2032 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction to Rel-9 EUTRA FDD-TDD test case 8.2.4.14a | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125723 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2033 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction to Rel-9 EUTRA FDD-TDD test case 8.2.4.15a | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125724 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2034 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 4: Update of EMM test case 9.2.3.2.4 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125725 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2035 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 4: Corrections to user PLMN reselection test cases | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125726 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2036 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 4 - Correction to test case 6.3.5 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125728 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2037 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority U1 - Update test case 6.2.3.6 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125729 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2038 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u1 - Correction to preamble in 6.2.2.8/6.2.3.3/6.2.3.3a/6.4.5 test cases | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125730 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2039 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u1: Modification of TC 6.2.3.13 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125731 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2040 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u1: Modification of TC 6.2.3.32 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125732 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2041 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u1 - Update to RRC test case 8.3.2.3 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125733 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2042 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u1 - Update to RRC test case 8.3.2.4 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125734 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2043 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF priority u1: Modification of TC 8.3.2.3 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125735 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2044 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF priority u1: Modification of TC 8.3.2.4 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125736 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2045 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u1 - Correction to EMM test case 9.2.3.3.5 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-126068 | agreed | 2012-11-25 | LTE-UEConTest_SIG | CR | 2012-11-25 |
| 2046 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u1: Modification of EMM TC 9.2.3.2.1a | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125738 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2047 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u1 - Update to SRVCC test cases 13.4.3.1, 13.4.3.2, 13.4.3.4 and 13.4.3.6 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125740 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2048 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority U1 - Update test case 13.4.3.1 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125741 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2049 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority U1 - Update test case 13.4.3.2 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125742 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2050 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority U1 - Update test case 13.4.3.4 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125743 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2051 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority u2 - Update to RRC test case 8.3.3.2 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125744 | agreed | 2012-11-06 | LTE-UEConTest_SIG | CR | 2012-11-06 |
| 2052 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF P4: Update of TC 9.2.1.1.3 to clarify applicability of all types of attach and more | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125747 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2053 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF P4: Update of TC 9.2.1.1.4 to clarify applicability of all types of attach and more | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125748 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2054 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF priority g1: Modification of TC 8.3.2.2 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125749 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2055 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF priority g2: Modification of TC 8.3.2.1 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125750 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2058 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority m1 - Update of RRC test cases 8.3.2.5 and 8.3.2.6 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125753 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2059 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority i1 - Correction to LTE FDD-TDD Inter-mode test case 13.4.1.3 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125754 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2060 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction to test cases 6.1.2.15, 6.1.2.15a and 6.1.2.15b | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125756 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2061 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction to EUTRANFeatureGroupIndicators in EMM test cases | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125757 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2062 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction to TS 36.523-1 TC 9.2.3.1.5 ""Periodic tracking area update / Accepted"" | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125758 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2063 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction to Multi-layer test cases 13.1.7,13.1.8,13.1.9,13.1.10 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125759 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2064 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of RSRQ EUTRA-UTRAN 6.2.3.33 | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125761 | agreed | 2012-11-07 | TEI9_Test | CR | 2012-11-07 |
| 2065 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of RSRQ EUTRA-UTRAN 8.3.2.3a | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125762 | agreed | 2012-11-07 | TEI9_Test | CR | 2012-11-07 |
| 2066 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Update of test case 11.2.11 | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125763 | agreed | 2012-11-07 | TEI9_Test | CR | 2012-11-07 |
| 2067 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF WI-154 - Correction to IMS Emergency Call test case 11.2.2 | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125764 | agreed | 2012-11-07 | TEI9_Test | CR | 2012-11-07 |
| 2068 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF WI-151 - Correction to LTE FDD-TDD Inter-mode test case 8.3.1.13a | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125765 | agreed | 2012-11-07 | TEI9_Test | CR | 2012-11-07 |
| 2069 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Updates of e1xCSFB TC_13.1.17 | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125766 | agreed | 2012-11-07 | TEI9_Test | CR | 2012-11-07 |
| 2070 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of RSRQ EUTRA-UTRAN 6.2.3.3a | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125767 | agreed | 2012-11-07 | TEI9_Test | CR | 2012-11-07 |
| 2071 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of RSRQ EUTRA-UTRAN 6.2.3.4a | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125768 | agreed | 2012-11-07 | TEI9_Test | CR | 2012-11-07 |
| 2072 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of RSRQ EUTRA-UTRAN 6.2.3.5a | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-125769 | agreed | 2012-11-07 | TEI9_Test | CR | 2012-11-07 |
| 2073 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 1 - Update of test case 8.5.4.1 to Clarify FGI 33 - 36 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-125770 | agreed | 2012-11-07 | LTE-UEConTest_SIG | CR | 2012-11-07 |
| 2074 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Update PWS Rel-9 test case 18.1.1 | RP-58 | RP-121674 | approved | R5 | R5-57 | R5-125775 | agreed | 2012-11-07 | PWS-RAN_UEConTest | CR | 2012-11-07 |
| 2075 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction to PWS Rel-9 test case 18.1.3 | RP-58 | RP-121674 | approved | R5 | R5-57 | R5-125776 | agreed | 2012-11-07 | PWS-RAN_UEConTest | CR | 2012-11-07 |
| 2076 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Addition of New Rel-10 H(e)NB test case 6.3.10 | RP-58 | RP-121683 | approved | R5 | R5-57 | R5-125781 | agreed | 2012-11-08 | HNB_HENB_mob_enh-UEConTest_LTE | CR | 2012-11-08 |
| 2077 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Addition of new Rel-10 H(e)NB test case 6.3.12 | RP-58 | RP-121683 | approved | R5 | R5-57 | R5-125782 | agreed | 2012-11-08 | HNB_HENB_mob_enh-UEConTest_LTE | CR | 2012-11-08 |
| 2078 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Addition of New Rel-10 H(e)NB test case 6.3.11 | RP-58 | RP-121683 | approved | R5 | R5-57 | R5-125783 | agreed | 2012-11-08 | HNB_HENB_mob_enh-UEConTest_LTE | CR | 2012-11-08 |
| 2079 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Location stimulus clarification for MDT test cases | RP-58 | RP-121676 | approved | R5 | R5-57 | R5-125785 | agreed | 2012-11-08 | MDT_UMTSLTE-UEConTest | CR | 2012-11-08 |
| 2080 | - | F | Rel-11 | 11.0.0 | 11.1.0 | New E-UTRAN MDT test case 8.6.2.9 | RP-58 | RP-121676 | approved | R5 | R5-57 | R5-125786 | agreed | 2012-11-08 | MDT_UMTSLTE-UEConTest | CR | 2012-11-08 |
| 2081 | - | F | Rel-11 | 11.0.0 | 11.1.0 | New E-UTRAN MDT test case 8.6.4.7 | RP-58 | RP-121676 | approved | R5 | R5-57 | R5-125787 | agreed | 2012-11-08 | MDT_UMTSLTE-UEConTest | CR | 2012-11-08 |
| 2082 | - | F | Rel-11 | 11.0.0 | 11.1.0 | New E-UTRAN MDT test case 8.6.6.4 | RP-58 | RP-121676 | approved | R5 | R5-57 | R5-125788 | agreed | 2012-11-08 | MDT_UMTSLTE-UEConTest | CR | 2012-11-08 |
| 2083 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Update of MDT test cases 8.6.5.1 and 8.6.7.1 | RP-58 | RP-121676 | approved | R5 | R5-57 | R5-125789 | agreed | 2012-11-08 | MDT_UMTSLTE-UEConTest | CR | 2012-11-08 |
| 2084 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Addition of new TC 7.1.4.22: Correct HARQ process handling / UL MIMO | RP-58 | RP-121681 | approved | R5 | R5-57 | R5-125790 | agreed | 2012-11-08 | LTE_UL_MIMO-UEConTest | CR | 2012-11-08 |
