# HG changeset patch # User Mychaela Falconia # Date 1639970963 0 # Node ID 8e26cb57c7f8a74fdf20062eb24d122658ca02b6 # Parent 634995d556016efb85a2f78ee48d9ae0d4ba5548 doc/Test-system-interface: additions for Tx ramp testing diff -r 634995d55601 -r 8e26cb57c7f8 doc/Test-system-interface --- a/doc/Test-system-interface Mon Dec 20 02:36:02 2021 +0000 +++ b/doc/Test-system-interface Mon Dec 20 03:29:23 2021 +0000 @@ -36,12 +36,31 @@ This command is used during Tx power level calibration procedures to tell the RF test system to switch to a different channel. +txpwr-cal-pcl pcl + +This command is used during Tx power level calibration procedures to tell the +RF test system which PCL is being tested - it allows the RF test system to +prepare for the expected power level and select the right template for ramp +tolerance checking. + power-meas This command directs the RF test system to take a power level measurement (txpwr-cal-setup must have been performed previously) and report it back to the client in the response line. +power-meas ramp + +This command is the same as more basic power-meas, but it tells the TSID that +the client is interested not only in the power level measurement, but also needs +the RF test system to evaluate the ramp put out by the DUT, according to the PCL +template selected earlier with txpwr-cal-pcl. The response consists of the dBm +power measurement and a ramp status keyword, separated by white space. + +A given TSID implementation may ignore the ramp keyword after power-meas and +always return both values, if the actual RF test instrument always returns both +on the same query. + signal-gen-setup band This command is sent to the TSID to prepare the RF test system for tests in