comparison doc/Test-system-interface @ 113:01bae2629ffd

doc/Test-system-interface: txpwr-cal-channel addition documented
author Mychaela Falconia <falcon@freecalypso.org>
date Tue, 13 Feb 2018 04:39:33 +0000
parents 20e2b4571cd6
children 8e26cb57c7f8
comparison
equal deleted inserted replaced
112:fbfbd813c9b4 113:01bae2629ffd
29 This command is sent to the TSID to prepare the RF test system for the Tx power 29 This command is sent to the TSID to prepare the RF test system for the Tx power
30 level calibration procedure. The first argument after the command keyword is 30 level calibration procedure. The first argument after the command keyword is
31 the band to be used (850, 900, 1800 or 1900) and the second argument is the 31 the band to be used (850, 900, 1800 or 1900) and the second argument is the
32 ARFCN in that band on which the DUT will be transmitting. 32 ARFCN in that band on which the DUT will be transmitting.
33 33
34 txpwr-cal-channel arfcn
35
36 This command is used during Tx power level calibration procedures to tell the
37 RF test system to switch to a different channel.
38
34 power-meas 39 power-meas
35 40
36 This command directs the RF test system to take a power level measurement 41 This command directs the RF test system to take a power level measurement
37 (txpwr-cal-setup must have been performed previously) and report it back to the 42 (txpwr-cal-setup must have been performed previously) and report it back to the
38 client in the response line. 43 client in the response line.