| 2085 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Addition of new test case 13.4.3.7 | RP-58 | RP-121685 | approved | R5 | R5-57 | R5-125793 | agreed | 2012-11-08 | aSRVCC-UEConTest | CR | 2012-11-08 |
| 2086 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Addition of new test case 13.4.3.8 | RP-58 | RP-121685 | approved | R5 | R5-57 | R5-125794 | agreed | 2012-11-08 | aSRVCC-UEConTest | CR | 2012-11-08 |
| 2087 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Addition of new test case 13.4.3.9 | RP-58 | RP-121685 | approved | R5 | R5-57 | R5-125795 | agreed | 2012-11-08 | aSRVCC-UEConTest | CR | 2012-11-08 |
| 2088 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Addition of new test case 13.4.3.10 | RP-58 | RP-121685 | approved | R5 | R5-57 | R5-125796 | agreed | 2012-11-08 | aSRVCC-UEConTest | CR | 2012-11-08 |
| 2089 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Addition of new test case 13.4.3.11 | RP-58 | RP-121685 | approved | R5 | R5-57 | R5-125797 | agreed | 2012-11-08 | aSRVCC-UEConTest | CR | 2012-11-08 |
| 2090 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Addition of new test case 13.4.3.12 | RP-58 | RP-121685 | approved | R5 | R5-57 | R5-125798 | agreed | 2012-11-08 | aSRVCC-UEConTest | CR | 2012-11-08 |
| 2091 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Addition of new test case 13.4.3.13 | RP-58 | RP-121685 | approved | R5 | R5-57 | R5-125799 | agreed | 2012-11-08 | aSRVCC-UEConTest | CR | 2012-11-08 |
| 2092 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Add aSRVCC test case 13.4.3.14 | RP-58 | RP-121685 | approved | R5 | R5-57 | R5-126000 | agreed | 2012-11-08 | aSRVCC-UEConTest | CR | 2012-11-08 |
| 2093 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Add aSRVCC test case 13.4.3.16 | RP-58 | RP-121685 | approved | R5 | R5-57 | R5-126001 | agreed | 2012-11-08 | aSRVCC-UEConTest | CR | 2012-11-08 |
| 2094 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Splitting of CA test case 7.1.4.19 to Intra-band Contiguous CA and Inter-band CA | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-126006 | agreed | 2012-11-08 | LTE_CA-UEConTest | CR | 2012-11-08 |
| 2095 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Renumbering TC 7.1.4.23 and Splitting it to intra-band contiguous CA and inter-band CA | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-126007 | agreed | 2012-11-08 | LTE_CA-UEConTest | CR | 2012-11-08 |
| 2096 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority X - Update of Carrier Aggregation test case 8.4.2.7 | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-126008 | agreed | 2012-11-08 | LTE_CA-UEConTest | CR | 2012-11-08 |
| 2097 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority U1 - Update test case 6.2.1.3 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-126019 | agreed | 2012-11-08 | LTE-UEConTest_SIG | CR | 2012-11-08 |
| 2098 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 1 - Correction to EUTRA MAC test cases 7.1.7.1.1, 7.1.7.1.2, 7.1.7.1.3, 7.1.7.1.4, 7.1.7.1.5, 7.1.7.1.6 and 7.1.7.2.1 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-126021 | agreed | 2012-11-08 | LTE-UEConTest_SIG | CR | 2012-11-08 |
| 2099 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority g1: Correction to EUTRA to GERAN HO test case 8.4.3.3 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-126022 | agreed | 2012-11-08 | LTE-UEConTest_SIG | CR | 2012-11-08 |
| 2100 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority U1 - Correction to EMM test case 9.2.3.3.2 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-126023 | agreed | 2012-11-08 | LTE-UEConTest_SIG | CR | 2012-11-08 |
| 2101 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 3 - Correction to EMM test case 9.3.1.6 | RP-58 | RP-121660 | approved | R5 | R5-57 | R5-126024 | agreed | 2012-11-08 | LTE-UEConTest_SIG | CR | 2012-11-08 |
| 2102 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of RSRQ EUTRA 8.3.1.3a | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-126026 | agreed | 2012-11-08 | TEI9_Test | CR | 2012-11-08 |
| 2103 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of RSRQ EUTRA 6.1.2.3a | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-126028 | agreed | 2012-11-08 | TEI9_Test | CR | 2012-11-08 |
| 2104 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Correction of RSRQ EUTRA 6.1.2.17 | RP-58 | RP-121664 | approved | R5 | R5-57 | R5-126029 | agreed | 2012-11-08 | TEI9_Test | CR | 2012-11-08 |
| 2105 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Addition of new CA related test case: CA / Correct handling of MAC control information / Buffer Status / UL data arrive in the UE Tx buffer / Extended buffer size | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-126030 | agreed | 2012-11-08 | LTE_CA-UEConTest | CR | 2012-11-08 |
| 2106 | - | F | Rel-11 | 11.0.0 | 11.1.0 | GCF Priority 1 - Update of test case 8.5.4.1 to add Carrier Aggregation IEs | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-126070 | agreed | 2012-11-25 | LTE_CA-UEConTest | CR | 2012-11-25 |
| 2107 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Addition of New Carrier Aggregation test case for A5 | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-126071 | agreed | 2012-11-25 | LTE_CA-UEConTest | CR | 2012-11-25 |
| 2108 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Addition of New Carrier Aggregation test case for PCell Change SCell no Change | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-126073 | agreed | 2012-11-25 | LTE_CA-UEConTest | CR | 2012-11-25 |
| 2109 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Addition of New Carrier Aggregation test case for Event A6 | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-126074 | agreed | 2012-11-25 | LTE_CA-UEConTest | CR | 2012-11-25 |
| 2110 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Addition of New Carrier Aggregation test case for Event A1 and Event A2 | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-126075 | agreed | 2012-11-25 | LTE_CA-UEConTest | CR | 2012-11-25 |
| 2111 | - | F | Rel-11 | 11.0.0 | 11.1.0 | Addition of New Carrier Aggregation test case for RLF | RP-58 | RP-121677 | approved | R5 | R5-57 | R5-126076 | agreed | 2012-11-25 | LTE_CA-UEConTest | CR | 2012-11-25 |
| 2112 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority g1 - Correction to EUTRA Idle Mode test case 6.2.3.23 | GP-57 | GP-130005 | approved | R5 | - | GP-130005 | - | 2013-02-18 | TEI8_Test | - | 2013-02-25 |
| 2112 | - | F | Rel-11 | 11.1.1 | 11.2.0 | CR 36.523-1-2112 GCF Priority g1 - Correction to EUTRA Idle Mode test case 6.2.3.23 | GP-57 | GP-130005 | approved | G3new | G3new-57 | GP-130005 | revised | 2013-01-21 | TEI_Test | - | 2013-01-21 |
| 2112 | 1 | F | Rel-11 | 11.1.1 | 11.2.0 | CR 36.523-1-2112 GCF Priority g1 - Correction to EUTRA Idle Mode test case 6.2.3.23 | GP-57 | GP-130307 | approved | G3new | G3new-57 | GP-130307 | agreed | 2013-02-26 | TEI_Test | - | 2013-02-26 |
| 2115 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 4 - Correction to EMM tc 9.2.3.2.1c | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130079 | agreed | 2013-01-07 | TEI8_Test | CR | 2013-01-07 |
| 2116 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 3 - Correction to Multi-Layer test case 13.1.3 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130081 | agreed | 2013-01-07 | TEI8_Test | CR | 2013-01-07 |
| 2117 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update to test case 8.3.1.3a | RP-59 | RP-130145 | approved | R5 | R5-58 | R5-130088 | agreed | 2013-01-09 | TEI9_Test | CR | 2013-01-09 |
| 2118 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.1.24 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130159 | agreed | 2013-01-14 | TEI8_Test | CR | 2013-01-14 |
| 2119 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority u1 - Correction to EMM test case 9.2.3.2.1c | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130178 | agreed | 2013-01-15 | TEI8_Test | CR | 2013-01-15 |
| 2120 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 4 - Correction to RRC test case 8.1.2.6 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130207 | agreed | 2013-01-15 | TEI8_Test | CR | 2013-01-15 |
| 2121 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority X - Correction to RRC test case 8.2.4.14 | RP-59 | RP-130145 | approved | R5 | R5-58 | R5-130208 | agreed | 2013-01-15 | TEI9_Test | CR | 2013-01-15 |
| 2122 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority U1 - Correction to EMM test case 9.2.1.2.13 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130209 | agreed | 2013-01-15 | TEI8_Test | CR | 2013-01-15 |
| 2123 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority U1 - Correction to EMM test case 9.2.3.3.5 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130212 | agreed | 2013-01-15 | TEI8_Test | CR | 2013-01-15 |
| 2124 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority u1 - Update test case 13.4.3.2 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130312 | agreed | 2013-01-16 | TEI8_Test | CR | 2013-01-16 |
| 2125 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update test case 13.4.3.14 | RP-59 | RP-130160 | approved | R5 | R5-58 | R5-130313 | agreed | 2013-01-16 | aSRVCC-UEConTest | CR | 2013-01-16 |
| 2126 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update test case 13.4.3.16 | RP-59 | RP-130160 | approved | R5 | R5-58 | R5-130314 | agreed | 2013-01-16 | aSRVCC-UEConTest | CR | 2013-01-16 |
| 2127 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 3 - Update test case 9.2.3.1.27 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130316 | agreed | 2013-01-16 | TEI8_Test | CR | 2013-01-16 |
| 2128 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 3 - Update test case 9.2.3.1.28 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130317 | agreed | 2013-01-16 | TEI8_Test | CR | 2013-01-16 |
| 2129 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Correction of MDT test case 8.6.7.1 | RP-59 | RP-130154 | approved | R5 | R5-58 | R5-130340 | agreed | 2013-01-17 | MDT_UMTSLTE-UEConTest | CR | 2013-01-17 |
| 2130 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Addition of new MO SMS test cases 11.1.5 and 11.1.6 | RP-59 | RP-130145 | approved | R5 | R5-58 | R5-130341 | agreed | 2013-01-17 | TEI9_Test | CR | 2013-01-17 |
| 2131 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority g1 - Update to EUTRA Idle Mode test case 6.2.3.1 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130355 | agreed | 2013-01-17 | TEI8_Test | CR | 2013-01-17 |
| 2132 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 2 - Correction to EMM test case TC9.4.4 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130356 | agreed | 2013-01-17 | TEI8_Test | CR | 2013-01-17 |
| 2133 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 4 - Correction to Idle Mode test case TC6.2.3.19 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130357 | agreed | 2013-01-17 | TEI8_Test | CR | 2013-01-17 |
| 2134 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update to test cases 13.4.3.8, 13.4.3.9, 13.4.3.11 and 13.4.3.13 | RP-59 | RP-130160 | approved | R5 | R5-58 | R5-130369 | agreed | 2013-01-17 | aSRVCC-UEConTest | CR | 2013-01-17 |
| 2135 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority g1 - Update to Inter-RAT measurements test case 8.3.2.5 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130454 | agreed | 2013-01-18 | TEI8_Test | CR | 2013-01-18 |
| 2136 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority g2 - Update to Inter-RAT measurements test case 8.3.3.3 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130455 | agreed | 2013-01-18 | TEI8_Test | CR | 2013-01-18 |
| 2137 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Correction to test case 11.1.1 & 11.1.4 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130527 | agreed | 2013-01-18 | TEI8_Test | CR | 2013-01-18 |
| 2138 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Updating of EMM cause of test case 11.2.6 and 11.2.7 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130539 | agreed | 2013-01-18 | TEI8_Test | CR | 2013-01-18 |
| 2139 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 1 - Corrections to MAC TC 7.1.4.10 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130558 | agreed | 2013-01-18 | TEI8_Test | CR | 2013-01-18 |
| 2140 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Corrections to TC 13.4.3.3 ""Inter-system mobility / E-UTRA voice to GSM CS voice / SRVCC"" | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130560 | agreed | 2013-01-18 | TEI8_Test | CR | 2013-01-18 |
| 2141 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Correction to Table 13.4.3.2.3.3-6: HANDOVER TO UTRAN COMMAND (step 32, Table 13.4.3.2.3.3-5) to include new handover condition defined in TS 36.508 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130562 | agreed | 2013-01-18 | TEI8_Test | CR | 2013-01-18 |
| 2142 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Correction to MDT test case 8.6.3.1 | RP-59 | RP-130154 | approved | R5 | R5-58 | R5-130586 | agreed | 2013-01-18 | MDT_UMTSLTE-UEConTest | CR | 2013-01-18 |
| 2143 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Correction to preamble for TC 6.2.3.4a | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130624 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2144 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority X - Correction to RSRQ test case 6.1.2.17 | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130625 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2145 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Correction to RSRQ test case 6.1.2.18 | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130626 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2146 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Correction to RSQR test case 6.2.3.3a | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130627 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2147 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority u1 - Correction to EUTRA RRC Test Case 8.4.2.2 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130628 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2148 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority u2 - Correction to EUTRA RRC Test Case 8.4.2.4 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130629 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2149 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 8.4.5.4 - Addition of C2K checking parameters | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130630 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2150 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 8.4.7.3 - Addition of C2K checking parameters | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130631 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2151 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 8.4.7.4 - Addition of C2K checking parameters | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130632 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2152 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 8.4.7.5 - Addition of C2K checking parameters | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130633 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2153 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 8.4.7.6 - Addition of C2K checking parameters | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130634 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2154 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 8.4.7.7 - Addition of C2K checking parameters | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130635 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2155 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 8.4.7.8 - Addition of C2K checking parameters | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130636 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2156 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 8.4.7.9 - Addition of C2K checking parameters | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130637 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2158 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority c1 - Correction to title of EUTRA-1xRTT test cases 8.4.7.3 and 8.4.7.4 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130639 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2159 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority g1 - Correction to EUTRA RRC Test Cases 8.4.3.2 and 8.4.3.3 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130641 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2160 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 4 - Correction to EMM tc 9.2.3.1.17 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130642 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2161 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 3 - Update test case 9.3.1.3 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130778 | agreed | 2013-02-05 | TEI8_Test | CR | 2013-02-05 |
| 2162 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 2 - Correction to EMM test case 9.2.3.1.4 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130644 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2163 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority U1 - Correction to EMM test case 9.2.3.2.13 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130645 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2164 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority U1 - Correction to EMM test case 9.2.1.2.5 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130646 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2165 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 4 - Correction to EMM tc 9.2.3.3.5a | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130647 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2166 | - | F | Rel-11 | 11.1.1 | 11.2.0 | New LTE Rel-9 TC for UE rejection of NAS security mode command with EIA0 | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130649 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2167 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 1 - Update test case 9.1.3.1 to test not null and null ciphering algorithms | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130650 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2168 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Correction to GCF P3 EMM test case 9.2.2.1.8 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130651 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2169 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 11.2.8 - Addition of C2K checking parameters | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130652 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2170 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 3 - Correction to Multi-layer test cases 13.1.x | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130653 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2171 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority u1 - Update test case 13.1.2 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130654 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2172 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority u1 - Update test case 13.1.2a | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130655 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2173 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority u1 - Update test case 13.1.5 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130656 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2174 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority g1 - Update test case 13.1.9 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130657 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2175 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 13.1.17 - Addition of C2K checking parameters | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130658 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2176 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 13.1.18 - Addition of C2K checking parameters | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130659 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2177 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 13.4.4.1 - Addition of C2K checking parameters | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130660 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2178 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 13.4.4.2 - Addition of C2K checking parameters | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130661 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2179 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 13.4.4.4 - Addition of C2K checking parameters | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130662 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2180 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 13.4.4.5 - Addition of C2K checking parameters | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130663 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2181 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of 13.4.4.3 - C2K messages contents for checking parameters | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130664 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2182 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 3 - Correction to EMM test case 9.1.5.1 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130665 | agreed | 2013-01-29 | TEI8_Test | CR | 2013-01-29 |
| 2183 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Addition of new Inter-RAT measurement test case for event B1 | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130669 | agreed | 2013-01-29 | TEI9_Test | CR | 2013-01-29 |
| 2184 | - | F | Rel-11 | 11.1.1 | 11.2.0 | New aSRVCC TC 13_4_3_15 MO call voice-data SRVCC HO cancelled | RP-59 | RP-130160 | approved | R5 | R5-58 | R5-130697 | agreed | 2013-01-30 | aSRVCC-UEConTest | CR | 2013-01-30 |
| 2185 | - | F | Rel-11 | 11.1.1 | 11.2.0 | New aSRVCC TC 13_4_3_17 MT call voice-data SRVCC HO cancelled | RP-59 | RP-130160 | approved | R5 | R5-58 | R5-130698 | agreed | 2013-01-30 | aSRVCC-UEConTest | CR | 2013-01-30 |
| 2186 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of eICIC test case 8.3.1.20 | RP-59 | RP-130157 | approved | R5 | R5-58 | R5-130699 | agreed | 2013-01-30 | eICIC_LTE-UEConTest | CR | 2013-01-30 |
| 2187 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of Carrier Aggregation test case 8.2.4.19.1 | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130701 | agreed | 2013-01-30 | LTE_CA-UEConTest | CR | 2013-01-30 |
| 2188 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Editorial Corrections to Carrier Aggregation Radio Resource Reconfiguration test cases | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130703 | agreed | 2013-01-30 | LTE_CA-UEConTest | CR | 2013-01-30 |
| 2189 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Modification on CA radio resource reconfiguration related test cases | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130704 | agreed | 2013-01-30 | LTE_CA-UEConTest | CR | 2013-01-30 |
| 2190 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Editorial Corrections to Carrier Aggregation Handover Test cases | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130705 | agreed | 2013-01-30 | LTE_CA-UEConTest | CR | 2013-01-30 |
| 2191 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Modification of CA TC 8.2.4.17 and 8.2.4.18 | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130707 | agreed | 2013-01-30 | LTE_CA-UEConTest | CR | 2013-01-30 |
| 2192 | - | F | Rel-11 | 11.1.1 | 11.2.0 | New NIMTC test case 6.1.1.7 PLMN selection / Periodic reselection / MinimumPeriodicSearchTimer | RP-59 | RP-130159 | approved | R5 | R5-58 | R5-130720 | agreed | 2013-01-31 | NIMTC-UEConTest | CR | 2013-01-31 |
| 2193 | - | F | Rel-11 | 11.1.1 | 11.2.0 | New NIMTC test case 9.2.1.1.27 Attach / Abnormal case / Network reject with Extended Wait Timer | RP-59 | RP-130159 | approved | R5 | R5-58 | R5-130722 | agreed | 2013-01-31 | NIMTC-UEConTest | CR | 2013-01-31 |
| 2194 | - | F | Rel-11 | 11.1.1 | 11.2.0 | New NIMTC test case 10.5.4 UE requested PDN connectivity not accepted / Network reject with Extended Wait Timer | RP-59 | RP-130159 | approved | R5 | R5-58 | R5-130723 | agreed | 2013-01-31 | NIMTC-UEConTest | CR | 2013-01-31 |
| 2195 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Addition of new MDT test case 8.6.3.2 | RP-59 | RP-130154 | approved | R5 | R5-58 | R5-130729 | agreed | 2013-01-31 | MDT_UMTSLTE-UEConTest | CR | 2013-01-31 |
| 2196 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Addition of New MDT test case for Logged MDT | RP-59 | RP-130154 | approved | R5 | R5-58 | R5-130730 | agreed | 2013-01-31 | MDT_UMTSLTE-UEConTest | CR | 2013-01-31 |
| 2198 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Addition of new test case 8.3.1.bb | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130733 | agreed | 2013-01-31 | TEI9_Test | CR | 2013-01-31 |
| 2199 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Addition of new test case 8.3.1.cc | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130734 | agreed | 2013-01-31 | TEI9_Test | CR | 2013-01-31 |
| 2200 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Addition of new test case 8.3.1.dd | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130735 | agreed | 2013-01-31 | TEI9_Test | CR | 2013-01-31 |
| 2202 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 3 - Corrections to EMM TC 9.2.1.1.12, 9.2.3.1.12, 9.2.3.1.18 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130739 | agreed | 2013-01-31 | TEI8_Test | CR | 2013-01-31 |
| 2203 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority U1 - Correction to EMM test case 9.2.1.2.8 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130740 | agreed | 2013-01-31 | TEI8_Test | CR | 2013-01-31 |
| 2204 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority g1 - Update test case 13.1.8 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130741 | agreed | 2013-01-31 | TEI8_Test | CR | 2013-01-31 |
| 2205 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority g1 - Update test case 13.1.12 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130742 | agreed | 2013-01-31 | TEI8_Test | CR | 2013-01-31 |
| 2206 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority i1 - Correction to LTE FDD-TDD Inter-mode test case 8.3.1.15a | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130746 | agreed | 2013-01-31 | TEI9_test | CR | 2013-01-31 |
| 2207 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority i1 - Correction to LTE FDD-TDD Inter-mode test case 8.3.1.16a | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130747 | agreed | 2013-01-31 | TEI9_Test | CR | 2013-01-31 |
| 2208 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 1 - Correction to EUTRA RRC test case 8.5.4.1 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130748 | agreed | 2013-01-31 | TEI8_Test | CR | 2013-01-31 |
| 2209 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Modification of CA TC 8.2.4.19 | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130752 | agreed | 2013-01-31 | LTE_CA-UEConTest | CR | 2013-01-31 |
| 2210 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Modification of CA TC 8.2.4.20 | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130753 | agreed | 2013-01-31 | LTE_CA-UEConTest | CR | 2013-01-31 |
| 2211 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Modification of CA TC 8.2.4.21 | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130754 | agreed | 2013-01-31 | LTE_CA-UEConTest | CR | 2013-01-31 |
| 2212 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Modification of CA TCs 8.3.1.17 and 8.3.1.18 | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130755 | agreed | 2013-01-31 | LTE_CA-UEConTest | CR | 2013-01-31 |
| 2213 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Modification of CA TC 8.3.1.22 | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130756 | agreed | 2013-01-31 | LTE_CA-UEConTest | CR | 2013-01-31 |
| 2214 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Modification of CA TC 8.4.2.7 | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130757 | agreed | 2013-01-31 | LTE_CA-UEConTest | CR | 2013-01-31 |
| 2215 | - | F | Rel-11 | 11.1.1 | 11.2.0 | Update of Carrier Aggregation test case 8.2.4.20.1 | RP-59 | RP-130167 | approved | R5 | R5-58 | R5-130758 | agreed | 2013-01-31 | LTE_CA-UEConTest | CR | 2013-01-31 |
| 2216 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority 3 – Corrections to EMM tcs 9.2.3.2.1a and 9.2.3.3.4 | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130762 | agreed | 2013-01-31 | TEI9_Test | CR | 2013-01-31 |
| 2217 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority ee1 - Corrections to Emgerency Call over IMS test cases | RP-59 | RP-130146 | approved | R5 | R5-58 | R5-130784 | agreed | 2013-02-19 | TEI9_Test | CR | 2013-02-19 |
| 2218 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority c1 - Correction to EUTRA-HRPD test case 8.3.2.8 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130785 | agreed | 2013-02-19 | TEI8_Test | CR | 2013-02-19 |
| 2219 | - | F | Rel-11 | 11.1.1 | 11.2.0 | GCF Priority c1 - Correction to EUTRA-1xRTT test case 8.3.2.10 | RP-59 | RP-130144 | approved | R5 | R5-58 | R5-130786 | agreed | 2013-02-19 | TEI8_Test | CR | 2013-02-19 |
| 2220 | - | F | Rel-11 | 11.2.0 | 11.3.0 | CR 36.523-1-2220 GCF Priority 1 - Correction to EUTRA Idle Mode Test Case 6.2.3.15 | GP-58 | GP-130357 | approved | G3new | G3new-58 | GP-130357 | agreed | 2013-04-18 | TEI10_Test | - | 2013-04-18 |
| 2221 | - | F | Rel-11 | 11.2.0 | 11.3.0 | CR 36.523-1-2221 GCF priority g1 - Correction to Idle Mode test case 6.2.1.6 | GP-58 | GP-130358 | approved | G3new | G3new-58 | GP-130358 | agreed | 2013-04-18 | TEI10_Test | - | 2013-04-18 |
| 2222 | - | F | Rel-11 | 11.2.0 | 11.3.0 | CR 36.523-1-2222 Removal of TC 6.2.3.22 | GP-58 | GP-130371 | approved | G3new | G3new-58 | GP-130371 | agreed | 2013-04-18 | LTE-UEConTest_SIG | - | 2013-04-18 |
| 2224 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update of CDMA2000 specification references: Clause 2 of TS 36.523-1 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131066 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2225 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update of CDMA2000 specification references for UE Capability Transfer | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131071 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2226 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update of CDMA2000 specification references for Inter-RAT Handover | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131072 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2227 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update of CDMA2000 specification references of Inter-system session management | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131073 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2228 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update of of LTE MDT test case 8.6.3.3 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131077 | agreed | 2013-05-13 | TEI10_Test | CR | 2013-05-13 |
| 2229 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Editorial Remove square bracket in TC 8.3.2.1 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131087 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2230 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Editorial Remove square bracket and FFS in TCs 13.4.2.2, 13.4.3.3, 13.4.3.5 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131088 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2231 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Editorial TC 12.1.1 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131091 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2232 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction of description on 36523-3 | RP-60 | RP-130635 | approved | R5 | R5-59 | R5-131128 | agreed | 2013-05-13 | TEI11_Test | CR | 2013-05-13 |
| 2233 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority X - Correction to Idle Mode test case 6.3.11 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131142 | agreed | 2013-05-13 | TEI10_Test | CR | 2013-05-13 |
| 2234 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority X - Correction to Idle Mode test case 6.3.10 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131143 | agreed | 2013-05-13 | TEI10_Test | CR | 2013-05-13 |
| 2235 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update to test function Update UE Location Information | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131169 | agreed | 2013-05-13 | TEI10_Test | CR | 2013-05-13 |
| 2236 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority u1 - Update to EMM test case 9.2.3.2.9 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131215 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2237 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority 3 - Correction to EUTRA MAC test case 7.1.4.2 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131255 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2238 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.1.3 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131294 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2239 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.1.7 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131295 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2240 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.1.10 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131296 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2241 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.1.15 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131298 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2242 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.1.11 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131299 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2243 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.1.13 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131300 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2244 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.1.4 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131301 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2245 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.1.16 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131302 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2246 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to RSRQ test case 8.3.2.3a | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131314 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2247 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EUTRA-HRPD test case 8.3.3.4 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131316 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2248 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EMM test case 9.2.1.2.8 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131317 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2249 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EMM test case 9.2.2.1.8 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131318 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2250 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to CA test cases 8.3.1.18.1 and 8.3.1.18.2 | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-131324 | agreed | 2013-05-13 | LTE_CA-UEConTest | CR | 2013-05-13 |
| 2251 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.2.1 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131366 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2252 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.3.1 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131367 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2253 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.3.2 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131368 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2254 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.3.7 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131369 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2255 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.3.8 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131370 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2256 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.3.9 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131371 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2257 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.3.10 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131372 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2258 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.3.11 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131373 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2259 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.3.12 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131375 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2260 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.3.13 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131376 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2261 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.3.14 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131377 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2262 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 13.4.3.16 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131378 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2263 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to test case 8.3.1.26 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131441 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2264 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update IMS emergency call pre-test condition | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131470 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2265 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Adding a new TC 9.2.3.1.5a for NIMTC conformance testing | RP-60 | RP-130624 | approved | R5 | R5-59 | R5-131480 | agreed | 2013-05-13 | NIMTC-UEConTest | CR | 2013-05-13 |
| 2266 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Splitting TC 11.2.8 in two TCs one for UTRA/GERAN and one for 1xRTT | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131485 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2267 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Editorial update of test case 13.1.5 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131504 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2268 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update of 8.4.7.10 - Addition of C2K checking parameters | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131557 | agreed | 2013-05-13 | TEI9_Test | CR | 2013-05-13 |
| 2269 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case for PLMN change in eMDT | RP-60 | RP-130629 | approved | R5 | R5-59 | R5-131626 | agreed | 2013-05-13 | eMDT_UMTSLTE-UEConTest | CR | 2013-05-13 |
| 2270 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case for EventB2 reporting in eMDT | RP-60 | RP-130629 | approved | R5 | R5-59 | R5-131633 | agreed | 2013-05-13 | eMDT_UMTSLTE-UEConTest | CR | 2013-05-13 |
| 2271 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case for RACH reporting in eMDT | RP-60 | RP-130629 | approved | R5 | R5-59 | R5-131635 | agreed | 2013-05-13 | eMDT_UMTSLTE-UEConTest | CR | 2013-05-13 |
| 2272 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EMM Test Case 9.2.3.1.19 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131675 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2273 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority 2 / 3 - Editorial corrections to EMM test cases 9.2.1.1.1a and 9.2.3.1.17 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131693 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2274 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority 2 - Corrections to SMS over SGs test cases | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131708 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2275 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Editorial correction to TC 9.2.1.1.1 | RP-60 | RP-130635 | approved | R5 | R5-59 | R5-131713 | agreed | 2013-05-13 | TEI11_Test | CR | 2013-05-13 |
| 2276 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to LTE-A test case 8.2.2.5.1/8.2.2.5.2 | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-131733 | agreed | 2013-05-13 | LTE_CA-UEConTest | CR | 2013-05-13 |
| 2277 | - | F | Rel-11 | 11.2.0 | 11.3.0 | CSG reselection requirements correction in TC 6.3.1 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131810 | agreed | 2013-05-22 | TEI8_Test | CR | 2013-05-22 |
| 2278 | - | F | Rel-11 | 11.2.0 | 11.3.0 | CSG reselection requirements correction in TC 6.3.3 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131811 | agreed | 2013-05-22 | TEI8_Test | CR | 2013-05-22 |
| 2279 | - | F | Rel-11 | 11.2.0 | 11.3.0 | CSG reselection requirements correction in TC 6.3.4 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131812 | agreed | 2013-05-22 | TEI8_Test | CR | 2013-05-22 |
| 2280 | - | F | Rel-11 | 11.2.0 | 11.3.0 | CSG reselection requirements correction in TC 6.3.7 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131813 | agreed | 2013-05-22 | TEI8_Test | CR | 2013-05-22 |
| 2281 | - | F | Rel-11 | 11.2.0 | 11.3.0 | CSG reselection requirements correction in TC 6.3.8 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131814 | agreed | 2013-05-22 | TEI8_Test | CR | 2013-05-22 |
| 2282 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EUTRA Idle mode Test case 6.1.2.13 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131815 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2283 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EUTRA Idle mode test case 6.2.3.1a | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131816 | agreed | 2013-05-23 | TEI9_Test | CR | 2013-05-23 |
| 2284 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to MAC test case 7.1.1.2 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131817 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2285 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update of test case 8.5.4.1 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131818 | agreed | 2013-05-22 | TEI8_Test | CR | 2013-05-22 |
| 2286 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EUTRA-1xRTT test case 8.3.2.10 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131819 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2287 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EUTRA-HRPD test case 8.3.2.8 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131820 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2288 | - | F | Rel-11 | 11.2.0 | 11.3.0 | New TC 8.3.4.5 Inter-frequency E-UTRAN FDD - FDD / CSG Proximity Indication | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131821 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2289 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case 8.3.1.23 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131822 | agreed | 2013-05-23 | TEI9_Test | CR | 2013-05-23 |
| 2290 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case 8.3.1.27 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131823 | agreed | 2013-05-23 | TEI9_Test | CR | 2013-05-23 |
| 2291 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority 1 - Correction to EUTRA RRC Test Case 8.3.2.2. | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131824 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2292 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority x - Correction to EUTRA test case 8.3.1.13 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131825 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2293 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Editorial Remove square bracket in TC 8.4.3.2 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131826 | agreed | 2013-05-22 | TEI8_Test | CR | 2013-05-22 |
| 2294 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update to test case 9.2.1.2.3 and 9.2.3.2.3 | RP-60 | RP-130635 | approved | R5 | R5-59 | R5-131827 | agreed | 2013-05-23 | TEI11_Test | CR | 2013-05-23 |
| 2295 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority 3 - Corrections to EMM TC 9.2.1.1.12, 9.2.3.1.12, 9.2.3.1.18 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131828 | agreed | 2013-05-22 | TEI8_Test | CR | 2013-05-22 |
| 2296 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EMM test case 9.2.3.2.1a | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131829 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2297 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EMM test case 9.2.3.3.2 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131830 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2298 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority 2 - Correction to EUTRA EMM Test Case 9.2.3.2.3 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131831 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2299 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority 2: Extending the scope of TC 9.1.4.2 to verify IMEISV | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131832 | agreed | 2013-05-22 | TEI8_Test | CR | 2013-05-22 |
| 2300 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF G2: Corrections to EMM test case 9.2.3.4.1 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131833 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2301 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority U1: Correction to EMM test case 9.2.3.3.4 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131834 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2302 | - | F | Rel-11 | 11.2.0 | 11.3.0 | 9.2.3.1.8 'Load Balancing TAU' does not test the main requirement | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131835 | agreed | 2013-06-05 | TEI8_Test | CR | 2013-06-05 |
| 2303 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EMM test case 9.1.3.3 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131836 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2304 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update to test case 11.2.6 | RP-60 | RP-130635 | approved | R5 | R5-59 | R5-131837 | agreed | 2013-05-22 | TEI11_Test | CR | 2013-05-22 |
| 2305 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update test case 11.2.11 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131838 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2306 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update of test case 8.3.3.5 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131839 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2307 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EUTRA Multi-layer Test Case 13.3.1.3 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131840 | agreed | 2013-05-23 | TEI9_Test | CR | 2013-05-23 |
| 2308 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to eMBMS test case 17.1.1 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131841 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2309 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to eMBMS test case 17.1.2 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131842 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2310 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to eMBMS test case 17.1.3 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131843 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2311 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to eMBMS test case 17.1.4 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131844 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2312 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to eMBMS test case 17.1.5 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131845 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2313 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to eMBMS test case 17.2.1 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131846 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2314 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to eMBMS test case 17.2.2 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131847 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2315 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to eMBMS test case 17.2.3 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131848 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2316 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to eMBMS test case 17.2.4 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131849 | agreed | 2013-05-22 | TEI9_Test | CR | 2013-05-22 |
| 2317 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to PWS(CMAS) test case 18.1.3 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-131850 | agreed | 2013-05-23 | TEI9_Test | CR | 2013-05-23 |
| 2318 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to eMBMS test case 17.3.1 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131851 | agreed | 2013-05-22 | TEI10_Test | CR | 2013-05-22 |
| 2319 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Corrections to eMBMS test case 17.3.2 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131852 | agreed | 2013-05-22 | TEI10_Test | CR | 2013-05-22 |
| 2320 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to E-UTRA MDT test case 8.6.2.1 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131853 | agreed | 2013-05-22 | TEI10_Test | CR | 2013-05-22 |
| 2321 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to E-UTRA MDT test case 8.6.2.2 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131854 | agreed | 2013-05-22 | TEI10_Test | CR | 2013-05-22 |
| 2322 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to E-UTRA MDT test case 8.6.2.3 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131855 | agreed | 2013-05-22 | TEI10_Test | CR | 2013-05-22 |
| 2323 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to E-UTRA MDT test case 8.6.2.4 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131856 | agreed | 2013-05-22 | TEI10_Test | CR | 2013-05-22 |
| 2324 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to E-UTRA MDT test case 8.6.2.5 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131857 | agreed | 2013-05-22 | TEI10_Test | CR | 2013-05-22 |
| 2325 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to E-UTRA MDT test case 8.6.2.8 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131858 | agreed | 2013-05-22 | TEI10_Test | CR | 2013-05-22 |
| 2326 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to E-UTRA MDT test case 8.6.3.1 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131859 | agreed | 2013-05-22 | TEI10_Test | CR | 2013-05-22 |
| 2327 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to E-UTRA MDT test case 8.6.3.2 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131860 | agreed | 2013-05-22 | TEI10_Test | CR | 2013-05-22 |
| 2328 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to E-UTRA MDT test case 8.6.3.3 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-131861 | agreed | 2013-05-22 | TEI10_Test | CR | 2013-05-22 |
| 2330 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to MAC LTE CA test case 7.1.3.11 | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-131879 | agreed | 2013-05-23 | LTE_CA-UEConTest | CR | 2013-05-23 |
| 2331 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to MAC LTE CA test case 7.1.4.18 | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-131880 | agreed | 2013-05-23 | LTE_CA-UEConTest | CR | 2013-05-23 |
| 2332 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to MAC LTE CA test case 7.1.9.1 | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-131881 | agreed | 2013-05-23 | LTE_CA-UEConTest | CR | 2013-05-23 |
| 2333 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to MAC LTE CA test case 7.1.4.20.1 | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-131882 | agreed | 2013-05-23 | LTE_CA-UEConTest | CR | 2013-05-23 |
| 2334 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to MAC LTE CA test case 7.1.4.19.1 | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-131883 | agreed | 2013-05-23 | LTE_CA-UEConTest | CR | 2013-05-23 |
| 2335 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update of eICIC test case 8.3.1.20 | RP-60 | RP-130622 | approved | R5 | R5-59 | R5-131886 | agreed | 2013-05-23 | eICIC_LTE-UEConTest | CR | 2013-05-23 |
| 2336 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Adding a new TC 9.2.1.1.2a for NIMTC conformance testing | RP-60 | RP-130624 | approved | R5 | R5-59 | R5-131892 | agreed | 2013-05-22 | NIMTC-UEConTest | CR | 2013-05-22 |
| 2337 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case for TDD additional special subframe configuration with CRS based transmission scheme | RP-60 | RP-130633 | approved | R5 | R5-59 | R5-131894 | agreed | 2013-05-23 | LTE_TDD_add_subframe-UEConTest | CR | 2013-05-23 |
| 2338 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case for TDD additional special subframe configuration with UE-specific reference signals based transmission scheme | RP-60 | RP-130633 | approved | R5 | R5-59 | R5-131895 | agreed | 2013-05-23 | LTE_TDD_add_subframe-UEConTest | CR | 2013-05-23 |
| 2339 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EUTRA EMM Test Case 9.2.3.2.1b | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131898 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2340 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EUTRA EMM Test Case 9.2.1.2.1b | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131899 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2341 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update to test case 8.2.4.17.2 | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-132003 | agreed | 2013-05-24 | LTE_CA-UEConTest | CR | 2013-05-24 |
| 2342 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to RRC test case 8.2.4.14 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-132005 | agreed | 2013-05-23 | TEI9_Test | CR | 2013-05-23 |
| 2343 | - | F | Rel-11 | 11.2.0 | 11.3.0 | New Carrier Aggregation test case on MIMO | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-132018 | agreed | 2013-05-23 | LTE_CA-UEConTest | CR | 2013-05-23 |
| 2344 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to usage of cells in Inter-band LTE CA test case 8.2.4.19.2 | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-132019 | agreed | 2013-05-24 | LTE_CA-UEConTest | CR | 2013-05-24 |
| 2345 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to usage of cells in Inter-band LTE CA test case 8.2.4.20.2 | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-132020 | agreed | 2013-05-24 | LTE_CA-UEConTest | CR | 2013-05-24 |
| 2346 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to usage of cells in Inter-band LTE CA test case 8.2.4.21.2 | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-132021 | agreed | 2013-05-24 | LTE_CA-UEConTest | CR | 2013-05-24 |
| 2347 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of SCell configuration type to CA test cases | RP-60 | RP-130636 | approved | R5 | R5-59 | R5-132022 | agreed | 2013-05-23 | LTE_CA-UEConTest | CR | 2013-05-23 |
| 2348 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to eICIC test case 8.3.1.19 | RP-60 | RP-130622 | approved | R5 | R5-59 | R5-132024 | agreed | 2013-05-24 | eICIC_LTE-UEConTest | CR | 2013-05-24 |
| 2349 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to idle mode test case 6.1.2.17 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-132032 | agreed | 2013-05-23 | TEI9_Test | CR | 2013-05-23 |
| 2350 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to LTE FDD-TDD Inter-mode test case 8.1.3.12a | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-132033 | agreed | 2013-05-23 | TEI9_Test | CR | 2013-05-23 |
| 2351 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority 1 - Update of EUTRA RRC test case 8.5.4.1 to handle Rel-11 IEs | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-132034 | agreed | 2013-05-23 | TEI8_Test | CR | 2013-05-23 |
| 2352 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to EMM test case 9.2.3.3.4 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-132035 | agreed | 2013-05-24 | TEI8_Test | CR | 2013-05-24 |
| 2353 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority 2 - Corrections to ESM test case 10.3.1 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-132042 | agreed | 2013-05-24 | TEI8_Test | CR | 2013-05-24 |
| 2354 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority 2 - Corrections to ESM test case 10.9.1 | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-132043 | agreed | 2013-05-24 | TEI8_Test | CR | 2013-05-24 |
| 2355 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case for T300 expiry in eMDT | RP-60 | RP-130629 | approved | R5 | R5-59 | R5-132044 | agreed | 2013-05-24 | eMDT_UMTSLTE-UEConTest | CR | 2013-05-24 |
| 2356 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case about TAC and PLMN id in eMDT | RP-60 | RP-130629 | approved | R5 | R5-59 | R5-132045 | agreed | 2013-05-24 | eMDT_UMTSLTE-UEConTest | CR | 2013-05-24 |
| 2357 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case about PLMN list in eMDT | RP-60 | RP-130629 | approved | R5 | R5-59 | R5-132046 | agreed | 2013-05-24 | eMDT_UMTSLTE-UEConTest | CR | 2013-05-24 |
| 2358 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case about Location information for eMDT | RP-60 | RP-130629 | approved | R5 | R5-59 | R5-132047 | agreed | 2013-05-24 | eMDT_UMTSLTE-UEConTest | CR | 2013-05-24 |
| 2359 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case for inter-frequency measurements report in eMDT | RP-60 | RP-130629 | approved | R5 | R5-59 | R5-132048 | agreed | 2013-05-24 | eMDT_UMTSLTE-UEConTest | CR | 2013-05-24 |
| 2360 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case for inter-RAT measurements report in eMDT | RP-60 | RP-130629 | approved | R5 | R5-59 | R5-132049 | agreed | 2013-05-24 | eMDT_UMTSLTE-UEConTest | CR | 2013-05-24 |
| 2361 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case for reporitng reestablishment in eMDT | RP-60 | RP-130629 | approved | R5 | R5-59 | R5-132054 | agreed | 2013-05-24 | eMDT_UMTSLTE-UEConTest | CR | 2013-05-24 |
| 2362 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Addition of new test case for EventA2 reporting in eMDT | RP-60 | RP-130629 | approved | R5 | R5-59 | R5-132056 | agreed | 2013-05-24 | eMDT_UMTSLTE-UEConTest | CR | 2013-05-24 |
| 2363 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority X - Correction to Idle Mode test case 6.3.12 | RP-60 | RP-130626 | approved | R5 | R5-59 | R5-132058 | agreed | 2013-05-23 | TEI10_Test | CR | 2013-05-23 |
| 2364 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority ee1 - Update of Emergency Call over IMS test cases | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-132067 | agreed | 2013-05-24 | TEI9_Test | CR | 2013-05-24 |
| 2365 | - | F | Rel-11 | 11.2.0 | 11.3.0 | GCF Priority i1 - Correction to LTE FDD-TDD Inter-mode test case 6.1.1.4a | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-132069 | agreed | 2013-05-24 | TEI8_Test | CR | 2013-05-24 |
| 2366 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Update of TC 11.2.7 to consider document C1-131732 | RP-60 | RP-130612 | approved | R5 | R5-59 | R5-132084 | agreed | 2013-06-05 | TEI9_Test | CR | 2013-06-05 |
| 2367 | - | F | Rel-11 | 11.2.0 | 11.3.0 | Correction to generic MO CSFB procedures | RP-60 | RP-130610 | approved | R5 | R5-59 | R5-131496 | agreed | 2013-05-13 | TEI8_Test | CR | 2013-05-13 |
| 2368 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to CA test case 8.2.4.21.2 | RP-61 | RP-131111 | approved | R5 | R5-60 | R5-133081 | agreed | 2013-07-04 | LTE_CA-UEConTest | CR | 2013-07-04 |
| 2369 | - | F | Rel-11 | 11.3.0 | 11.4.0 | GCF Priority 3 - Correction to EMM test case 9.2.1.1.11 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133082 | agreed | 2013-07-08 | TEI8_Test | CR | 2013-07-08 |
| 2370 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to EMM test case 9.2.3.4.1 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133093 | agreed | 2013-07-09 | TEI8_Test | CR | 2013-07-09 |
| 2371 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Clarification for handling of differences between conformance requirements in different releases of core specifications | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133114 | agreed | 2013-07-11 | TEI8_Test | CR | 2013-07-11 |
| 2372 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to CA Test Case 8.2.2.5.1 and 8.2.2.5.2 | RP-61 | RP-131111 | approved | R5 | R5-60 | R5-133128 | agreed | 2013-07-12 | LTE_CA-UEConTest | CR | 2013-07-12 |
| 2373 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to EMM test case 9.2.1.1.1b | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133145 | agreed | 2013-07-18 | TEI8_Test | CR | 2013-07-18 |
| 2374 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Editorial update of TC 9.2.3.3.2 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133167 | agreed | 2013-07-19 | TEI8_Test | CR | 2013-07-19 |
| 2375 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Update of text for Update UE Location Information | RP-61 | RP-131114 | approved | R5 | R5-60 | R5-133184 | agreed | 2013-07-22 | TEI10_Test | CR | 2013-07-22 |
| 2376 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new eMDT test case 8.6.7.4 | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133322 | agreed | 2013-07-25 | eMDT_UMTSLTE-UEConTest | CR | 2013-07-25 |
| 2377 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new eMDT test case 8.6.4.8 | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133323 | agreed | 2013-07-25 | eMDT_UMTSLTE-UEConTest | CR | 2013-07-25 |
| 2378 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new eMDT test case 8.6.4.9 | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133324 | agreed | 2013-07-25 | eMDT_UMTSLTE-UEConTest | CR | 2013-07-25 |
| 2379 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new eMDT test case 8.6.4.10 | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133325 | agreed | 2013-07-25 | eMDT_UMTSLTE-UEConTest | CR | 2013-07-25 |
| 2380 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new eMDT test case 8.6.8.2 | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133326 | agreed | 2013-07-25 | eMDT_UMTSLTE-UEConTest | CR | 2013-07-25 |
| 2381 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new eMDT test case 8.6.8.5 | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133327 | agreed | 2013-07-25 | eMDT_UMTSLTE-UEConTest | CR | 2013-07-25 |
| 2382 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new eMDT test case 8.6.9.1 | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133328 | agreed | 2013-07-25 | eMDT_UMTSLTE-UEConTest | CR | 2013-07-25 |
| 2383 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to test case 8.4.3.2 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133342 | agreed | 2013-07-25 | TEI8_Test | CR | 2013-07-25 |
| 2384 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction of ESM test cases 10.3.1 and 10.9.1 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133362 | agreed | 2013-07-25 | TEI8_Test | CR | 2013-07-25 |
| 2385 | - | F | Rel-11 | 11.3.0 | 11.4.0 | GCF Priority 4: Modification to TC 6.1.2.12 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133483 | agreed | 2013-07-26 | TEI8_Test | CR | 2013-07-26 |
| 2386 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Modification to TC 8.3.1.13a | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133486 | agreed | 2013-07-26 | TEI8_Test | CR | 2013-07-26 |
| 2387 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Update to test case 9.2.1.1.18 | RP-61 | RP-131097 | approved | R5 | R5-60 | R5-133510 | agreed | 2013-07-26 | TEI_Test | CR | 2013-07-26 |
| 2388 | - | F | Rel-11 | 11.3.0 | 11.4.0 | GCF Priority 3 - Correction to 6.1.2.9a test cases | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133585 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2389 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Define new TC 6.1.2.19 for Intra-frequency cell reselection with MFBI support | RP-61 | RP-131103 | approved | R5 | R5-60 | R5-133586 | agreed | 2013-08-06 | TEI9_Test | CR | 2013-08-06 |
| 2390 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Define new TC 6.1.2.21 for Inter-band cell reselection with MFBI support | RP-61 | RP-131103 | approved | R5 | R5-60 | R5-133587 | agreed | 2013-08-06 | TEI9_Test | CR | 2013-08-06 |
| 2391 | - | F | Rel-11 | 11.3.0 | 11.4.0 | GCF priority 4 - Correction to EUTRA RRC test cases 8.2.1.5 and 8.2.1.6 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133589 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2392 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to FDD-TDD test case 8.3.1.15a | RP-61 | RP-131103 | approved | R5 | R5-60 | R5-133590 | agreed | 2013-08-06 | TEI9_Test | CR | 2013-08-06 |
| 2393 | - | F | Rel-11 | 11.3.0 | 11.4.0 | GCF Priority 4 - Corrections to EUTRA-GERAN Test Case 8.4.3.3 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133591 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2394 | - | F | Rel-11 | 11.3.0 | 11.4.0 | GCF Priority 3 - Correction to test case 9.2.3.1.18a | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133592 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2395 | - | F | Rel-11 | 11.3.0 | 11.4.0 | GCF Priority 2 - Correction to test case 9.2.3.3.6 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133593 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2396 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to EMM TC 9.2.2.1.3 | RP-61 | RP-131103 | approved | R5 | R5-60 | R5-133594 | agreed | 2013-08-06 | TEI9_Test | CR | 2013-08-06 |
| 2397 | - | F | Rel-11 | 11.3.0 | 11.4.0 | GCF Priority 2 - Correction to test case 9.2.1.2.4 and 9.2.3.2.4 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133595 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2398 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to EUTRA test case 9.2.1.2.1b | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133596 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2399 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to EMM Test Case 9.2.3.1.6 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133597 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2400 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Clarification of EMM Test case 9.2.2.2.2 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133598 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2401 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Add test case Attach / Success / IMS | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133599 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2402 | - | F | Rel-11 | 11.3.0 | 11.4.0 | GCF Priority U1 – Correction to EMM test case 9.2.1.2.13 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133600 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2403 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Add test case EPS bearer context deactivation / Re-establishment | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133602 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2404 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Corrections to allow both ISIM or USIM to be used in test cases using IMS | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133603 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2405 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to SRVCC test case 13.4.3.1 | RP-61 | RP-131103 | approved | R5 | R5-60 | R5-133604 | agreed | 2013-08-06 | TEI9_Test | CR | 2013-08-06 |
| 2406 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to eMBMS test case 17.3.1 | RP-61 | RP-131114 | approved | R5 | R5-60 | R5-133605 | agreed | 2013-08-06 | TEI10_Test | CR | 2013-08-06 |
| 2407 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to eMBMS test case 17.3.2 | RP-61 | RP-131114 | approved | R5 | R5-60 | R5-133606 | agreed | 2013-08-06 | TEI10_Test | CR | 2013-08-06 |
| 2408 | - | F | Rel-11 | 11.3.0 | 11.4.0 | GCF Priority 4: Modification to TC 6.1.2.14 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133610 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2409 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Modification to TC 8.3.1.13 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133611 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2410 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Update of test case 8.3.3.2 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133613 | agreed | 2013-08-06 | TEI8_Test | CR | 2013-08-06 |
| 2411 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to CA Test Case 8.3.1.18.1 and 8.3.1.18.2 | RP-61 | RP-131111 | approved | R5 | R5-60 | R5-133733 | agreed | 2013-08-28 | LTE_CA-UEConTest | CR | 2013-08-28 |
| 2412 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to CA Test Case 8.3.1.22.1 and 8.3.1.22.2 | RP-61 | RP-131111 | approved | R5 | R5-60 | R5-133617 | agreed | 2013-08-06 | LTE_CA-UEConTest | CR | 2013-08-06 |
| 2413 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to CA Test Case 8.3.1.17.2 | RP-61 | RP-131111 | approved | R5 | R5-60 | R5-133618 | agreed | 2013-08-06 | LTE_CA-UEConTest | CR | 2013-08-06 |
| 2414 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to CA Test Case 8.2.2.3.2 | RP-61 | RP-131111 | approved | R5 | R5-60 | R5-133619 | agreed | 2013-08-06 | LTE_CA-UEConTest | CR | 2013-08-06 |
| 2415 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to CA Test Case 8.2.4.21.1 and 8.2.4.21.2 | RP-61 | RP-131111 | approved | R5 | R5-60 | R5-133620 | agreed | 2013-08-06 | LTE_CA-UEConTest | CR | 2013-08-06 |
| 2416 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Update of CA Test Case 8.2.2.3.1 | RP-61 | RP-131111 | approved | R5 | R5-60 | R5-133621 | agreed | 2013-08-06 | LTE_CA-UEConTest | CR | 2013-08-06 |
| 2417 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to CA test case 8.5.1.7 | RP-61 | RP-131111 | approved | R5 | R5-60 | R5-133622 | agreed | 2013-08-06 | LTE_CA-UEConTest | CR | 2013-08-06 |
| 2418 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to EUTRA CA RRC test cases 8.2.4.17.1 and 8.2.4.17.2 | RP-61 | RP-131111 | approved | R5 | R5-60 | R5-133623 | agreed | 2013-08-06 | LTE_CA-UEConTest | CR | 2013-08-06 |
| 2419 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction to EUTRA CA RRC test cases 8.2.4.19.1 and 8.2.4.19.2 | RP-61 | RP-131111 | approved | R5 | R5-60 | R5-133624 | agreed | 2013-08-06 | LTE_CA-UEConTest | CR | 2013-08-06 |
| 2420 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Update of Test Case 8.3.1.20 | RP-61 | RP-131113 | approved | R5 | R5-60 | R5-133646 | agreed | 2013-08-07 | eICIC_LTE-UEConTest | CR | 2013-08-07 |
| 2421 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new eICIC Test Case 8.3.1.27 | RP-61 | RP-131113 | approved | R5 | R5-60 | R5-133730 | agreed | 2013-08-27 | eICIC_LTE-UEConTest | CR | 2013-08-27 |
| 2422 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction of eICIC TC 8.3.1.19 & 8.3.1.20 | RP-61 | RP-131113 | approved | R5 | R5-60 | R5-133648 | agreed | 2013-08-07 | eICIC_LTE-UEConTest | CR | 2013-08-07 |
| 2423 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new eMDT test case 8.6.9.3 | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133660 | agreed | 2013-08-07 | eMDT_UMTSLTE-UEConTest | CR | 2013-08-07 |
| 2424 | - | F | Rel-11 | 11.3.0 | 11.4.0 | New eMBMS service continuity test case 17.4.1 | RP-61 | RP-131117 | approved | R5 | R5-60 | R5-133663 | agreed | 2013-08-07 | MBMS_LTE_SC-UEConTest | CR | 2013-08-07 |
| 2425 | - | F | Rel-11 | 11.3.0 | 11.4.0 | New eMBMS service continuity test case 17.4.2 | RP-61 | RP-131117 | approved | R5 | R5-60 | R5-133664 | agreed | 2013-08-07 | MBMS_LTE_SC-UEConTest | CR | 2013-08-07 |
| 2426 | - | F | Rel-11 | 11.3.0 | 11.4.0 | New TC 17.4.7 MBMS Interest Indication after Radio Link Failure | RP-61 | RP-131117 | approved | R5 | R5-60 | R5-133665 | agreed | 2013-08-07 | MBMS_LTE_SC-UEConTest | CR | 2013-08-07 |
| 2427 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Introduction of New eMBMS Service Continuity Improvements test case 17.4.4 | RP-61 | RP-131117 | approved | R5 | R5-60 | R5-133666 | agreed | 2013-08-07 | MBMS_LTE_SC-UEConTest | CR | 2013-08-07 |
| 2428 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new TC 8.6.2.11 Logged MDT / Logging and reporting / Reporting at intra LTE handover / PLMN list | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133667 | agreed | 2013-08-07 | eMDT_UMTSLTE-UEConTest | CR | 2013-08-07 |
| 2429 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new TC 8.6.2.12 Logged MDT / Logging and reporting / Reporting at RRC connection re-establishment / PLMN list | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133668 | agreed | 2013-08-07 | eMDT_UMTSLTE-UEConTest | CR | 2013-08-07 |
| 2430 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new TC 8.6.3.4 Logged MDT / Logging and reporting / Reporting at UTRAN Inter-RAT handover / PLMN list | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133669 | agreed | 2013-08-07 | eMDT_UMTSLTE-UEConTest | CR | 2013-08-07 |
| 2431 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new TC 8.6.6.5 Handover Failure logging / Logging and reporting / Reporting at RRC connection establishment / PLMN list | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133670 | agreed | 2013-08-07 | eMDT_UMTSLTE-UEConTest | CR | 2013-08-07 |
| 2432 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new TC 8.6.6.6 Handover Failure logging / Logging and reporting / Reporting at intra LTE handover / PLMN list | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133671 | agreed | 2013-08-07 | eMDT_UMTSLTE-UEConTest | CR | 2013-08-07 |
| 2433 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new TC 8.6.6.7 Handover Failure logging / Logging and reporting / Reporting at RRC connection re-establishment / PLMN list | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133672 | agreed | 2013-08-07 | eMDT_UMTSLTE-UEConTest | CR | 2013-08-07 |
| 2434 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new TC 8.6.9.4 Connection Establishment Failure logging / Logging and reporting / Reporting of CDMA2000 Inter-RAT measurements | RP-61 | RP-131116 | approved | R5 | R5-60 | R5-133673 | agreed | 2013-08-07 | eMDT_UMTSLTE-UEConTest | CR | 2013-08-07 |
| 2435 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Introduction of New LTE RAN Enhancements for Diverse Data Applications test case 8.2.2.6.2 | RP-61 | RP-131118 | approved | R5 | R5-60 | R5-133675 | agreed | 2013-08-07 | LTE_eDDA-UEConTest | CR | 2013-08-07 |
| 2436 | - | F | Rel-11 | 11.3.0 | 11.4.0 | New test case 8.2.2.6.1 RRC connection reconfiguration/ UE Assistance Information/power preference indication setup and release | RP-61 | RP-131118 | approved | R5 | R5-60 | R5-133676 | agreed | 2013-08-07 | LTE_eDDA-UEConTest | CR | 2013-08-07 |
| 2437 | - | F | Rel-11 | 11.3.0 | 11.4.0 | New test case 8.2.2.6.3 RRC connection reconfiguration/ UE Assistance Information/T340 running | RP-61 | RP-131118 | approved | R5 | R5-60 | R5-133677 | agreed | 2013-08-07 | LTE_eDDA-UEConTest | CR | 2013-08-07 |
| 2438 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new TC 7.1.3.X Correct handling of DL assignment / Dynamic case / EPDCCH | RP-61 | RP-131119 | approved | R5 | R5-60 | R5-133679 | agreed | 2013-08-07 | LTE_enh_dl_ctrl-UEConTest | CR | 2013-08-07 |
| 2439 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new TC 7.1.3.Y Correct handling of DL assignment / Semi-persistent case / EPDCCH | RP-61 | RP-131119 | approved | R5 | R5-60 | R5-133680 | agreed | 2013-08-07 | LTE_enh_dl_ctrl-UEConTest | CR | 2013-08-07 |
| 2440 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Update of TC 6.2.1.1 Inter-RAT PLMN Selection for OPLMN Automatic mode | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133723 | agreed | 2013-08-27 | TEI8_Test | CR | 2013-08-27 |
| 2441 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Define new TC 6.1.2.20 for Inter-frequency cell reselection with MFBI support. | RP-61 | RP-131103 | approved | R5 | R5-60 | R5-133692 | agreed | 2013-08-08 | TEI9_Test | CR | 2013-08-08 |
| 2442 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Update of Test Case 8.2.4.13a | RP-61 | RP-131103 | approved | R5 | R5-60 | R5-133732 | agreed | 2013-08-28 | TEI9_Test | CR | 2013-08-28 |
| 2443 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new MFBI test case: 8.2.4.22 RRC connection reconfiguration / Handover / MFBI / target cell broadcasting information disregarded by the UE | RP-61 | RP-131103 | approved | R5 | R5-60 | R5-133695 | agreed | 2013-08-08 | TEI9_Test | CR | 2013-08-08 |
| 2444 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Update of Emergency Call over IMS test case 11.2.7 | RP-61 | RP-131103 | approved | R5 | R5-60 | R5-133696 | agreed | 2013-08-08 | TEI9_Test | CR | 2013-08-08 |
| 2445 | - | F | Rel-11 | 11.3.0 | 11.4.0 | New eMBMS service continuity test case 17.4.6 | RP-61 | RP-131117 | approved | R5 | R5-60 | R5-133699 | agreed | 2013-08-08 | MBMS_LTE_SC-UEConTest | CR | 2013-08-08 |
| 2446 | - | F | Rel-11 | 11.3.0 | 11.4.0 | New eMBMS service continuity test case 17.4.8 | RP-61 | RP-131117 | approved | R5 | R5-60 | R5-133700 | agreed | 2013-08-08 | MBMS_LTE_SC-UEConTest | CR | 2013-08-08 |
| 2447 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Addition of new Rel-10 eICIC test case 8.3.1.21 | RP-61 | RP-131113 | approved | R5 | R5-60 | R5-133707 | agreed | 2013-08-08 | eICIC_LTE-UEConTest | CR | 2013-08-08 |
| 2448 | - | F | Rel-11 | 11.3.0 | 11.4.0 | Correction of EUTRA RRC test case 8.5.4.1 | RP-61 | RP-131101 | approved | R5 | R5-60 | R5-133725 | agreed | 2013-08-27 | TEI8_Test | CR | 2013-08-27 |
page generated from database: 2013-10-16 10:34:31